Fast FARS - PowerPoint PPT Presentation

1 / 28
About This Presentation
Title:

Fast FARS

Description:

30-day Rule; Not result of Natural Disaster. National Uniform Data Descriptions ... Fast FARS to become FARS Case Management System, replacing local logs, case ... – PowerPoint PPT presentation

Number of Views:105
Avg rating:3.0/5.0
Slides: 29
Provided by: mathan6
Category:
Tags: fars | fast

less

Transcript and Presenter's Notes

Title: Fast FARS


1
Fast FARS
  • Presentation at National Traffic Records Forum
  • August 2005

Cathy Downs, FARS Team Leader
2
Fatality Analysis Reporting System (FARS)
  • The source of information on fatal traffic
    crashes in the U.S.
  • Fatality w/in 30 Days of Crash
  • 43,000 fatalities/year
  • 150 per fatality
  • Covers All 50 States, DC, Puerto Rico and the
    Virgin Islands

3
Fast FARS
  • Reporting of basic information about fatal
    crashes in real-time to Agency managers.
  • Quantifying all fatal crashes within two weeks
    after the reporting period
  • Quantifying all fatal crashes for holiday periods
    within 24 hours after the holiday end

4
  • Describe FARS
  • FARS is an End-to-End System
  • Data Collection-to-Analysis
  • FARS Data
  • Describes Environment, Vehicles, Involved
    Persons
  • Use ANSI D-16 Definitions. Example
  • 30-day Rule Not result of Natural Disaster
  • National Uniform Data Descriptions

5
Uses of FARS Data
  • BAC from 0.10 to 0.08
  • Motorcycle helmet usage legislation
  • Repeat offenders
  • Restraint usage laws
  • The 65 MPH speed limit
  • Safety design of cars and light trucks
  • Safety of large trucks on the highway
  • Airbag effectiveness research

6
  • 1. When was FARS Created? How often updated
  • 1975 (Predecessor Fatal Accident File, 1972)
  • File Publications
  • File published 8-months after calendar year
  • 100 complete (/-)
  • Reports to Congress
  • Annual Publications
  • Etc.
  • Final file published 14-months after calendar
    year
  • Early Projection file prepared 6-weeks after ..
  • 85 Complete
  • Used for early estimations

7
2. Number of Annual Records 42,000
Crashes 60,000 Vehicles 60,000 Drivers 100,000
Persons
8
  • 3. How is Data Collected
  • 4. Where is Data Collected
  • 5. What are the Sources
  • Cooperative Agreements
  • State Personnel Gather/Code/Enter
  • State Records Files
  • Police Crash Reports
  • State Vehicle Registration Files
  • State Driver Licensing Files
  • State Highway Department Data
  • Vital Statistics
  • Death Certificates
  • Coroner/Medical Examiner Reports
  • Hospital Medical Records
  • Emergency Medical Services Reports

9
  • 7. What are the Data Elements (138 elements)
  • Crash Characteristics
  • Describes Crash Environment
  • Roadway, EMS, Demographics, etc.
  • Vehicle Information
  • Characteristics of Vehicles
  • Make/Model/VIN, etc.
  • Driver Level
  • History, Violations, License Status, etc.
  • Person Level
  • Age/Gender/Ethnicity, Person Type, BAC/Drugs

10
FARS is the most referenced motor vehicle crash
data system in the world.
  • Even if youre on the right track, youll get
    run over if you just sit there. Wi
    ll Rogers

11
Fast FARS
12
Why Fast FARS?
  • NHTSA administrator requested a system that would
    provide real-time notification of fatalities.
  • At any time be able to see how many deaths
    occurred yesterday.
  • Identifying where (state, county) the crash
    occurred.
  • How many deaths occurred during a holiday period.
  • Date/time of crash.
  • Jurisdiction

13
Direction of Fast FARS
  • Fast FARS Process
  • Two Phases
  • Data Entry Screen (Case Management System) Manual
    entry process.
  • EDT automatic data entry process.

14
Case Management System
  • As soon as notified, case entered into FastFARS.
  • Allowing FARS cases to be built as information is
    received.
  • A minimum set of data elements.
  • Case could roll-up into MDE once minimum data
    available.
  • Ability to provide local reports on this new
    timely data.
  • Fast FARS to become FARS Case Management System,
    replacing local logs, case tracking systems,
    universally adopted and supported system.
  • Fast FARS built to accept EDT in phase two.

15
How Will Fast FARS Get Started?
  • Implement Entry Screen Interface
  • Pilot to evaluate application system
  • Oct. 2005 4 or 5 States
  • Full implementation 1st year Evaluation of
    process
  • Measure against monthly reporting currently
    available
  • Monitor States early notification process at
    jurisdiction level

16
Early Notification in States
  • Conducted a small survey to
  • Learn how States are notified of a fatality.
  • How soon following a fatal crash.
  • What information are they provided.
  • Does the State have electronic crash reporting.
  • Does the State have their own in-house tracking
    system.

17
(No Transcript)
18
(No Transcript)
19
(No Transcript)
20
(No Transcript)
21
Challenges to Fast FARS
  • 21 State FARS analysts are dependent on other
    state agencies for initial crash data.
  • 16 States do not have early notification.
  • 28 States use teletype or fax for early
    notification.
  • 5 States rely on outside media sources.
  • 5 States rely on US mail to transport crash data.
  • 11 States provide electronic access for early
    notification.

22
Fast FARS EDTElectronic Data Transmission
  • Identify States that currently have electronic
    crash reporting systems.
  • How fast is their collection and transmission
    of crash data and death notification how
    complete is it?
  • Develop an agreement with those States to access
    their system, pulling identified data fields into
    FARS/Fast FARS.

23
Pilot Program
  • Phase 1 Application System Evaluation
  • Start Date
  • October 2005
  • States Involved
  • TBD
  • End Date
  • December 2005
  • Phase 2 Process Evaluation
  • All States
  • CY 2006
  • Monitor Jurisdiction Reporting

24
Evaluate Pilot
  • Make Corrections
  • Bring on More States
  • January 1, 2006 all States involved

25
Status of Fast FARS
  • Near completion on Screen Interface
  • Train FARS Analysts (Oct. 2005)
  • Establish Procedures in States (back up)
  • Gear up team to evaluate/monitor process
  • 4 EDT States

26
FARS and Fast FARSElements FARS
Fast FARS
27
Case Management SystemState Benefit
  • States can customize their own fields
  • Synchronize the data into MDE

28
Fast FARS will continue to develop
  • Ultimate Goal - EDT for all
  • When youre through changing, youre
    through.
  • Bruce Barton
Write a Comment
User Comments (0)
About PowerShow.com