Title: Merowe Dam: Details of Site


1
Merowe Dam Details of Site Engineering Design
  • Suzanne Young
  • February 19, 2004

2
Outline
  • Project aims
  • Details of site
  • Main Nile
  • Climate
  • Topography Geology
  • Engineering Design

3
What are the project aims?
  • Eliminate current deficit in electricity in Sudan
  • Satisfy future demand
  • Contribute to industrial and agricultural
    development ? employment
  • Raise standard of living for citizens

4
The Main Nile
  • Khartoum to Wadi Halfa, 1500 km
  • Large S bend
  • Most significant feature Cataracts
  • 1979 no river, control or storage works
  • Effect of Aswan High Dam

5
(No Transcript)
6
Climate
  • July to August, Northern Sudans rainy season
  • 50 mm, Merowes mean annual rainfall
  • High variability
  • Intensity of storms
  • Hot summers (34 C) and cold winters (20 C)

7
(No Transcript)
8
(No Transcript)
9
Geology
  • Between third fourth cataract, sandstone
    channel
  • 100 km below fourth cataract, broad, silty
    floodplains
  • Between fourth fifth cataract, narrow bed of
    tough igneous and metamorphic rocks

10
Design origin, basis
  • 1979 study led to design proposals
  • Merowe dam
  • Long in relation to height
  • Extended elaborate spillway structures
  • Concrete structure in main river channel,
    rockfill dyke on each bank

11
Cont.
  • Control floods using surface spillways and deep
    sluices
  • Sluices permit drawdown in dry season if
    necessary
  • Sluices used for partial drawdown prior to floods

12
Merowe Dam Overview
  • Located 350 km (220 mi) north of Khartoum
  • Installed capacity 10 units of 125 MW 1250 MW
  • Approx. 10 km long, 65 m high
  • Reservoir, 170 km long, 476 square km surface area

13
Dam structures
  • Dam of 65 m height consist of
  • Concrete faced rockfill dam (right bank), 4,800
    m long
  • Rock and earthfill dam (left bank), 4,000 m long
  • Concrete dam 520 m long, including powerhouse
    for 10 turbines, spillway and sluices

14
Helpful dam terminology
  • Cofferdam
  • Temporary dam built to keep riverbed dry to allow
    construction of permanent dam
  • Drawdown
  • The lowering of a reservoirs surface elevation
    and water volume by releasing (spilling or
    generating) the reservoirs water at a rate
    greater than the rate at which water flows into
    the reservoir
  • Sluice
  • A structure with a gate for stopping or
    regulating flow of water

15
Dam figures
  • Look at and discuss!