Title: Estimating Software Projects


1
Estimating Software ProjectsActivity
Scheduling in the Dynamic, Multi-Project Setting
Choosing Heuristics Through Deterministic
Simulation
2
Acknowledgements
  • Estimating Software Project
  • R. Agarwal, Manish Kumar, Yogesh, S. Mallick,
    R.M. Bharadwaj, D. Anantwar
  • Activity Scheduling in the Dynamic, Multi-Project
    Setting Choosing Heuristics Through
    Deterministic Simulation
  • Robert C. Ash, Division of Business and Economics
  • Indiana University Southeast

3
Introduction
  • What?
  • Why?
  • How?

4
Approaches for Defining Software Volume
  • Parametric
  • Heuristic

5
Parametric Approaches
  • COCOMO
  • COCOMOII
  • COCOTS
  • Function Points
  • Newer Approaches Object metrics Graphical User
    Interfaces (GUI) metrics

6
COCOMO (COnstructive COst MOdel)
  • Most fundamental calculation
  • (PM)
  • A proportionality constant
  • B depends on development mode
  • SIZE SLOC, KLOC
  • PM Person-Months

7
COCOMO - MODELS
  • Basic Model
  • Intermediate Model
  • Detailed Model
  • Time to develop (TDEV) (months)

8
Example Project of 3k LOC(Organic Mode)
  • Basic Model
  • Effort 2.4 31.05 7.6 PM
  • TDEV 2.5 7.6.38 5.4 Months
  • Avg. staffing 7.6/5.4 1.4 person(s)
  • Intermediate Model
  • EAF 1.30 1.10 1.43
  • Effort EAF 3.2 (3k)1.05 14.5 PM
  • TDEV 2.5 14.5.38 6.9 Months
  • Avg. staffing 14.5/6.9 2.1 person(s)

9
COCOMO II
  • Advanced version of COCOMO.
  • Two Models developed to be used for two stages of
    software development
  • Early Design Model
  • Post-Architecture Model

10
Stages/Equations
  • Basic Equation

11
COCOTS(COnstructive COTS)
  • COTS Component assessment
  • Tailoring
  • Development and Testing of glue code
  • Increase level programming due to volatility

12
Function Point Analysis
  • Developed to overcome difficulties associated
    with LOC as a measure for predicting effort.
  • Measures from functional perspective independent
    of technology.
  • Track and monitor scope creep.
  • FP Counts can be compared at end of phases.

13
Major Components
  • External Inputs (EI)
  • External Outputs (EO)
  • External Inquiry (EQ)
  • Internal Logical Files (ILFs)
  • External Logical File (EIFs)

14
Function Point Count
  • FP UAF x VAF

15
Benefits of Function Point Analysis
  • Used to size software applications more
    accurately.
  • Different people can use them to obtain the same
    measure.
  • Easily understood by the non-technical user.

16
Heuristic Approaches
  • Bottom Up
  • Top Down
  • Expert Judgment Wideband Delphi
  • Estimation by Analogy
  • Deterministic Simulation

17
Deterministic Simulation
  • Overcome shortcomings found in other project
    scheduling tools.
  • Assume unlimited personnel and resources.
  • Applied to one project at a time.
  • Effective tool for choosing the heuristics that
    best fits the projects and activities.

18
Pre-conditions for Deterministic Simulation
  • Database for critical project resource pools.
  • Activity information for known projects loaded in
    project software program.
  • Algorithm loaded in project software program.

19
Example
20
Conclusion
  • Which cost estimation model?
  • How to measure software size in LOC or FPs?
  • What constitutes a good estimate?