LAL Site Report - PowerPoint PPT Presentation

About This Presentation
Title:

LAL Site Report

Description:

LAL Site Report - HEPix - BNL 2004. Main Resources Changes. More Linux CPUs ... Now supports the concept of Site. Work done in common between CERN and LAL ... – PowerPoint PPT presentation

Number of Views:53
Avg rating:3.0/5.0
Slides: 10
Provided by: rhic1
Learn more at: https://www.racf.bnl.gov
Category:
Tags: lal | report | site

less

Transcript and Presenter's Notes

Title: LAL Site Report


1
LAL Site Report
  • Michel Jouvin
  • LAL / IN2P3
  • jouvin_at_lal.in2p3.fr

2
Main Resources

DS20
LSF Cluster
  • NFS
  • SMB
  • Appletalk
  • www
  • Mail
  • Print

DS20e
Gb Ethernet
100 Mb
10 Mb
3
Main Resources Changes
  • More Linux CPUs
  • 25 dual Opteron 2,2 installed (IBM e325, 1U)
  • Linux upgrade to Scientific Linux
  • Currently installed on all new machines (i386 or
    amd64)
  • Proposed on desktop, preconfigured with Kickstart
  • Network new switch with 10 Gbs uplink
  • XtremNetworks Summit 400 (48 Gb ports)
  • Used by Opteron farm
  • Plan to replace central switch (Cabletron SSR
    8000) next year

4
Mail Service
  • Authenticated SMTP in production
  • Required to relay through LAL mailer (roaming
    users, home access)
  • Based on Sendmail SASL
  • Password management integrated in npasswd used
    for NIS passwords
  • LAL extensions to npasswd
  • Spam Bayesian filtering useful
  • Filtering efficiency 95
  • Slow learning curve for this filter (3 months)
  • Need to feed filter db with undetected SPAM once
    a month at least
  • New patterns appear on a regular basis
  • Undetected SPAM collection need to be automated ?
  • Plan to move to Cyrus v2
  • SIEVE for filtering at message delivery (server
    based)

5
Windows Infrastructure
  • IN2P3 forest in production
  • 11 labs in production
  • All IN2P3 labs should participate
  • No problem so far
  • Move of LAL AD domain to IN2P3 forest delayed
  • Planned this summer but time is missing
  • Challenge transparent to users, preserving GPOs
  • By the end of the year ?
  • Pressure growing as this is requirement to use
    national repository for mechanical CAD/CAM (CATIA
    SmarTeam PDF)

6
Windows Infrastructure
  • SMS key management component for LAL
  • Complements AD based tools
  • Deployment of security patches, SPs and system
    upgrades
  • SUS feature pack (presented at Edinburgh meeting)
  • Based on SMS inventory and logging capabilities
    (push model)
  • Plan to upgrade to SMS 2003
  • Better integration of SUS features
  • Integration with ActiveDirectory
  • Virus attack caused by a problem in CISCO ACLs
  • Few machines affected (unpatched machines,
    proactive patching critical)
  • Checking is time consuming

7
Printing Multi-Site Printer Wizard
  • Based on CERN Printer Wizard (Windows only)
  • Management of LPR based printers by an
    unprivileged user
  • Printers described in a central database
  • Support any LPD/LPRng server
  • Now supports the concept of Site
  • Work done in common between CERN and LAL
  • Allow to use the same client on several sites
  • Each site has its own database of printers
  • In production at LAL since last summer
  • Very appreciated by our users involved in CERN
    experiments
  • Could be used/supported by other sites to help
    traveling users

8
GRID
  • Strong involvement from LAL in EDG / LCG / EGEE
  • LCG Tier 2 (plan to do in common with DAPNIA)
  • 4 FTE including PTB leader (Cal Loomis)
  • Still 1 additional open position to fill (2 years
    European contract)
  • Fabric currently 40 CPU (1/3 Xeon 3Ghz, 2/3
    Opteron 2.2 Ghz)
  • Recent machines running SL
  • Current focus middleware deployment, Quattor
    integration
  • XtremWeb a P2P computing project
  • Partnership with LRI (Orsay, computing research)
    for 4 years
  • Significant resources 30 CPUs (Xeon 3 Ghz,
    Opteron 2.2 Ghz)
  • LAL interest use of P2P resource as a fabric
    via OGSA

9
Miscellaneous Projects
  • Unattended Linux installation server
  • Currently based on Kickstart for initial
    installation
  • Still planning to investigate EDG WP4 Quattor
  • Initial installation and updates
  • Servers and desktops
  • In conjunction with EGEE involvement
  • Serial Console Management with SLAC/CERN tool
  • Presented at Hepix by C. Boeheim and H. Meinhard
  • Conference organization tool
  • InDiCo installation in progress
  • EU project based on CERN Agenda, presented at
    Edinburgh
  • Automatic visitor registration and DHCP quarantine
Write a Comment
User Comments (0)
About PowerShow.com