Title: NEW FLIGHT PATHS AND STANSTED SECOND RUNWAY
1NEW FLIGHT PATHSANDSTANSTED SECOND RUNWAY
- PRESENTATION TO
- STANSTEAD ABBOTTS PARISH COUNCIL
- 17 JULY 2008
2New Flight Paths
- Overview and changes proposed
- Impact on Stanstead Abbotts
- Noise disturbance
- NATS consultation
3Overview of TCN and Changes Proposed (1)
- TCN region over 12 million people across five
counties - Changes out to 2014
- Effects arrival routes, holds and departure
routes - Airlines are NATS customers and major
shareholders
4Overview of TCN and Changes Proposed (2)
- Heathrow, Stansted, Luton, London City, Northolt
smaller airports and military airfields - Not all routes are being changed
- Excludes Stansted 2nd runway
- First phase of plans out to 2030 to align with
ATWP
5TCN Region
6One Days Flight Paths through TCN in 2006
7Tranquility Map 2006
8Tranquility Map with Departures and Arrivals
9 Impact on Stanstead Abbotts
- New Stansted easterly arrival route
- New Luton departure routes
- New Northolt departure routes
- Concentration on route centrelines
- Overflying less densely populated areas
10Current Stansted Easterly Arrivals
11Proposed Stansted Easterly Arrivals
12Proposed Stansted Easterly Arrivals
STANSTED MOUNTFITCHET
BISHOPS STORTFORD
13Current Luton Easterly Departures to SE
14Proposed Luton Easterly Departures to SE
15Summary of impact on Stanstead Abbotts
- Stansted arrival change beneficial
- Luton and Northolt change slightly beneficial
- Overall beneficial with traffic at current levels
16Noise Disturbance (1)
- Noise impact defined by number of people affected
rather than amount of noise they are exposed to - Routes moved to less densely populated areas
- Current tranquil areas will suffer from more noise
17Noise Disturbance (2)
- Measured by Lmax levels
- But aircraft numbers and duration important
factors - Aircraft noise has low frequency and tonal
characteristics which increase annoyance - Low background noise environment
18Equivalent Lmax Levels
19NATS Consultation
- Closed on 19 June 2008
- Results published on 22 July
- Implemented April 2009 onwards
- Can still write to CAA
- Copy your MP
20Stansted Second Runway
21Maximum use of R1
- BAA wants increase from 25 to 35 mppa
- Flights increase from 550 to 700 per day
- Could eventually be 45 or 50 mppa
- Awaiting Govt decision
- Delayed since BAA admitted understating pollution
and road traffic impacts - AND passenger numbers are now falling
22Second Runway
- Before R1 decided, BAA lodged R2 application
- Will be called in for Public Inquiry
- Starts next year and last 12 months
- Inspector submits report in 2010
- Government decision in 2011
23(No Transcript)
24(No Transcript)
25Second Runway
- Massive 2½ square mile land grab more for
buffer zone - Destruction of 73 homes including 13 listed
buildings - Triple the passengers to 68 million
- Flights increase from 550 to 1380 per day
- Extra 11 million tonnes air pollution per year
26(No Transcript)
27(No Transcript)
28Hertford East Train Services
- Currently basic service 2 trains/hour (3/hour
peak) suffering high levels of overcrowding - Particularly Liverpool Street service since some
now have Stratford as destination - STEX services with 4 trains/hour eat up capacity
- Network Rail looking at longer trains and
additional tracks - BAA assume airport rail work complete end-2017
- Without better services before airport expansion,
Hertford East service will get worse
29(No Transcript)
30 31All UK wind farms save 4½ million tonnes per
year Only equates to ? year full use of existing
runway
32Opposition to Second Runway
- Parish, District, County Councils
- East of England Regional Authority
- MPs and MEPs
- Conservation Groups
- SSEs 7,000 members
- Local communities
33What you can do
- Respond to R2 consultation to Uttlesford District
Council by 26 September - Copy your MP
- Support SSE
- R2 is not inevitable WE CAN WIN
34Root Cause
Airport expansion more noise more CO2
emissions
35QUESTIONS AND ANSWERS
36(No Transcript)