Glenn Hodges Darrell Tucker - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

Glenn Hodges Darrell Tucker

Description:

Exposure to 483's and Warning Letters due to documentation errors within calibration ... Storage Cabinets. 6. CCMS Implementation Results. Where We Are Today ... – PowerPoint PPT presentation

Number of Views:48
Avg rating:3.0/5.0
Slides: 16
Provided by: wall69
Category:
Tags: darrell | glenn | hodges | tucker

less

Transcript and Presenter's Notes

Title: Glenn Hodges Darrell Tucker


1
Paperless Computerized Calibration Management
System (CCMS) Implementation
  • Glenn Hodges / Darrell Tucker

ISPE Technology ShowDurham, NCMarch 21, 2007
2
Business Challenges Facing Calibration
  • Exposure to 483s and Warning Letters due to
    documentation errors within calibration
  • gt5 of completed calibrations contain cGMP
    documentation errors
  • Need for a validated calibration application
  • Calibration-related Investigation resolution
    consumes an average of 30 days
  • Average cost of 10,000 per Investigation
  • Inconsistent approaches to calibration management
    across sites
  • Process calibration procedural differences
  • Various out-of-compliance technology platforms
    across sites
  • Accessibility of electronic data limited due to
    21 CFR Part 11 issues, multiple incompatible data
    sources, within and across sites, paper-based
    recording and tracking
  • Insufficient control of calibration standards
  • Inconsistent procedures for identifying ,
    tracking reverse traceability

3
CCMS Project Costs
  • Total Cost of Local Site Project
  • Project Investment of 1.2 Million
  • Third Party Integrator hired to assist in CCMS
    Implementation
  • Integrator Cost of approximately 700K
  • Developed all Validation Documentation
  • SME on Calibration Manager application
  • Coordinated executed majority of Validation
    testing
  • Data Migration Process
  • 8 Data Entry Clerks at a cost of approximately
    100K
  • Application Data Import cost of 1.5 K per
    snapshot
  • Performed 5 data import snapshots during data
    migration process
  • Software / Hardware
  • 37 Laptops (33 Regular, 4 Rugged Duty) purchased
    for data entry by technicians, 58,000, plus
    Satellite license cost of 16,650 (37 _at_ 450
    each)
  • 50 Site Licenses for Enterprise Application,
    62,500 (50 _at_ 1250 each)
  • Report Development Software, 35,000 for
    unlimited license

4
Paperless CCMS Implementation Efforts
  • Basic Data
  • Imported 7800 instrument records
  • Created and imported 7800 Measurement Data
    Templates (MDTs)
  • Test points 43,000
  • Calibration SOPs
  • High Priority 8
  • Supporting Job Aids 7
  • Low Priority 25
  • Training
  • Basic Navigation 1 (Core)
  • Roles Based 5 roles
  • Participants 260
  • Identify Super users

5
Paperless CCMS Implementation Efforts (cont.)
  • Basic Data
  • Validation Documentation
  • Core (Validation Plan, URS/FS, Configuration
    Spec., IQ, OQ)
  • Site Specific (Validation Plan, URS/FS, Design
    Spec., IQ, OQ/PQ)
  • Business Continuity
  • Data Migration
  • Cut-Over Plan
  • Report Design Specification
  • Hardware
  • Servers Enterprise
  • Laptops Site only, 34 regular and 6
    ruggedized
  • Recharging stations and extra batteries
  • Storage Cabinets

6
CCMS Implementation Results
  • Where We Are Today
  • 100 Equipment Master / MDT data verification was
    conducted after data migration
  • Approximately 1100 scheduled calibrations are
    performed per month
  • 98 of calibrations are performed on Satellites /
    Laptops
  • Average number of users in local site dataset at
    anytime 20 30
  • Total number of active users 250
  • Electronic signature approvals required for all
    records
  • Use the Select / Sorts to pull those records
    based on Routing Status.

7
What We Learned
  • Recommendations / Lessons Learned
  • General
  • Assigned subject matter experts (SME's) are vital
    to each sites project.
  • Provide input on every element
  • Time commitments will increase as the project
    progresses.
  • Required for all facets of implementation
  • Establish attainable schedule
  • Review and obtain support / agreement from SME's
    and approvers on overall timeline requirements
  • Document review cycles generally must be closely
    monitored
  • Resource availability for support will be a
    continuous challenge and has to be constantly
    managed

8
What We Learned (cont.)
  • Recommendations / Lessons Learned
  • Business Process
  • Start Business Process review and development as
    early as possible
  • Develop Business Flow Diagrams using roles based
    swim lanes
  • Establish site To Be (Core and Site Specific)
  • Develop and integrate Electronic signatures
  • Identify issues associated with site specific
    processes
  • Determine application signature rules (If
    available)
  • Create process scenarios of preliminary flows
  • Build scenario scripts based on roles,
    responsibilities and e-signatures
  • Establish a working environment with working data
  • Involve multiple users who will be performing
    business processes for their future roles
  • Work in conjunction with SOP development

9
What We Learned (cont.)
  • Recommendations / Lessons Learned
  • Validation Documentation
  • Documentation approvals
  • Have designated approvers and alternates
    identified
  • Bring site QA in early to get agreement on
    requirements and leveraging
  • Build approval times into project schedule
  • Leverage documentation from other sites
  • Application Help Desk Support
  • Application Support Development
  • Develop Enterprise Help Support Paths
  • Develop Site Specific Application SME Support
    Paths
  • Establish Corporate IS/ Site IS / Site
    Application Support Roles

10
What We Learned (cont.)
  • Recommendations / Lessons Learned
  • GMP Document Development
  • Assess type, number and impact of changes to
    current documentation
  • SOPs
  • Knowledge Checks and Answer Keys for SOPs
  • Courses
  • Job Aids
  • SOP Accelerated Process Model
  • Schedule SME Review Meeting, Bring Draft with
    Proposed Revisions and Review Revisions
  • Integrate Review Content while developing
    training material in parallel
  • Final SME Review and Peer Review in parallel
  • Resource Recommendation
  • Technical Writer and Administrative Assistant to
    help with word processing and preparation of
    Document Approval Request (or similar) forms
  • Single point of contact in Document Control
    identified to the project

11
What We Learned (cont.)
  • Recommendations / Lessons Learned
  • Data Cleansing and Migration
  • Dedicated SME effort
  • Review legacy system or paper-based system for
    data improvements
  • Identify data that requires normalization
  • May become the basis for picklists
  • If legacy system not currently validated, begin
    the data cleansing process prior to migration
  • Watch for spaces and other editorial input errors
  • Perform multiple snapshots to verify data
    conversion into the application
  • Consider pick lists types as part of the
    normalization effort
  • Fixed, Append, Force Append
  • Consider the impact from a data maintenance
    perspective
  • Have error checks created for comparison of
    picklist to field data

12
What We Learned (cont.)
  • Recommendations / Lessons Learned
  • Measurement Data Templates
  • Determine if and how MDTs will be used
  • One-to-one or one-to-many
  • Recommend that a double blind method be used for
    creating new records.
  • SME Led-effort
  • Hands-on MDT creation or guides data entry effort
  • Interpretation of data
  • Schedule compliance
  • MDT verification
  • Conversion of existing data to application
    structure

13
What We Learned (cont.)
  • Recommendations / Lessons Learned
  • Change Management / Training Considerations
  • Identify a Change Management resource early to
    lead the change / training effort
  • Develop Training Process Map (Spreadsheet)
  • Trainers
  • Logistical Considerations and Planning
  • Corporate Material and Roles based training
    material has been developed
  • Integrate with site SOP development
  • Set-up Change Workshops
  • Key Communications
  • Practice Sessions
  • Provide a Help Process

14
What We Learned (cont.)
  • Recommendations / Lessons Learned
  • Reports
  • Define reporting requirements with all
    stakeholders
  • SME's
  • Super Users
  • User groups
  • Calibration
  • QA
  • Path to design
  • Establish only the basics in URS
  • Begin report technical specifications
  • Allows report development process to continue
    without bogging down the design specification
    approval
  • Can incrementally approve report design among
    designer and stakeholder
  • Establish a set time frame
  • Convert to Design Specification for Reports when
    complete
  • For validation purposes

15
Paperless CCMS ?
Write a Comment
User Comments (0)
About PowerShow.com