BNL Site Report - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

BNL Site Report

Description:

Primary US site for data storage/processing. Computing Infrastructure ... Site Configuration (Cont'd) (3) GigE/(1) 100Mb connections/mover. 1 GigE Jumbo (Data Input) ... – PowerPoint PPT presentation

Number of Views:43
Avg rating:3.0/5.0
Slides: 14
Provided by: hpcr
Category:
Tags: bnl | report | site

less

Transcript and Presenter's Notes

Title: BNL Site Report


1
BNL Site Report
  • Shigeki Misawa
  • June 8, 2005

2
Computing Facility Overview
  • RHIC (Relativistic Heavy Ion Collider)
  • Data store for all data
  • Primary center for data processing
  • US Atlas Tier 1 Facility (LHC)
  • Secondary data store for fraction of data
  • Primary US site for data storage/processing

3
Computing Infrastructure
  • 2400 Dual Processor Heavy Linux Farm
  • 1 PB disk in the Linux Farm
  • dcache/rootd/other for data management
  • Centralized disk storage
  • 220TB NFS storage (37 servers)
  • 80TB Panasas storage

4
Role of HPSS
  • Ingest all data experiment data
  • 24x7 operation during accelerator running
  • WAN based transfers (LHC)
  • Source previously ingested data for processing
  • What goes in, comes out at least once (not WORN)
  • Source/sink data generated from subsequent data
    analysis passes.

5
Site Configuration
  • HPSS 4.5.1/AIX 5.1
  • Hardware
  • H70 Core
  • (1) P520/(2) 6H1/(2) H80/(3) H70 Movers
  • 4 STK Silos
  • (37) 9940B/ (4) 9940A/ (4) 9840B
  • 3 FAStT900 Arrays 18TB total capacity

6
Site Configuration (Cont'd)
  • (3) GigE/(1) 100Mb connections/mover
  • 1 GigE Jumbo (Data Input)
  • 1 GigE Non-Jumbo (Data I/O)
  • 1 GigE Jumbo (Intermover)
  • 100Mb HPSS control

7
HPSS Stats
  • 15 Million Files
  • 2.9 PB
  • 1PB since the start of 2005
  • File sized 2GB and smaller

8
Usage
  • Data transfers (mostly pftp)
  • Authentication via existing 2 Kerberos Realms or
    PKI (Grid Certs)
  • Oak Ridge batch / batch replacement
  • Optimized file retrieval
  • Open and closed loop access to COS's
  • Disk SC configured with migration always on

9
Future Growth
  • Stored data growth 3-4 PB/year over next 4 years
  • First significant refresh of HPSS hardware
  • New library
  • New complement of servers
  • Additional tape drives
  • Additional disk drives

10
Hardware Refresh
  • Library Options
  • STK SL8500
  • SpectraLogic T950
  • IBM 3584
  • Mover OS Options
  • Linux
  • AIX

11
Hardware Refresh (cont'd)
  • Tape Technology
  • 3592 (Gen 2)
  • STK Titanium
  • LTO Gen3
  • Disk Technology
  • SAS
  • SATA

12
Hardware Refresh (cont'd)
  • Mover Hardware
  • Small big mover/Large small movers
  • 2x4 way Opteron server
  • 1/2/2x2 way server
  • Disk only/Tape only/Disk and Tape

13
Wish List
  • HPSS 6.2 in early August
  • Access non purge-able cache usage (CLI based)
  • CLI On/Off switch for staging
  • Better small file performance
Write a Comment
User Comments (0)
About PowerShow.com