Title: Western Africa NWP: The model and initial results
1Western Africa NWPThe model and initial
results
2- Model Configuration
- MM5-based Real-Time Four Dimensional Data
Assimilation (RTFDDA) system - Standard model physics are currently used
- 6-hour cycles with 24 - 36 hr forecasts in
each cycle, depending on the grid. - Observations Standard GTS/WMO surface and
upper-air stations, plus MADIS (mostly AMDAR) and
QuikScat sea-surface winds
3- Computing Resources
- NCAR Director GAU Reserve
- 7840 GAUs per month until May 1
- CISL Lightning Linux-cluster
- 18 dedicated dual-cpu nodes 1 model
master, 16 MPP and 1 spare - Local post-processing and web service
- RAL PC clusters
4 Domains Three 2-way nested domains
DX 40.5/13.5/4.5 km Dimensions D1
261x261x36 D2 184x295x36 D3 208x301x36 Sizes
(km2) D110530x10530 D2 3969x2592 D3 1350x931
D1
D2
D3
5Typical Distribution of Currently Available
Observations
QuikScat SFC
ROAB
20061211 06
20061211 12
Currently available obs Sfc mostly at 00, 03
21Z Raob 00 and 12Z. Some at 06
and18Z QuikScat twice a day AMDAR vary
diurnally. More obs should be collected and
assimilated into the system in the future.
AMDAR
20061204 12
6Typical Distribution of Currently Available
Observations
20061211 06
7Land Use and Terrain Features
TERRAIN HEIGHT (KM)
8Precip. Climate (From UK/CRU)
9Verification of RTFDDA Forecasts of Cloud
fields (Domain 1 valid at 00Z Dec. 5, 2006)
NRL DAY/NGT VIS/IR
RTFDDA 6h FCST Cloud Top T
10Verification of RTFDDA Forecasts of Cloud
fields (Domain 1 valid at 18Z Dec. 6, 2006)
NRL DAY/NGT VIS/IR
RTFDDA 18h FCST Cloud Top T
11Verification of RTFDDA Forecasts of
Precipitation (Domain 1 valid at 21Z Dec. 6,
2006)
NRL GEO-MV derived 3-h rain
RTFDDA 3h FCST 1h rain
12Domain 2 (Animated hourly, 07Z Dec. 4 18Z Dec.
5 2006)
Surface T and Winds
Surface Qv and Winds
13Domain 3 (Animated hourly, 07Z Dec. 4 18Z Dec.
5 2006)
Surface T and Winds
Surface Qv and Winds
14Next steps, and plans
- Ghanian and Nigerian forecasters are providing
subjective feedback on model strengths and
weaknesses. - NCAR will perform objective verification of the
forecasts, and improve the model as needed. - PC cluster will be set up in spring 07 at NCAR
for longer-term operation of the modeling system. - Proposal will be submitted to the Millennium
Challenge Corporation (MCC) for longer-term NWP
capacity building
15continued
- For the MCC proposal, NCAR will partner with ZedX
corporation, that links agricultural models with
meteorological models, and which has a presence
in Ghana. - NCAR will partner with NASA, Columbia University,
and CU to work with a CU PhD student who will
apply WRF for climate-downscaling in West Africa. - NCAR will continue to work with Ben Lamptey
during the second year of his post-doctoral
appointment, to establish liaisons with
stakeholders and to do what is necessary to
maintain collaboration after his return to Ghana.