NEW FLIGHT PATHS AND STANSTED SECOND RUNWAY - PowerPoint PPT Presentation

1 / 36
About This Presentation
Title:

NEW FLIGHT PATHS AND STANSTED SECOND RUNWAY

Description:

Excludes Stansted 2nd runway. First phase of plans out to 2030 to align with ATWP ... Second Runway. Massive 2 square mile land grab more for buffer zone ... – PowerPoint PPT presentation

Number of Views:118
Avg rating:3.0/5.0
Slides: 37
Provided by: sseadmin
Category:

less

Transcript and Presenter's Notes

Title: NEW FLIGHT PATHS AND STANSTED SECOND RUNWAY


1
NEW FLIGHT PATHSANDSTANSTED SECOND RUNWAY
  • PRESENTATION TO
  • STANSTEAD ABBOTTS PARISH COUNCIL
  • 17 JULY 2008

2
New Flight Paths
  • Overview and changes proposed
  • Impact on Stanstead Abbotts
  • Noise disturbance
  • NATS consultation

3
Overview of TCN and Changes Proposed (1)
  • TCN region over 12 million people across five
    counties
  • Changes out to 2014
  • Effects arrival routes, holds and departure
    routes
  • Airlines are NATS customers and major
    shareholders

4
Overview of TCN and Changes Proposed (2)
  • Heathrow, Stansted, Luton, London City, Northolt
    smaller airports and military airfields
  • Not all routes are being changed
  • Excludes Stansted 2nd runway
  • First phase of plans out to 2030 to align with
    ATWP

5
TCN Region
6
One Days Flight Paths through TCN in 2006
7
Tranquility Map 2006
8
Tranquility Map with Departures and Arrivals
9
Impact on Stanstead Abbotts
  • New Stansted easterly arrival route
  • New Luton departure routes
  • New Northolt departure routes
  • Concentration on route centrelines
  • Overflying less densely populated areas

10
Current Stansted Easterly Arrivals
11
Proposed Stansted Easterly Arrivals
12
Proposed Stansted Easterly Arrivals
STANSTED MOUNTFITCHET
BISHOPS STORTFORD
13
Current Luton Easterly Departures to SE
14
Proposed Luton Easterly Departures to SE
15
Summary of impact on Stanstead Abbotts
  • Stansted arrival change beneficial
  • Luton and Northolt change slightly beneficial
  • Overall beneficial with traffic at current levels

16
Noise Disturbance (1)
  • Noise impact defined by number of people affected
    rather than amount of noise they are exposed to
  • Routes moved to less densely populated areas
  • Current tranquil areas will suffer from more noise

17
Noise Disturbance (2)
  • Measured by Lmax levels
  • But aircraft numbers and duration important
    factors
  • Aircraft noise has low frequency and tonal
    characteristics which increase annoyance
  • Low background noise environment

18
Equivalent Lmax Levels
19
NATS Consultation
  • Closed on 19 June 2008
  • Results published on 22 July
  • Implemented April 2009 onwards
  • Can still write to CAA
  • Copy your MP

20
Stansted Second Runway
21
Maximum use of R1
  • BAA wants increase from 25 to 35 mppa
  • Flights increase from 550 to 700 per day
  • Could eventually be 45 or 50 mppa
  • Awaiting Govt decision
  • Delayed since BAA admitted understating pollution
    and road traffic impacts
  • AND passenger numbers are now falling

22
Second Runway
  • Before R1 decided, BAA lodged R2 application
  • Will be called in for Public Inquiry
  • Starts next year and last 12 months
  • Inspector submits report in 2010
  • Government decision in 2011

23
(No Transcript)
24
(No Transcript)
25
Second Runway
  • Massive 2½ square mile land grab more for
    buffer zone
  • Destruction of 73 homes including 13 listed
    buildings
  • Triple the passengers to 68 million
  • Flights increase from 550 to 1380 per day
  • Extra 11 million tonnes air pollution per year

26
(No Transcript)
27
(No Transcript)
28
Hertford East Train Services
  • Currently basic service 2 trains/hour (3/hour
    peak) suffering high levels of overcrowding
  • Particularly Liverpool Street service since some
    now have Stratford as destination
  • STEX services with 4 trains/hour eat up capacity
  • Network Rail looking at longer trains and
    additional tracks
  • BAA assume airport rail work complete end-2017
  • Without better services before airport expansion,
    Hertford East service will get worse

29
(No Transcript)
30

31
All UK wind farms save 4½ million tonnes per
year Only equates to ? year full use of existing
runway
32
Opposition to Second Runway
  • Parish, District, County Councils
  • East of England Regional Authority
  • MPs and MEPs
  • Conservation Groups
  • SSEs 7,000 members
  • Local communities

33
What you can do
  • Respond to R2 consultation to Uttlesford District
    Council by 26 September
  • Copy your MP
  • Support SSE
  • R2 is not inevitable WE CAN WIN

34
Root Cause
Airport expansion more noise more CO2
emissions
35
QUESTIONS AND ANSWERS
36
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com