Title: Completion of ATLAS DC2


1
Completion of ATLAS DC2
  • ATLAS Software Week
  • 10th December 2004
  • Gilbert Poulard (CERN PH-ATC)
  • on behalf of ATLAS DC Grid and Operations teams

2
Completion of DC2 Tier-0 exercise
  • Exercise
  • Do in 10 days what should be done in 1 day in
    2007
  • Original goal
  • Reconstructs and produce ESD (from BS)
  • Produces AOD and collections
  • For 10 M pile-up events mixed
  • And distributes ESD and AOD
  • Goals and schedule redefined in September
  • 10 M mixed events 1 M pile-up events
  • Starting date 25 November (became 30)

3
Completion of DC2 Tier-0 exercise
  • Since then
  • Pre-tier-0 exercise (November 15)
  • Mixing using release 8.0.8
  • Reconstruction with 9.0.1
  • Thanks to this exercise (and to the involvement
    of data base people)
  • Tier-0 (November 30)
  • Reduced scope to 2.4 M events in 6 runs
  • Using events at CERN on November 28
  • From RDO (instead of BS)
  • Event mixing with release 8.0.8
  • Reconstruction with 9.0.2
  • Some crashes
  • Not ready for production
  • Difficulties with the infrastructure
  • CASTOR and CASTORGrid

4
Completion of DC2
  • Its clear that we cannot finish by Xmas
  • Concentrate on
  • Going as far as possible in the current
    conditions
  • Test and validate as much as possible of the
    production chain
  • Understand reconstruction (memory and CPU
    usage)
  • In parallel preparing for a new exercise as
    soon as possible with
  • Event mixing producing BS
  • Reconstruction from BS
  • AOD production and building of event collections
  • From the same release 9.0.x
  • And do the Tier-0 exercise early (January) 2005
  • The exercise is more important than the date

5
Completion of DC2
  • We have also to
  • Run in parallel the reconstruction from the
    original non-mixed and distributed samples
  • B1 J1-J8 A9 1.8 M events on Grid3
  • A2 A1 A4 A5 2.5 M events on NorduGrid
  • A3 A0 A7 2 M events on LCG
  • A total of 6 M events
  • And start
  • The event generation and the G4 simulation for
    the Rome workshop
  • 15 M events
  • 1.4 M Si2k for 2 months (G4-simulation)
  • 1800 CPUs
  • 30 TB
  • Priorities to be (re)-defined

6
Completion of DC2
  • DC2 Phase III (Analysis)?
  • Encourage(push) physicists to do analysis with
    produced DC2 data
  • Good test for testing analysis (and distributed)
    tools
  • But my understanding is that physicists are more
    interested by initial-layout data
  • Test of (Distributed) Analysis
  • Could be done with new (initial layout
    Rome) data

7
Completion of DC2 proposal
  • Continue DC2 as it is
  • Before Xmas accumulated as much experience as
    possible
  • Go as far as possible with existing
    release-transformations
  • And testing of the infrastructure
  • Early January
  • (re) Run event mixing with the agreed release
    producing BS OUTPUT
  • Run Tier-O exercise
  • ESD AOD event collections production
    (INPUT/OUTPUT CERTIFIED)
  • Including distribution to Tier-1s and Tier-2s
  • At a level of up to 2.4 M events (plus some
    pile-up to gain experience)
  • This exercise is VERY important
  • And Distributed Analysis becomes part of Rome
    Physics workshop exercise