The BoNuS Detector - PowerPoint PPT Presentation

1 / 25
About This Presentation
Title:

The BoNuS Detector

Description:

Production curved, custom GEMs. June test run in CLAS. Prototypes ... pRTPC w/ Inverter/Driver Cards. Ribbons. To. Readout. System. Detector System Tests. Readout ... – PowerPoint PPT presentation

Number of Views:54
Avg rating:3.0/5.0
Slides: 26
Provided by: hcf2
Category:
Tags: bonus | detector

less

Transcript and Presenter's Notes

Title: The BoNuS Detector


1
The BoNuS Detector
  • Concept
  • Design
  • Status

Howard Fenker March 11, 2005
2
Detector Concept
3
Detector Parameters
  • Geometric Acceptance
  • Sensitive over 148 deg. In phi, 20cm in Z.
  • Momentum Acceptance
  • Protons from 70 MeV/c
  • Proton Identification (next slide)
  • Vertex Z resolution lt 10mm
  • Track Momentum Resolution
  • Track E information from dE/dx - studying
  • Rate Timing Issues

4
Proton ID by dE/dx Curvature
100 MeV/c pion
100 MeV/c proton
5
Detector Parameters
  • Rate Timing Issues
  • Track latency in sensitive gas 1-2 us
  • Electronic memory prior to trigger 1.5 us
  • Event Size 0.5 10 kBytes (background?)
  • Deadtime
  • Trigger charge collection interval. ALTRO is
    ready for new trigger immediately afterwards.
  • Data Readout Rate gt 20 Mbytes/second
  • Expected event rate capability 2 kHz

6
Detector Development
  • Prototype flat, standard GEMs
  • Test
  • Prototype curved, standard GEMs
  • Test
  • Prototype flat, custom GEMs
  • Test
  • Production curved, custom GEMs
  • June test run in CLAS

7
Prototypes
8
Production Model Exploded View
9
Production Model
10
BoNuS Target (11/04)
11
BoNuS in CLAS
12
Electronics Development
  • Commercial CAMAC Modules 8 ch.
  • Test the whole concept
  • Cosmic / Source / TUNL Run1
  • ALTRO Test Board 16 ch.
  • Cosmic / Source / TUNL Run 2
  • ALTRO Production System 128 ch.
  • Cosmic / Source / TUNL Run 3
  • Final ALTRO System 3200 ch.

13
BoNuS Signal Readout System
14
ALICE and BoNuS Readout System
Ribbons To RTPC
ALICE FEC
ALICE RCU
BoNuS Carrier Card
15
pRTPC w/ Inverter/Driver Cards
Ribbons To Readout System
16
Detector System Tests
  • Readout
  • 128 channel tests
  • Analog Electronics
  • Prototype test results.
  • Software
  • Straight tracks
  • dE/dx

17
Proton Tracks at TUNL
18
dE/dx Analysis from TUNL
19
dE/dx Analysis from TUNL
20
dE/dx Analysis from TUNL
21
Detector Status (1/2)
  • Detector Module
  • Parts Fabrication complete by 4/1
  • Assembly Complete by 5/1
  • Electronics
  • ALTRO working. Needs faster microcode
  • 40K fabrication order going out next week
  • Uncertain how much available for June test
  • 6 (256 ch) available on prototypes NOW

22
Detector Status (2/2)
  • Target, Support Alignment System
  • Design nearing completion
  • Fabrication needed by 5/1
  • Infrastructure
  • Gas Lines Cables pulled in Hall-B
  • Power available
  • Need slow controls, DAQ Interface
  • Detector / Target Gas Panels by 5/1

23
Bonus Detector Outlook
  • Detector Parts Delivery 4/1
  • Detector Assembly 4/1-5/1
  • Electronics Fabrication 3/15-5/1-??
  • Assemble Detector, Target, Support, Readout
    5/1-5/15
  • Checkout 5/15 5/30
  • Hall-B Install Test 5/31 6/8
  • Physics Run October 20 December 22

24
Software Needs Work, too!
  • DAQ Interface w/CLAS data structure
  • Event visualization OK and improving
  • Track Fitting - Straight Tracks OK and improving
  • Need to incorporate
  • Vdrift(R) (ongoing)
  • B-Field
  • Lorentz angle
  • Need Simulation and Simulated Data

RHIT vs. Time Bin (Vdrift varies with R)
Curved e- Drift N.B. nonuniform B
25
BoNuS Detector
  • Much done.
  • .
  • .
  • .
  • Plenty to do.
Write a Comment
User Comments (0)
About PowerShow.com