Construction of a 2-MG tank to increase storage capacity of potable water. ... Revise minimum release schedule from Delaware Lake Reservoir. ... – PowerPoint PPT presentation

Number of Views:61
Avg rating:3.0/5.0
Slides: 15
Provided by: ronica
Category:

less

Transcript and Presenter's Notes

Title: City of Delaware Public Utilities Department


1
City of Delaware Public Utilities Department
  • Executive Summary June 2006

Viewable at www.delawareohio.net/departments/Publ
ic20Utilities
2
Project Update
3
Project Update Cont. 2
4
Project Update Cont. 3
5
Wastewater Treatment OM
  • Wastewater Treated 5.15 MGD Influent Average
  • Violations in June 0
  • Plant Lift Station Maintenance
  • Completed monthly preventative maintenance
  • DMR QA Study 26 Conducted
  • Repaired (2) Damaged Anoxic Mixer Cords
  • 1 Tertiary Filter Screw Pump Drive and Motor
    repairs
  • Installed The Non Potable Water Foam Spray Pump
  • Replaced belts on the Belt Filter Press
  • Hayes Colony Pinecrest Lift Stations
    decommissioned
  • Honeywell Chart Recorder (_at_ BFP) Repaired
  • Adjusted limit switch on Transverse conveyor
    (twice)
  • UVT Analyzer system cleaned
  • Repaired a Non Potable water leak at the base of
    the Tertiary Screw Pumps
  • Replaced the Air filters in the Administration
    Bldg roof top HVAC Units
  • Retightened the gear box on the Old BFP
    Conveyor.
  • Repaired facility lights
  • Training
  • 6/13/06 Chemical Safety (Chlorine, Sodium
    Hypochlorite Hydroxide, Ferric Chloride)

6
Wastewater Budget Graphs
7
Wastewater NPDES Permit
8
Collection Sys. Div. OM
  • New Sewer Permits in June - 23
  • Amount of Sewer TVed in June 5050 ft.
  • Amount of Root Treatment Performed 7810 ft.
  • Lift Station Overflows in June - 0
  • Sanitary Sewer Backups in June 0
  • Days Since Last Main Blockage 70
  • Maintenance/Repairs
  • Installed blacktop David St., Liberty Rd.,
    Sandusky St., Liberty St., Forest Ave., E.
    Central Ave., London Rd., E. William.
  • June 2nd - Flooding issues all over.
  • 147 Lake St. Installed 36 storm sewer pipe 20
    ft.
  • Pumped Curve Road Landfill.
  • Updated storm sewer maps.
  • Hauled several loads of leachate from Curve Road
    Landfill.
  • Checked storm water outfalls.
  • Check lift stations weekly.
  • Cleaned catch basin tops city wide.
  • Cleaned backyard at WWTP.
  • 170 Somerset checked sinkhole tved sewer
    lowered catch basin.
  • Dye tested sanitary sewer at County Fair Grounds.

9
Water Plant Maintenance
  • Water Pumped 3.52 MGD Average
  • EPA Violations 0
  • Maintenance Hours 180 Hrs.
  • June Activities
  • Sent out backflow test notices for Jun
  • Rebuilt the 3 high service pump
  • CMMS Training
  • SIMS Training
  • Rebuild 6 filter effluent meter
  • Installed new control board in Porta-Pac Carbon
    Feeder
  • Chlorine safety training
  • Installed cable across entrance and NO
    Trespassing signs at Penry Wellfield
  • Prepared next quarter lab monitoring schedule
  • WAG Meeting on Water Master Plan
  • Revised bacteria sampling site for EPA
  • Washed filter bed walls
  • Fabricated new brace to hold selonoid on H.S.
    Pump
  • Worked on 5 filter to waste valve not closing

10
Water Treatment Plant
11
Water Treatment Plant
12
Distribution Sys. Division O M
  • New Water Permits 23
  • OUPS Locates 137 _at_ 74.5 reg. hrs 9 OT hrs
  • Meters Read 5878 _at_ 99 reg. hrs
  • Accounts Serviced 874 _at_ 290.5 reg. hrs. 13 OT
    hrs.
  • New Meter Installations 41
  • Water Service Shutoffs 1196 mailed
  • Meter Pit Installations 11
  • Service Line Maintenance Events 3
  • Hydrants Repaired / Replaced 10
  • Main Valves Repaired / Replaced 1
  • Main Line Repair Events 2
  • Devon Rd.- perforated main
  • Havens Rd.- split main
  • Unaccounted for Water Running Avg. 3.75
  • Large Meter Change Outs 0
  • Large Meters Tested - 0
  • Backflow Program
  • Surveyed 13 industrial customers individual
    backflow devices,
  • Surveyed 1 institutional customer with 89
    individual backflow devices
  • Surveyed 2 residential customer irrigation
    systems.
  • Mailed second backflow device activation letter
    to small main project meter pit installation
    addresses.
  • Mailed first backflow device activation letter to
    Dist. Sys. Div. meter pit installation
    addresses.
  • Miscellaneous
  • Performed bi-monthly system flushing schedule
    including selected dead end sites.
  • Installed and maintained 6 auxiliary hydrant
    meter units for contractors water usage purposes.
  • Activated 11 new meter pits.

13
FTE Efficiency
14
City of Delaware Public Utilities Department
Executive Summary June 2006