Installation Transformation Requirements Development Process PowerPoint PPT Presentation

presentation player overlay
1 / 4
About This Presentation
Transcript and Presenter's Notes

Title: Installation Transformation Requirements Development Process


1


Ad Hoc Committee Barracks Standards Future Tech
Gary Skusek DAIM FDC Construction Program
Manager (703) 692-9213 skusekgs_at_hqda.army.mil
2
Barracks Standards Future Tech Items to Brief
  • We already have pathway (extra conduit) to
    barracks as part of I3A design standards
  • 2 conduits 1 spare
  • Enlarge communications closets to accept
    potential new technologies (new systems not
    always smaller)
  • Additional pathways between comm closets
  • Need to specify materials available overseas
  • Policy to USACE to not to Value Engineer these
    items out of a project

3
Barracks Standards Future Tech Items to Brief
  • Need to provide data about current copper (Cat 6)
    capabilities
  • Streaming Video
  • 100 megabytes/sec
  • Do not install dark fiber
  • Infrastructure issues I3MP has barracks as Tier
    4
  • Bandwidth bottleneck getting off post
  • Would need additional funding

4
Barracks Standards Future Tech
  • Anything Else?
  • Comments?
  • Open Discussion
Write a Comment
User Comments (0)
About PowerShow.com