T-37/T-38System Program ManagerLt Col Troy
Lanier508MASSG/GFMTDSN 586-1203
2
T-38 Program Overview
  • TRAINING MISSION
  • Primary Undergraduate Trainer
  • 111,800 Flight Hours (AETC)
  • 538 USAF Active
  • MAINTENANCE/SUPPORT
  • Air Vehicle
  • Contract/Civil Service Maintenance
  • Sustaining Engineering Support
  • J85 Engine
  • Civil Service Maintenance
  • Sustaining Engineering Support
  • Ground Based Training System
  • Contract Maintenance
  • Sustaining Engineering Support

Sheppard 114
Moody 68
3
T-38 Prioritized Requirements
Modification Programs
Sustainment Efforts
  • 1. Improved Anti-skid Brake
  • Landing Gear
  • Gearbox Seal
  • -33 Wing Production

4
T-38 Landing Gear Overhaul
  • OH Nose and Main Landing Gear
  • Fleet wide over 5 years 36 M potential
  • Strut, Cylinder and other misc associated parts

5
Projected T-38 Landing Gear Overhaul
  • Program T-38 Landing Gear overhaul
  • Scope All T-38 Nose and Main Gear
  • Key Requirements
  • Support parts requirements
  • Validate Fatigue Critical Locations (FCL)
  • Schedule Pending
  • Budget 36M est. Type MSD Funds
  • POC Sherry Nielsen, Program Manager, 84
    CSUG/GBCLA, T-38, T37, F-5 Gear 777-1991
  • Acquisition Strategy Full Open Competition

6
T-38 Gearbox Seal Improvement Project
  • Project would select a seal to improve
    reliability and service life of gearbox
  • Assess the failure mode of current seal
  • Identify a more effective functionally and
    economically off-the-shelf seal
  • Address any interface issues that may arise
    between seal and adapter plate

7
Projected T-38Sustainment Effort
  • Program Gearbox Improvement Project
  • Scope Study, Analysis, Prototype, Test, Tech
    Data
  • Key Requirements
  • 50 reduction seal failures
  • 75 reduction in seal replacements
  • Schedule Sep 2007
  • Budget 120,000 Type GSD Funds General
    Support Division Funds
  • POC 84th MSUG/GMLSB/Adam Hamblin / 777-9356
    adam.hamblin_at_hill.af.mil
  • Acquisition Strategy Full Open Competition or
    Design Engineering Support Program

8
T-38 -33 Wing Improvement Program
  • Improve Fatigue Critical Locations (FCL)
  • Increased Life Cycle from 3,690 to 6,500 Hours
  • Introduction to Fighter Fundamentals (IFF)
    Mission
  • Technical Data Package (TDP) developed
  • Includes all Engineering Drawing/Specs
  • Data Rights-USAF Own
  • Foster a competitive procurement effort

9
T-38 -33 Wing Improvement Program
  • Program T-38 -33 Wing Program
  • Scope -33 Wing Procurement
  • Key Requirements
  • Manufacture wing to specifications
  • SCHEDULE TBD
  • BUDGET 15M TYPE MSD
  • POC 508th MASSG/GFMTT/ Hector Sanchez/586-3665
    hector.sanchez_at_hill.af.mil
  • Acquisition Strategy Full and Open Competition