Title: GIS Data Collection
1____________________________
GIS Data Collection Capacity Data
Acquisition Data Storage, Management and Reporting
University of Toledo Site Mark Vonderembse Peter
Lindquist Jiwan Gupta
2____________________________
Toledo Site Tasks / Deliverables l Develop GIS
Database for Freight Transportation Facilities
and Infrastructure --Highways --Railroads --C
ommercial Airports --Ports and Waterways --Interm
odal Terminals and Connectors
3____________________________
Toledo Site Tasks / Deliverables l Develop GIS
Database for Freight Transportation Facilities
and Infrastructure --Highways --Railroads --C
ommercial Airports --Ports and Waterways --Interm
odal Terminals and Connectors l Assist in
coordinating Network Components with Other Sites
on Research Team
4____________________________
Toledo Site Tasks / Deliverables l Develop GIS
Database for Freight Transportation Facilities
and Infrastructure --Highways --Railroads --C
ommercial Airports --Ports and Waterways --Interm
odal Terminals and Connectors l Assist in
coordinating Network Components with Other Sites
on Research Team l Perform Capacity Analysis
on Spatially-Referenced Data
5____________________________
Toledo Site Tasks / Deliverables l Develop GIS
Database for Freight Transportation Facilities
and Infrastructure --Highways --Railroads --C
ommercial Airports --Ports and Waterways --Interm
odal Terminals and Connectors l Assist in
coordinating Network Components with Other Sites
on Research Team l Perform Capacity Analysis
on Spatially-Referenced Data l Serve as Data
Repository for Study Secured FTP Site
6____________________________
Toledo Site Tasks / Deliverables l Develop GIS
Database for Freight Transportation Facilities
and Infrastructure --Highways --Railroads --C
ommercial Airports --Ports and Waterways --Interm
odal Terminals and Connectors l Assist in
coordinating Network Components with Other Sites
on Research Team l Perform Capacity Analysis
on Spatially-Referenced Data l Serve as Data
Repository for Study Secured FTP Site l
Generate Internet-Based Data Reporting Page for
Corridor
7____________________________
Corridor Limits
8____________________________
Source National Highway Planning
Network 1100,000 Scale Additions/Modifications
lSelected Access Ramps lToll plazas lWeigh
stations lIntermodal Connectors
9____________________________
Highway Network Closeup
10____________________________
Source NHS Intermodal Connector Database
11____________________________
Data Acquisition and Management l GIS Data
Repository l Secure FTP Site l Data
Documentation l Develop Data Reporting
Standards and Protocols http//www.midwestfreig
ht.utoledo.edu
12____________________________
GISAG Contribution (cont.) GIS-Based
Data Reporting Web Site lData Browsing
lReport Capacities lReport Flows lReport
Bottlenecks lRegulatory Policies Among
Jurisdictions Link to page at http//www.midwestf
reight.utoledo.edu
13____________________________
Data Assembly and Management for GIS Data
14____________________________
Data Assembly and Management for GIS
Data Capacity Computations
15____________________________
Data Assembly and Management for GIS
Data Capacity Computations Data Repository for
Project
16____________________________
Data Assembly and Management for GIS
Data Capacity Computations Data Repository for
Project Data Documentation Site
17____________________________
Data Assembly and Management for GIS
Data Capacity Computations Data Repository for
Project Data Documentation Site Data Reporting
Site Capacity Administration Demand /
Flows Bottlenecks Maps Graphics Tables
18(No Transcript)