Internal Design Review - PowerPoint PPT Presentation

1 / 26
About This Presentation
Title:

Internal Design Review

Description:

Needs to print a map with user's travel path ... Individual tours will guide students around campus. ... Main Campus tour routes are created and tested to be accurate. ... – PowerPoint PPT presentation

Number of Views:47
Avg rating:3.0/5.0
Slides: 27
Provided by: Gre97
Category:

less

Transcript and Presenter's Notes

Title: Internal Design Review


1
Interactive Campus Map(ICM)
  • Internal Design Review
  • 2/26/09
  • ARMS 1098B

Office of the Dean of Students
TRW ODOS
1
2
Introduction of the team
ICM
  • Project members
  • Rachel Tenbarge
  • Project leader
  • Zach Cassiday
  • Project member
  • Jason Lee
  • Project member

Insert picture here of team working on the big
campus map.
2
3
Project History
ICM
  • The project partner needed an easily accessible
    computer mapping system to allow for the easy
    travel of students, faculty, and visitors of
    Purdue University who have disabilities.
  • Project was completed in 2005 but kiosk was
    brought back for maintenance

3
4
Current Project Description
ICM
  • What is the ICM?
  • A program that provides printouts of shortest
    accessible routes from building to building.
  • Why is the ICM useful?
  • People with disabilities can acquire direction
    easily.
  • Visitors new to campus can get directions.
  • Students can access it online for directions at
    any time.

4
5
Original ICM vs. New ICM
6
Software Overview
  • Code written in C, Perl, HTML.
  • Program utilizes pixel coordinates from a picture
    of the campus map (designated as nodes) to
    determine the best path from the start location
    to the end.
  • Once the best path is determined it displays a
    campus map and overlays the appropriate path onto
    it.

7
Program Issues
  • File storage
  • Program creates a new data file at every run
  • Current map is outdated
  • The nodes (example below) are all initialized in
    a single database file
  • MSEE-EE
    10 3734.738, 3856.882 9,11,16

8
The Kiosk
8
9
Kiosk Issues
  • Kiosk is an interactive housing unit with a touch
    screen to run ICM wirelessly
  • Wireless currently not working
  • Unit runs an outdated version of the program
  • Needs to print a map with users travel path
  • Hard to line up the printer with the paper slot
    dispenser
  • Paper falls to the floor when it is printed (no
    hold tray)

10
Semester Goals Progress
ICM
  • Include all accessible doors of all major
    buildings on campus (Completed 8.5 days time)
  • Means walking around every building on campus
  • Requires taking a map and plotting each
    accessible door
  • Transfer all existing nodes (Completed 4 days
    time)
  • Old database nodes on a smaller map for reference
  • New database nodes on a bigger map for
    readability and elimination of unneeded nodes

10
11
Semester Goals Progress
ICM
  • Developed integrated team system to work on
    database nodes at the same time
  • Plot shortest accessible paths from destination
    to destination (In progress 9 days timeand
    counting)
  • Create all new nodes on new campus map
  • Plot all neighbor nodes
  • Run algorithm which calculates shortest path

11
12
Semester Goals Progress
ICM
  • For each new node calibrate exact pixel
    location(In progress Estimate 40-65 man hours
    to complete)
  • Currently 600 nodes to calibrate
  • Begin with old node location and manually compare
    new node to old node
  • Takes approximately 4 minutes to place one node
  • Traverse all combinations of possible paths (Not
    started Estimate 130 man hours to complete?)
  • Fix paths that may go through buildings

12
13
Future plans
ICM
  • Release ICM prototype for field testing within
    1-2 weeks
  • Fix kiosk structural issues and find permanent
    housing location for kiosk
  • Hopefully to be completed while field testing is
    being conducted
  • Revisions based on project partner feedback
  • Complete final project by April 2009

14
Thank you for your time valuable input
14
15
Adjustable BookshelfABS
  • Internal Design Review
  • 02/26/09
  • ARMS 1098B

Office of the Dean of Students
TRW ODOS
15
16
Status Summary
ABS
  • Expected usable prototype delivery April 2, 2009
  • Purpose receive feedback from actual use
  • Expected features at that date
  • Full range of vertical motion
  • Safety sensor
  • Prototype wood surfaces
  • Partial User Manual
  • Final cost 320
  • Reduction possible if creating multiple shelves

17
Progress
ABS
  • Track actuator installed
  • System circuitry design and troubleshooting
  • Purchase of electrical components
  • Microswitches
  • Limit switches
  • Relays
  • Power Supply
  • Safety sensors, limit switches in place not wired

18
Attention Areas
ABS
  • Problem Complicated motor circuitry
  • Solution Troubleshooting, new diagrams, purchase
    of a different part
  • Implications None
  • Problem Shelf and track actuator mounting
  • Solution Correct mistakes made
  • Implications None
  • Problem Shelf size
  • Solution Reviewed goals and deemed immediate
    resizing unnecessary
  • Implications Shelf re-sizing will be done after
    circuitry testing no change in expected delivery
    date

19
Technology
ABS
  • Solved
  • Circuitry simplified, modular sensor circuitry
  • Able to be updated
  • Objects able to be added
  • To be solved
  • Removal of top of shelf
  • Problems mounting track actuator
  • Official delivery date will be delayed
  • Mounting of safety switch plate
  • So as to not limit switch capabilities
  • Will not meet project goals
  • Options weather stripping, molding, wire ties
    and hooks

Shelf re-design with removal of shelf top
20
Goals for Next Review
ABS
  • Next status update Brief Memo on March 6
  • Directly before testing with potential users
  • Next review April 2
  • Design review date
  • Directly before prototype delivery date
  • Upcoming goals
  • Safety sensors and warnings (03/05)
  • Shelf stabilizers (03/05)
  • New actuating buttons (03/26)
  • Re-sized shelf with top removed (03/26)
  • User manual outline (04/02)

21
Global Positioning System Device for the Visually
Impaired(GPS-DVI)
  • Internal Design Review
  • 02/26/09
  • ARMS 1098B

Office of the Dean of Students
TRW ODOS
21
22
Status Summary
  • Project kind of behind because of a project
    redesign.
  • Final delivery date is set for Spring 2010.
  • Overall the project should cost about 250 per
    handheld GPS device.
  • eTrex Legend Hcx, MicroSD chip, batteries

23
Progress
  • Project went through a redesign.
  • Specific routes were inefficient so we are
    redesigning.
  • Individual tours will guide students around
    campus.
  • Went out and collected many different waypoints
    and intersections around campus.
  • Created a handful of routes as part of original
    project design.

24
Attention Areas
  • Over 70,000 routes needed to be created by hand
  • Too time consuming and inefficient so redesign
    was needed
  • Should still be on track since we underestimated
    the amount of time for old project
  • Nodes and Intersections
  • There are hundreds of waypoints and intersections
    that need to be added.
  • Should be finished adding Nodes and Intersections
    to our map within a week

25
Technology
  • Able to create routes on our mapping system with
    available waypoints and intersections.
  • Still unable to add map to our mapping system
  • Every waypoint and intersection must be added by
    going to the specific point with the eTrex.
  • GPS dependent
  • GPS is inaccurate at times
  • Inaccurate points are removed and have to be
    plotted again.

26
Goals for Next Review
  • Design Review is on Thursday, April 2nd
  • Goals
  • Main Campus tour routes are created and tested to
    be accurate.
  • Nodes and intersections of residence halls and
    buildings south of State Street are added.
  • New tour routes of Discovery Park and the
    Residence Halls are created and tested.
  • Think of ways to make GPS device accessible for
    students with visual impairments.
Write a Comment
User Comments (0)
About PowerShow.com