SNuMI: getting ready for the Directors review - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

SNuMI: getting ready for the Directors review

Description:

2. Elements of the Plan. WBS 1.1 Recycler upgrades (P. Derwent) ... 3. Cost and schedule (J. Sims, K. Domann) 4. Proton projections (A. Marchionni) ... – PowerPoint PPT presentation

Number of Views:67
Avg rating:3.0/5.0
Slides: 9
Provided by: albe261
Category:

less

Transcript and Presenter's Notes

Title: SNuMI: getting ready for the Directors review


1
SNuMI getting ready for the Directors review
July 10, 2006
  • Final report from AAC review
  • P5 Report to HEPAP July 6, 2006
  • Request from Steve Holmes for SNuMI Directors
    Review CD-1 style
  • Conceptual design report

2
From AAC Review in May
3
P5 Report to HEPAP, July 6, 2006
4
P5 Report to HEPAP, July 6, 2006
5
Directors review
Ed, I would like to ask you to organize a
Director's Review of the SuperNuMI project. The
current thinking is that given the scope of this
effort (several x 10M, including a major MIRF
upgrade) it will be best handled by executing as
a Major Item of Equipment (MIE) Project. The
scope of the review should encompass the complete
set of upgrades required to move the intensity on
target to 1 MW or greater. This should include
both the accelerator and target station
modifications required, and all
project documentation required to establish a
CD-1 style baseline range. In order to
initiate funding in FY2009 we need to be
conducting this review in the October-November
timeframe. My assumption is that AD can be ready
for such a review by October, so Roger or Alberto
should let us know asap if this is not the case.
At this time I would like to try to identify
tentative dates for the review. Could you please
let us know what dates are consistent with
your calendar in October and November. Once we
have established dates we will start assembling a
committee, writing the charge, agenda,
etc. Thanks, Steve
6
CD-1 review
  • CD-1 review (DoE order 413.3)
  • Critical decision prerequisites
  • Conceptual Design Report
  • Project Data Sheet for design
  • Acquisition plan
  • Preliminary Project Execution Plan and baseline
    range
  • Verification of mission need
  • Preliminary Hazard Analysis Report

7
SNuMI scenarios
8
Super-beam upgrades to the NuMI facility
Conceptual Design Report
  • Executive Summary (A. Marchionni)
  • 1. Introduction
  • Present operating conditions (A. Marchionni)
  • Planned proton Plan upgrades (E. Prebys)
  • SNuMI upgrade plan (A. Marchionni)
  • Beam Physics issues (B. Zwaska)
  • 2. Elements of the Plan
  • WBS 1.1 Recycler upgrades (P. Derwent)
  • WBS 1.2 NuMI upgrades (M. Martens)
  • WBS 1.3 Booster upgrades (E. Prebys)
  • WBS 1.4 Main Injector upgrades (I. Kourbanis)
  • WBS 1.5 Accumulator upgrades (???)
  • 3. Cost and schedule (J. Sims, K. Domann)
  • 4. Proton projections (A. Marchionni)
Write a Comment
User Comments (0)
About PowerShow.com