Idaho Solid Waste Facility Record Keeping - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

Idaho Solid Waste Facility Record Keeping

Description:

Site Application. Design Application. Operations Plan ... Site Certification. FAA notification. Floodplain demonstration. Seismic impact zone demonstration ... – PowerPoint PPT presentation

Number of Views:32
Avg rating:3.0/5.0
Slides: 18
Provided by: stacya
Category:

less

Transcript and Presenter's Notes

Title: Idaho Solid Waste Facility Record Keeping


1
Idaho Solid Waste Facility Record Keeping
  • June 20, 2006
  • Idaho Department of Environmental Quality

2
Required Documentation
3
All Facilities
  • Site Application
  • Design Application
  • Operations Plan
  • Closure Plan
  • Post-Closure Plan
  • Certifications
  • Monitoring
  • Inspections
  • Special Wastes
  • Deed Notation
  • Variances

4
Municipal Solid Waste Landfills
  • Site Certification
  • FAA notification
  • Floodplain demonstration
  • Seismic impact zone demonstration
  • Unstable areas demonstration
  • State Notifications
  • Receipt of unauthorized hazardous wastes
  • Explosive gas

5
Municipal Solid Waste Landfills
  • Explosive Gas
  • Monitoring
  • Exceedances
  • Steps taken to protect human heath
  • Remediation plan
  • Liquids Exemption - Leachate Placement

6
Municipal Solid Waste Landfills
  • Groundwater Monitoring
  • Well design, installation, development
    decommissioning
  • Sampling analysis plans
  • Statistical method
  • Data
  • Contaminant exceedances

7
Municipal Solid Waste Landfills
  • Daily Climatic Conditions
  • Waste Receipts Characterization
  • Random Inspections
  • Financial Assurance

8
Financial Assurance
  • Detailed written estimate of cost to hire a third
    party to close the largest part ever open
  • Detailed written estimate of cost to hire a third
    party to conduct post-closure care

9
Municipal Solid Waste Landfills
  • Closure Plan
  • Notice of intent to close
  • Closure certification
  • Deed notation
  • Post-Closure Plan
  • Small Community Exemption

10
Nonmunicipal Solid Waste Landfills
  • Daily Log
  • Unauthorized Waste Plan

11
Special Wastes
  • Asbestos
  • Refrigeration Units
  • Diseased Animals
  • Petroleum Contaminated Soils

12
Asbestos
  • NESHAP (40 CFR 61.154)
  • For all asbestos-containing waste material
    received, the owner or operator of the active
    waste disposal site shall
  • Maintain waste shipment records for at least 2
    years
  • Maintain, until closure, records of the location,
    depth and area, and quantity in cubic yards of
    asbestos-containing waste material within the
    disposal site on a map or diagram of the disposal
    area
  • Notify EPA in writing at least 45 days prior to
    excavating or otherwise disturbing any
    asbestos-containing waste material that has been
    deposited at a waste disposal site and is covered
  • Document the location of any temporary storage
    site and the final disposal site

13
Refrigerant
  • CAA Section 608 (40 CFR 82.156)
  • Certified recovery equipment
  • Verify that the refrigerant has been evacuated
    from the appliance or shipment of appliances
    previously, including a signed statement from the
    person from whom the appliance or shipment of
    appliances is obtained that all refrigerant that
    had not leaked previously has been recovered from
    the appliance. This statement must include the
    name and address of the person who recovered the
    refrigerant and the date the refrigerant was
    recovered or a contract that refrigerant will be
    removed prior to delivery.

14
Recommended Documentation
15
All Facilities
  • Training Records
  • Emergency Plan Contact Information
  • Expanded Plan of Operations

16
All Facilities
  • Journal
  • Fires
  • Equipment failures, inclement weather, staff
    shortage
  • Walk-downs, inspections, monitoring events,
    meetings, training
  • Collection activities
  • Cover application
  • Vector control
  • Litter collection
  • Unauthorized wastes
  • Any deviation from approved plan of operations

17