CV Border WaitTime - PowerPoint PPT Presentation

1 / 24
About This Presentation
Title:

CV Border WaitTime

Description:

... are predominantly CTPAT/FAST certified; however, the BWT crossing observations ... Peace Bridge (US Bound): ACE Roll-OUT Daily Diagnostic (Sept 21'06 Oct 5'06) ... – PowerPoint PPT presentation

Number of Views:90
Avg rating:3.0/5.0
Slides: 25
Provided by: shal3
Category:

less

Transcript and Presenter's Notes

Title: CV Border WaitTime


1
  • CV Border Wait-Time
  • Measurement Project
  • Presentation to
  • TBWG Data Workshop
  • Romulus, Michigan
  • (June3, 2008)
  • Coordination and Policy Branch
  • Transport Canada
  • Ontario Region

2
Project Research Development Process
  • Phase 1 Initial Research and Facilitation
  • review/assessment of technology options,
  • secure endorsement support of related
    interests, including OTA partner carriers
  • Conclusions
  • tractor logs are a rich/abundant source of
    empirical data on wait-times delays throughout
    the entire O/D trip, be it at border crossings,
    or shippers/receivers yards,
  • such wait-time data can be accessed, processed
    and compiled in readily useable form.
  • the capability to vary the frequency of the
    polling interval makes truck-mounted GPS units
    the technology option best suited for measuring
    narrowly-defined border crossing intervals
  • Completed May, 2003
  • Phase 2 Formal Proof of Concept
  • demonstrate practical ways and means to exploit
    the inherent, technical functionality of
    GPS-based, E-data recorders (i.e. hindcast
    simulations on archival data logs)
  • assess the costs, and overall cost effectiveness,
    of advancing the project from concept to
    live-time implementation, with a broad-based
    and expanded sample size
  • Completed October, 2004
  • Phase 3 Implementation Operation
  • RDG approval to proceed with implementation
    granted October, 2005
  • project conceived as a two (2) year, or 26-month,
    research demonstration effort. Project TEC,
    240,948.00, including acquisition and deployment
    of 86 GPS probe-units, plus data
    management/service fees, to the end of 07/08
    fiscal year
  • contract formally awarded to Turnpike Global
    Technologies (TGT) Ltd. on January 20, 2006

3
CV BWT Measurement Project Technology Mix
Data Logging
Data Transmission
Data Processing
download logs
transmit logs
INTERNET
broadcast signal
progrmng instructions
  • On-board GPS unit
  • geo-coordinates time stamps
  • detailed digital fingerprint
  • precise interval measure
  • Bluetooth Reader
  • data access point
  • also reads Bluetooth IDs
  • instant transmission
  • at 0 cost
  • TGT Ltd.
  • data mgmt service provider
  • purpose-built algorithms
  • 24/7 BWT data stream
  • Web-based access

4
Site Layout Data Access Points and Interior
Geofences
Peace Bridge Canadian Plaza
Plaza Entry
Inset U.S. Plaza
Duty Free
Overflow
Base Stn. Reader
2ndry
5
BWT Web Display Features
6
CV BWT Web Display www.borderinformation.com userI
D peaceb password peaceb123
7
Partner Carriers One View Web Display
8
Growth Distribution of the Data Set
9
The Distribution . and limits . of the BWT
Crossings Data
  • of Participant Carriers
  • 15 at outset, currently gt 50
  • Crossing observations to date FY 2006/07
    (97,000), FY 2007/08 (124,260)
  • Probe Unit leverage ..30 test units prompted
    installation of gt 1300 units by 3 host carriers
  • Re the Volume Distribution of Crossings
  • the data set will ?, ?, as Service Providers
    client base, or market share, ?s, ?s.
  • the number location of crossings . vary
    independently, as determined by carrier
    operations
  • the composition, or commodity mix, of carriers
    includes, food, auto-parts, automotive, TL LTL
    freight, but varies independently as determined
    by the fleet size and/or service lines of (TGT)
    client carriers.
  • sample carriers are predominantly CTPAT/FAST
    certified however, the BWT crossing observations
    are not fully differentiated by custom
    classification .as yet !!!
  • BWT data as of Total Traffic Volume
  • 60-90 observations per weekday at P.Bridge and
    A.Bridge, gt1 of annual CV traffic volume at each
    respective crossing.
  • daily observations at Q/L and BWB are appreciably
    less, 15-20/peak weekday
  • the BlueTooth externality 320-340
    observations/day at DWT, equals 2 of total
    (07) traffic volume (i.e., cars/trucks/bus)

10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
PAX Vehicle BWT Measurement Exploiting
Bluetooth Functionality
Data Logging
Data Transmission
Data Processing
.. here I am
sends outbound message
INTERNET CONNECTION
DIGITAL HANDSHAKE
. whos out there
programming instructions
  • Bluetooth enabled device
  • handheld, or embedded
  • emits unique Bluetooth ID
  • variable range (300/30/3)
  • depending on device
  • Bluetooth Transceiver
  • data access point
  • operates in discovery mode
  • sends outbound messages only
  • microprocessor assigns
  • coordinates timestamps
  • TGT Ltd.
  • data mgmt service provider
  • purpose-built algorithms
  • 24/7 BWT data stream
  • Web-based access

14
Special Events, Diagnostics
15
Peace Bridge (US Bound) ACE Roll-OUT Daily
Diagnostic (Sept 2106 Oct 506)
16
Peace Bridge (US Bound) CV Wait Time Data 3rd
Quarter 07
17
Bluewater Bridge (US Bound) Mean Crossing Time
Q1 08/09 v. FY 07/08
18
AMBASSADOR BRIDGE Peak Crossing Time v. Peak
Traffic Volume
AMBASSADOR BRIDGE Peak Crossing Time v. Peak
Traffic Volume
19
PEACE BRIDGE Peak Crossing Time v. Peak Traffic
Volume
PEACE BRIDGE Peak Crossing Time v. Peak Traffic
Volume
20
Perimeter Zones, Queuing
21
Ambassador Bridge (US Bound) Access Queuing
Patterns
  • Zone 2 Zone 1
  • Hwy 401 to A. Bridge Plaza
  • Queue length . _at_ 16 km
  • 43.3 of recorded observations
  • Mean Transit Time
  • Zone 1 only
  • ECR Parkway to A. Bridge Plaza
  • (access to Huron Church via ECR)
  • Queue length . _at_ 6km
  • 32.9 of recorded observations
  • Mean Transit Time
  • NO Zone
  • access to Plaza via Wyandotte Street
  • Queue length 0 km
  • 23.8 of recorded observations

22
(No Transcript)
23
Conclusions
24
Apart from the data, remember three (3)
fundamental, STRATEGIC, aspects of this seminal
RD effort
  • This is not a SOLUTION, simply an analytical
    TOOL
  • a PERFORMANCE METRIC, with operational utility
    for local port crossing officials, a variety of
    government agencies, and
  • those (partner) carriers, who can now routinely
    track precisely measure their own day-day
    border crossing activity
  • This is industry-driven, industry-focused data,
    never previously available, clearly
    demonstrating
  • the trucking industrys willingness to partner
    with government to explore new, innovative
    approaches to problems that affect their mutual
    interest,
  • that industry itself is taking a direct hand, and
    now able to provide empirical data in response to
    the concerns or perceptions of shippers,
    foreign investors, etc. regarding the Can/US
    border.
  • This project, as a RD initiative, has opened
    the door to further exploitation of an
    increasingly abundant, and previously untapped,
    digital data resource
  • established the technical and economic viability
    of FARMING digital tractor logs,
  • confirms Bluetooth functionality as a proxy for
    PAX TRAFFIC wait-times at Can/US border
    crossings,
  • the BWT application is simply a special case of
    the emerging interest in digital tractor logs as
    a planning/analysis tool for trade corridors
    (MTO, TC/HQ) and urban corridor (MTO, UofT).
  • Already we are seeing the emergence of a data
    resale, or procurement, market for 3rd-party,
    derivative applications.
Write a Comment
User Comments (0)
About PowerShow.com