14 CFR 135 Seminar - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

14 CFR 135 Seminar

Description:

New this year: Revised A002, A007, A008 for Operational Control issues ... Revised C052 with new info for GPS/WAAS authorizations. New A061 for Electronic ... – PowerPoint PPT presentation

Number of Views:89
Avg rating:3.0/5.0
Slides: 10
Provided by: MTON
Category:
Tags: cfr | seminar

less

Transcript and Presenter's Notes

Title: 14 CFR 135 Seminar


1
14 CFR 135 Seminar
  • Operations Specifications

2
Recent OpsSpecs Changes
  • Last year
  • Ended C063 for RNAV approach authorization
  • New C063 for RNAV SIDs STARs (included
    Q-Routes)
  • New C052 guidance included RNAV approaches
  • New this year
  • Revised A002, A007, A008 for Operational Control
    issues
  • New A055 for HazMat will-carry operations
  • Revised A004 b. added HazMat will-not-carry
    operations
  • Revised C063 removed Q-Routes from SIDs STARs
  • Revised B035 added Q-Routes to RNAV auth.-Class A
    airspace
  • Expect revision to B034 to add T-Routes to RNAV
    auth.-Class I nav
  • Revised C052 with new info for GPS/WAAS
    authorizations
  • New A061 for Electronic Flight Bag authorization
  • Revised A047 for National Park Air Tour Management

3
New OpsSpecs C052Revision 060 Dated 04/04/2007
  • Lost restrictions for RNAV use
  • was in OLD C063
  • OLD C052 had guidance for those RNAV restrictions
  • Was not readily available to all
  • Was not part of the OpsSpecs contract
  • No provisions for WAAS capability
  • No provision for new RNAV (RNP) authorization
  • Now restrictions are in OpsSpecs paragraph
  • WAAS is addressed
  • RNAV (RNP) not authorized here! (See C394 and
    C358)
  • SAAAR (Special Aircrew Aircraft Required) (See
    AC90-101)
  • New provision for using RNAV for selecting
    alternate airports

4
New OpsSpecs C052Revision 060 Dated 04/04/2007
  • b.(3) allows descent to DA(H) using col. 2
  • Requires C073 for VNAV and DA(H) in lieu of
    MDA(H)
  • b.(4) excludes authorization for RNAV (RNP)
  • Requires non-standard OpsSpecs C384 /or C358
  • c. Equipment to be listed in B034
  • c.(1) approved for IFR and current nav data
  • c.(2) RAIM
  • c.(3) crew training checking for GPS (except
    FMS)
  • Using EACH AIRCRAFT TYPE and GPS combination
  • c.(4) initial 6 mos of ops 200/1/2 sm
  • c.(5) may use some GPS/WAAS approaches for
    alternate planning
  • Must use LNAV or GPS minima during planning
  • May use vertical guidance to complete the
    approach, if available

5
New OpsSpecs C052Revision 060 Dated 04/04/2007
6
(No Transcript)
7
(No Transcript)
8
New OpsSpecs C063Revision 030 Dated 12/01/2006
  • OLD paragraph had Type A Type B SIDs and
    STARs
  • NEW paragraph has Type 1 Type 2 SIDs and
    STARs
  • Change is aligns with ICAO standards and
    terminology
  • Type now matches RNP capability
  • Type 1 RNP-1 (Note RNAV 1)
  • Type 2 RNP-2 (Note RNAV 2)
  • Equipment capabilities no different
  • Info found at AC 90-100A website (as before)
  • More avionics qualify
  • Includes KLN-90B with the correct software
    revision
  • Charts have Notes including for RNP equipment
    needed
  • Examples RNAV 1 DME/DME/IRU or GPS required

9
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com