SERAI FIRST GAS
  • The Serai subsea facilities are designed for 300
    MMscf/d, consisting of 2 subsea wells and trees
    connected by 8 flowlines to a pipeline manifold.
  • Each tree is equipped with a control system via
    an umbilical extension from M4. The total
    production from subsea wells is sent via a 14,
    CRA cladded, 10 Km pipeline to the M3.
  • Unique features or technologies deployed in Serai
    are
  • Suction Piles on PLEM (Pipe Line End
    Manifold)
  • Fiscal Metering
  • Subsea split gate valves (used for double
    block and bleed)
  • Subsea tie-back umbilical from M4

SERAI
BUTA
M4
PLEM
2 subsea wells
10 km x 14 CRA Clad Pipeline
PLEM with suction piles
5.6 km subsea tie-back umbilical
Fiscal Metering
From M1
To E11R-B