Title: Full-Time Equivalent (FTE)
1Full-Time Equivalent (FTE)
2Full-Time Equivalent (FTE)
FTE Unit of Measure of a workers productivity
or effort
FTE ? Count
Head
3Units of Measure - 4 Types of Hrs
- Productive Hours hours charged to a project
not in FTE calc
- Leave w/o Pay (LWOP) not in FTE calc
4Units of Measure Work Month
Work Month Productive Hours in Acctg Period /
Available Hour in Acctg Period
Available hours for monthly (MON) employees are
different from bi-weekly (BWK) employees because
of their differences in time reporting to LDRS
and General Ledger in any given month.
5FTE Calculation
FTE FTE Factor x Work Month of each
employee FTE Factor (S Productive Hours S
Paid Leave Hours) S Productive Hours
calculated for each paygoup (MON or BWK) at the
Level 1 division employees home organization
6Paid Leave Factor (PLF)
PLF 1 / FTE Factor PLF (S
Productive Hours ) (S Productive Hours S Paid
Leave Hours) FTE Employee Work Month / PLF
7Example
Assume Division A has 4 MON and 3 BWK Employees
For each MON employee Available Hrs 22 Days x
8 Hrs/Day 176 Hrs For each BWK employee
8Example - Monthly (MON)
9Example - Bi-weekly (BWK)
10Adjustments
- Adjustments for late time entry or corrections
to hours reported in prior reporting periods. - If the prior time reporting period occurs in the
same accounting period as the current time
reporting period, then adjustment hours are
included in the FTE calculations. - If the adjustment is not for the current
reporting period, an Adjusting FTE is calculated
and will be included in calculating YTD FTE.
11Key Points
- Standard calculation for LBNL FTE reports.
- FTE Calculation based on FTE Factor of whole L1
Division (home organization). - FTE of an employee can be gt 1.0 or 0.
- FTE calculation excludes LWOP and overtime.
- YTD Ave FTE calculation includes FTE adjustments.
12Sample BRS Report-Page1 Current Period
13Sample BRS Report-Page 4 Adjustments
14Sample BRS Report-Page 5 Total
15Sample Effort Analyzer Report 1
FY06 FTE
16Sample Effort Analyzer Report 2
FY06 YTD Ave FTE
17Sample Effort Analyzer Report 3
For Oct, 2006
18Sample Effort Analyzer Report 3
For Oct, 2006 contd