Transportation 2040 - PowerPoint PPT Presentation

1 / 56
About This Presentation
Title:

Transportation 2040

Description:

... Expand the health criterion beyond 'active living' to also address environmental ... in meeting the objectives of 'Target Zero'*and encouraging healthy lifestyles. ... – PowerPoint PPT presentation

Number of Views:79
Avg rating:3.0/5.0
Slides: 57
Provided by: Mich92
Category:

less

Transcript and Presenter's Notes

Title: Transportation 2040


1
DRAFT
Agenda item VII.B.
Transportation 2040
Update to the Regional Transportation Plan
Transportation 2040 Alternatives Development
Regional Staff Committee September 18, 2008
1
2
Transportation 2040August/September Meetings
September 9/3 Alternatives Technical
Group 9/11 Transportation Policy Board
Transportation 2040 Working Group 9/15
Alternatives Technical Group 9/16 Regional
Commute Trip Reduction Working
Group 9/18 Regional Staff Committee
Transportation Demand Management
Steering Committee 9/19 Transportation
Operators Committee 9/23 Regional Safety
Forum 9/24 Pricing Task Force 9/26
King County Staff Presentation
August 8/7 Regional Traffic Operations
Committee 8/13 Freight Action Strategy
(FAST) 8/14 Transportation 2040 Working
Group Statewide Advisory Group for
Environmental Standards
(SAGES) 8/18 Alternatives Technical
Group 8/19 South County Area Transportation
Board 8/20 FHWA
Briefing 8/21 Regional Staff Committee 8/27
Bicycle/Pedestrian Advisory Committee 8/27
Pricing Task Force 8/28 Transit
Concepts Group
3
Short Term Schedule
  • RSC September 18 Alternatives development
    discussion
  • PTF September 24 Finalize pricing concepts and
    integrate into draft alternatives
  • WG October 9 Alternatives drafted begin
    discussing Preliminary Preferred Alternative
    (PPA)
  • PTF October 22 Discuss draft alternatives and
    PPA
  • RSC October 23 Discuss draft alternatives and
    PPA
  • RSC November 6 Draft alternatives and PPA
    discussion (input to November 13 TPB Working
    Group)
  • WGPTF November 19 Draft alternatives PPA
    discussion
  • WG December 11 Alternatives recommendation to
    TPB
  • TPB January 8 Alternatives recommendation to
    the EB
  • WG Transportation 2040 Working Group

3
3
4
Short Term ScheduleAlternatives Technical Group
(ATG)
  • Sept. 30th Baseline revisions finalized
  • Oct. 1st Commence baseline re-runs
  • Oct. 3rd Distribute 1st draft alternatives
    details
  • Oct. 10th Comments on details back to PSRC
  • Oct. 31st Alternatives Details
  • Distribute final draft alternatives details
  • Nov. 10th Post-election adjustments complete
  • Commence Alternatives Modeling/Analysis

4
4
5
Regional Staff Committee Issues and Responses
Issue Alternatives descriptions should be
consistent, and need to include the underlying
philosophy behind each alternative. Response To
eliminate inconsistencies and simplify the
discussion, staff chose to name the alternatives
by number 1 through 5, and staff is writing a
clear philosophy for each. Issue Committee
members expressed concern about how the plan
would address preservation of the existing
infrastructure. Response Staff agreed, saying
the plan should be more explicit in its treatment
of system preservation. The current alternatives
description (which will be presented today)
should make this more apparent. Issue Non-tolling
financing options should be included in the
plan. Response Staff is working on a complete
list of funding options, and will share this
information with the committee. Issue RSC raised
the issue of how the alternatives analysis will
address energy consumption, either as part of the
formal criteria or elsewhere. Response Staff has
developed a possible approach to this issue,
which would assess the alternatives on three
factors (1) fuel consumption (for vehicle travel
only) (2) construction activity and (3) land
use development (see next slide).
6
Transportation 2040 and Energy
  • Possible Approach
  • Energy Fuel Consumption
  • Use models to quantitatively estimate fuel
    consumption for each alternative based on
    vehicle travel only
  • To some extent, the analysis of emissions could
    be considered a surrogate
  • Energy Construction Activity
  • Qualitatively evaluate each alternative based on
    the amount of transportation system expansion
    proposed
  • Energy Land Use Development
  • Qualitatively evaluate each alternative based on
    the type and amount of land use development
    would rely on the interaction between UrbanSim
    and the travel demand model
  • Staff will bring more information on this
    topic at future meetings.

7
Other Issues and Responses (1)
Issue The EDD board and the Special Needs
Transportation Committee have separately
expressed thoughts about how the alternatives
will address economic prosperity and special
needs issues. Both groups asked staff to more
specifically address these issues in the
alternatives evaluation criteria. Response PSRC
staff is working with EDD staff and the special
needs committee to revise the criteria to include
additional economic prosperity and special needs
measures. Staff added a separate economic
prosperity criterion, with several measures to
evaluate how well the alternatives provide access
to the industry clusters (all 15 clusters will be
included), high-wage and living wage jobs, and
freight generators. To address special needs,
the Equity criterion is being expanded to address
transportation needs of youth, the elderly,
low-income, and people with disabilities. Issue G
roups have expressed interest in how energy
consumption (sustainability) will be addressed in
the criteria. Response The staff is discussing
how best to address this issue and will report
back to the Regional Staff Committee.
8
Other Issues and Responses (2)
Issue Groups have expressed a need for a more
consistent way to name and describe the
alternatives. For example, alternative 5
(reduced emissions) seems to be described
differently than the other 4. Response We are
proposing to list them as Alternatives 1-5 and
not name them. Issue Concerns have been
expressed over whether system preservation is
adequately funded in the baseline
alternative. Response Staff is working on a more
comprehensive and clear way to describe and
present system preservation under both the
baseline and action alternatives. King County
DOT is working to collect more comprehensive
preservation needs information for use in the
Transportation 2040 planning process. .
9
Other Issues and Responses (3)
Issue How will the plan account for the
implications of long term increases in the price
of fuel (e.g., mode shift, forecasting VMT)?
Response PSRC staff is designing three modeling
approaches (high, medium, and low) to evaluate
the potential implications of varying fuel
prices. Issue Staff should be prepared to
respond quickly to the results of the election
(ST and I-985). These could substantially change
the baseline alternative. Response Staff is
developing an analytical framework designed to
quickly respond to the results of the November
2008 election. Issue Working Group members have
expressed interest in knowing how the plan will
address new technology. Response Staff is
planning to hold an Innovation workshop at
which new technology and innovation will be
discussed. Ideas emerging at the workshop may
then be applied to the plan alternatives or may
be implemented within the draft and final plan.
10
Other Issues and Responses (4)
Issue The importance of Tribal consultation in
the process has been raised. Response Staff is
adding a Tribal Consultation section to the
Transportation 2040 Public Participation Plan.
This will take the form of an expanded
Environmental Justice (EJ) component, and will
more specifically lay out the Tribal Consultation
process as part of our overall response to
SAFETEA-LU Section 6001 consultation
requirements. In addition, staff has begun its
formal consultation efforts with WSDOT, FHWA, and
FTA related to the Tribal aspects of EJ. Initial
contacts have been made with the WSDOT Tribal
Transportation Planning Office (TTPO), and staff
is already planning tribal consultation meetings
to discuss how tribal issues and concerns can be
aired and addressed in the planning
process. Issue Expand the health criterion
beyond active living to also address
environmental health concerns (e.g., air
pollution, water pollution and related diseases
of asthma and cancer). Response Staff is working
with the Bicycle-Pedestrian and Special Needs
groups to identify ways to measure the health
benefits and impacts of the alternatives. This
may result in either quantitative or qualitative
enhancements to the alternatives evaluation
criteria.
11

Criteria
11
11
12
Evaluation Criteria
  • Mobility (M)
  • Travel Time Savings
  • Reliability Benefits
  • Vehicle Operating Cost Savings
  • Other User Costs
  • Finance (F)
  • Facility Operating Costs
  • Capital Costs
  • Operating Revenues
  • Influence of Finance on the Economy
  • Growth Management (GM)
  • Population in Regional Geographies
  • Employment in Regional Geographies
  • Jobs and Housing Balance in Counties
  • Population and Jobs in Regional Growth Centers
    and Jobs in MICs
  • Economic Prosperity (EP)
  • Accessibility to High-Wage and Living Wage
    Employment
  • Accessibility to Cluster Employment (15 clusters)
  • Accessibility to Freight Generators
  • Environmental Stewardship (ES)
  • Vehicle Emission Cost Savings
  • Runoff From Impervious Surfaces
  • Ability to Retain Open Space
  • Quality of Life (QL)
  • Accident Cost Savings
  • Non-Motorized Travel
  • Redundancy
  • Equity (E)
  • Geographic Equity
  • Income Equity
  • Distribution of Benefits to Passenger and Freight
    Users
  • Special Needs and EJ Populations

Proposed changes shown in red and underlined
12
13
Todays Discussion
  • Provide initial guidance on the non-tolling
    components to be further analyzed in plan
    alternatives (not a recommendation on a preferred
    strategy).
  • Reminder of what will be included in the plan
  • The plan will contain a set of guidance
    statements that
  • Support Demand and System Management
  • Support Strategic Expansion
  • Support Funding of Projects and Programs
  • The Plan will not
  • Provide specific direction on when a facility is
    to be built or program implemented.

13
13
14

Alternatives Concepts Development
14
14
15
Intent of Alternatives
  • Develop alternatives that include different
    strategies to meet the regions transportation
    needs (issues from scoping)
  • Land Use - Better integrate transportation and
    land use decisions through implementation of
    Vision 2040.
  • Economy - Support the Regional Economic Strategy.
  • Congestion and Mobility Reduce congestion on
    facilities for all types of freight and person
    travel.
  • Equity and Special Needs Transportation
    Equitably make transportation investments across
    the region and improve access to jobs and
    services for people with special needs.
  • Safety Health - Improve the safety of the
    transportation system and assist the state in
    meeting the objectives of Target Zeroand
    encouraging healthy lifestyles.
  • Security Support the regions ability to deal
    with emergencies.
  • Energy and the Environment Reduce the causes of
    climate change and water quality impacts on Puget
    Sound
  • Preservation of the System Make improvements to
    an aging infrastructure.
  • Transportation Funding Support the development
    of sustainable transportation funding.
  • Project Prioritization - Make the most of scarce
    transportation dollars.

16
Organizing Framework
  • Range of alternative concepts that represents
  • Different constituent group interests
  • A SEPA process with a broad range of alternatives
    and environmental impacts
  • A range of financing and investment strategies
  • Toll revenues will be directed toward
    transportation investments that improve travel in
    the corridor that they are collected in.
  • A series of transportation strategies that could
    be implemented over time (phased)
  • An integrated package of investments

16
16
17
Organizing Framework
  • The alternatives will vary components of the
    following investment strategies
  • Improving Efficiency
  • Demand Management Moving people and/or goods or
    ideas in the most efficient manor.
  • System Management Improving the efficiency of
    the facilities that people or goods travel on.
  • Strategic Expansion
  • Roadways Choke points and bottleneck
    improvements, new roadways (SR 509,etc), etc.
  • Transit New vanpools or buses or trains on
    existing routes or new routes and supporting
    facilities such as bus maintenance facilities,
    park and ride lots, etc.
  • Bicycle and Pedestrian New or expanded trails or
    sidewalks
  • What about tolls? Tolls are generally used as a
    means to improve the efficiency of a roadway or
    ferry and/or provide funding for maintaining or
    improving transportation facilities.

Improving Efficiency
Strategic Expansion
18
An Illustration of Alternative Performance(Not
actual data)
Emissions Reduction Benefits
Travel Time Savings
19

A Few Thoughts on the Baseline
19
19
20
Alternatives
expansion transit
expansion transit
expansion transit
expansion transit
expansion roads
expansion transit
expansion Roads
expansion roads
expansion roads
pricing
expansion roads
expansion transit
pricing
pricing
expansion roads
system management
pricing
system management
pricing
pricing
system management
system management
system management
system management
demand strategies
demand strategies
demand strategies
demand strategies
demand strategies
demand strategies
Core Concepts that apply to all alternatives
Safety, Security, Special Needs, etc.
Preservation
1 2 3 4 5
Baseline
21
Preservation A Central ThemeApply to All
Alternatives
  • Preservation investments are proposed to remain a
    high priority investments within the plans
    investment principles/strategy. 
  • Keeping transportation assets in safe and
    operable condition will be one of the regions
    highest priorities. 
  • preserving existing service levels (transit or
    other services) will be highlighted as a regional
    priority.
  • Preservation investments may require additional
    funding from existing or new funding sources
    across the many program areas (e.g. city streets,
    county roads, local and regional transit, ferries
    and highways) contained in the plan. 
  • The plans financial strategy will need to
    describe the expectations about how funds will be
    made available to maintain safe and useful
    operations of existing transportation system
    elements.  These details will vary across the
    program areas, reflecting each programs specific
    set of financing and asset management challenges.

22
Baseline Demand Management
22
23
Baseline Bicycle Pedestrian
23
24
Baseline Roadway Efficiency
25
Baseline Roadway Expansion
25
26
Baseline Transit (High Capacity)
EXPANSION
26
27
Baseline Ferry
EFFICIENCY
EXPANSION
27
28
Baseline Strategies Transit (Bus Service)
EFFICIENCY
EXPANSION
  • Staple service in high-density corridorsall
    day, high frequency, high access, highest
    possible speed given that its core service
  • Community Connections lower density corridors,
    may not be all day, lower frequency, speed, lower
    ridership volumes (e.g., life-line service)
  • Specialized Service market driven, peak-service
    (e.g., PR service, employer partnerships,
    DART/ACCESS) 
  • Community Connections and Specialized Service are
    more policy-driven, staple service is
    ridership-driven (or at least should be)

28
29

Starting with the Core Concepts (apply to all
alternatives)
29
29
30
Alternatives
expansion transit
expansion transit
expansion transit
expansion transit
expansion roads
expansion transit
expansion Roads
expansion roads
expansion roads
pricing
expansion roads
expansion transit
pricing
pricing
expansion roads
system management
pricing
system management
pricing
pricing
system management
system management
system management
system management
demand strategies
demand strategies
demand strategies
demand strategies
demand strategies
demand strategies
Core Concepts that apply to all alternatives
Safety, Security, Special Needs, etc.
Preservation
1 2 3 4 5
Baseline
31
Core StrategiesDemand Management
  • Efficiency
  • Employers provide alternative mode subsidies
  • Education Coordinated, employer-based
    alternative mode marketing, promotion, education,
    and incentive program
  • Carshare (ZipCar/ FlexCar) Market-driven
  • Ridematch.com upgrade to calendaring system and
    tool for reward/incentive distribution
  • Vanpool Programs Same as baseline
  • Guaranteed Ride Home service current service
    configurations
  • Parking Management
  • Coordinated Parking Management programs in the
    five metropolitan cities (e.g. agree on
    synergistic strategy for pricing on-street
    parking)
  • Off-street parking policies that promote
    vanpool/HOV use

GTEC A State program that identifies
appropriate areas to promote opportunities to
commute to work using transit, carpools and
vanpools
31
32
Core StrategiesBicycle and Pedestrian
  • Efficiency
  • Education/Encouragement
  • Regional bike map
  • Online walk/bike route planner
  • Regionally coordinated individualized marketing
    program
  • Best practices manual for employers
  • Safety Improve roadway crossing safety for
    bikes/peds
  • Complete Streets Accommodate bike/ped in all
    future roadway and transit projects, where
    appropriate
  • Transit Access Increase bike rack capacity on
    buses region wide
  • Expansion
  • Regionally coordinated bike share program

32
33
Core StrategiesRoadway
  • Efficiency
  • Complete freeway ramp metering integrate with
    connecting arterials region wide
  • Coordinate arterial signals on a corridor and
    regional basis with at least low-tech solutions
  • Integrated Corridor Management (ICM) on I-5 and
    Airport Way
  • FAST Corridor Grade-Separation projects
  • Expansion/Major Preservation
  • Six-lane SR 520 Bridge
  • Alaskan Way Viaduct (details TBD)

Important Freight Strategy
33
34
Core StrategiesTransit (High Capacity)
  • Expansion
  • Baseline will include original Sound Move or ST2
    depending on November vote

34
35
Core StrategiesTransit (Bus Service)
  • Efficiency
  • Adapt to fixed guideway high-capacity transit
    (alternative specific)
  • Operations consolidate stops, rationalize routes
  • Operations reinvest freed service hours in
    staple service or new special purpose service
  • Support Integrated transit farecard and
    automatic vehicle location (AVL) region wide
  • Shared RoW Transit-Focused Mgmt BAT lanes and
    TSP or similar where new service is in the
    pipeline
  • Maintenance/expansion of Level of Service (LOS)
  • community connections (including
    lifeline/special needs) maintain existing LOS
  • staple service (such as Metro 71/72/73) reach
    threshold LOS on critical routes maintain
    existing service on remainder
  • special purpose (such as Metros Brickyard P
    R route) add service where appropriate

35
36
Core StrategiesFerry
  • Efficiency
  • Variable fare pricing on certain routes at peak
    hours
  • Reservation system on some or all routes
  • Add transit connections and park ride capacity
    at ferry terminals
  • Implement operational and pricing strategies
    BEFORE considering costly expansion

36
37
Other System Management
  • Integrated regional traveler information online
    for all types of travel (car, bus, train,
    bicycle, etc.)

37
38
Safety - Core Concepts(apply to all alternatives)
  • Safety
  • Coordinate regional efforts in support of Target
    Zero, the State Strategic Highway Safety Program
  • All Alternatives will include some level of
    safety improvements. Core safety mitigation
    program examples
  • Education on current causes of fatal and
    disabling issues through trend data
  • Emphasis on bicycle and pedestrian safety
    improvements
  • Safety data will be monitored and reported on a
    regular basis.
  • Adjustments to plan will be made in accordance
    with findings.

39
Security - Core Concepts(apply to all
alternatives)
  • Security
  • Participate and raise awareness regarding
    regional security efforts related to emergency
    recovery planning such as
  • Regional Catastrophic Preparedness Grant
    Transportation Recovery Plan
  • Regional ITS implementation Plan (includes input
    from Emergency Management Focus Group)
  • Continue efforts to coordinate evacuation and
    sheltering of special needs populations
  • Security data will be monitored and reported on a
    regular basis.
  • Adjustments to plan will be made in accordance
    with findings.

40
Core Concepts (apply to all alternatives)
  • Special Needs
  • Update and implement the Coordinated
    Transit-Human Services Transportation Plan.

41

Alternatives Development
41
41
42
Alternatives
expansion transit
expansion transit
expansion transit
expansion transit
expansion roads
expansion transit
expansion Roads
expansion roads
expansion roads
pricing
expansion roads
expansion transit
pricing
pricing
expansion roads
system management
pricing
system management
pricing
pricing
system management
system management
system management
system management
demand strategies
demand strategies
demand strategies
demand strategies
demand strategies
demand strategies
Core Concepts that apply to all alternatives
Safety, Security, Special Needs, etc.
Preservation
1 2 3 4 5
Baseline
43
Alternative 1
  • Alternative 1
  • Emphasizes improving the efficiency of the
    existing transportation systems by focusing on
    investments in demand and system management and
    additional transit services.
  • Assumes a limited opportunity for additional
    traditional transportation funding and limited
    reliance upon tolling.
  • Baseline and Core improvements-plus
  • Efficiency Improvements including
  • Working from home program aimed at employers
  • Use technology to improve flows on arterials
    (signal coordination, etc.) and freeways (speed
    harmonization, etc.)
  • Vanpools 20 annual increase
  • Incident Management expanded on freeway and added
    to arterial system
  • Improved traveler information systems to allow
    informed travel choices
  • Improve bike and pedestrian facilities region
    wide
  • Signal prioritization for transit
  • Explore Freight related ITS
  • 1 lane HOT lane network
  • Strategic Expansion Improvements
  • Significant Expansion in Bus Transit Service
    Hours
  • SR-520 Bridge
  • HCT per November vote
  • Park Ride lot expansion emphasizing shared
    ride.

Improving Efficiency
Strategic Expansion
44
Alternative 2
  • Alternative 2
  • Emphasizes strategic expansion in both roadway
    and transit capital programs throughout the
    region, with modest investments in system and
    demand management.
  • Assumes sizable opportunity for additional
    traditional transportation funding and modest
    reliance upon tolling.
  • Baseline and Core improvements-plus
  • Efficiency Improvements including
  • Working from home program aimed at employers
  • Use technology to improve flows on selected
    freeways (speed harmonization, etc.)
  • Signal coordination across jurisdictions-low
    technology
  • Improve bike and pedestrian focused on centers
  • 2 lane HOT network
  • Strategic Expansion Improvements
  • Significant HCT service expansion modest bus
    service expansion
  • Complete
  • I-405,
  • SR-167,
  • SR-509
  • Arterial Improvements
  • HOV System

Improving Efficiency
Strategic Expansion Transit Roadway
45
Alternative 3
  • Alternative 3
  • Emphasizes expanding the core highway system
    through user/toll financing with modest
    investments in system management, bus services
    and arterial improvements.
  • Assumes modest opportunity for additional
    traditional transportation funding for
    non-highway uses and reliance upon toll financing
    of highways.
  • Baseline and Core improvements-plus
  • Efficiency Improvements including
  • Use technology to improve flows on selected
    freeways (speed harmonization, etc.)
  • Vanpools 10 annual increase
  • Signal coordination across jurisdictions-low
    technology
  • Working from home program aimed at employers
  • Improve bike and pedestrian focused on urban area
    and connecting centers
  • Tolling on central Puget Sound system
  • Strategic Expansion Improvements
  • Focused expansion of Transit Bus Service hours
  • Complete RTID like improvements
  • Portion of I-405
  • Portion of SR-167
  • HOV System

Improving Efficiency
Strategic Expansion
46
CORRECTED Alternative 4
  • Alternative 4
  • Emphasizes an integrated mix of investments to
    improve the efficiency of the highway system and
    support transit and arterial improvements in
    existing corridors.
  • Assumes limited opportunity for additional
    traditional transportation funding and reliance
    upon toll financing of highways and non-highway
    uses.
  • Baseline and Core improvements-plus
  • Efficiency Improvements including
  • Use technology to improve flows on selected
    freeways (speed harmonization, etc.)
  • Vanpools 10 annual increase
  • Signal coordination across jurisdictions-low
    technology
  • Working from home program aimed at employers
  • Improve bike and pedestrian focused Metro Core
    cities and connecting centers
  • Tolling on central Puget Sound freeway system
  • Strategic Expansion Improvements
  • Expansion in Transit Bus Service Hours in all
    tolled corridors
  • Complete Bottlenecks and Chokepoints
  • HOV System
  • Significant expansion in bus RoW, light rail, and
    commuter rail
  • Park Ride lot expansion both drive-alone and
    shared ride

Improving Efficiency
Strategic Expansion
47
Alternative 5
  • Alternative 5
  • Emphasizes investments that improve the
    efficiency of the roadway system (freeways and
    arterials), reduce vehicle use, and convert
    transportation fleets to reduce carbon dioxide
    emissions.
  • Assumes a replacement of fuel-based financing
    approaches with charges that relate to vehicle
    use. Revenues are broadly used to support
    mobility and limit vehicle emissions.
  • Baseline and Core improvements-plus
  • Efficiency Improvements including
  • Use technology to improve flows on arterials
    (signal coordination, etc.) and freeways (speed
    harmonization, etc.)
  • Vanpools 20 annual increase
  • Signal coordination across jurisdictions-high
    technology
  • Working from home program aimed at employers
  • Improve bike and pedestrian throughout region
  • Tolling on central Puget Sound system
  • Continuous bicycle and pedestrian network
  • Explore Freight related ITS
  • Strategic Expansion Improvements
  • Major Expansion in Transit Bus and HCT Service
    Hours
  • HOV System
  • Large expansion of bus RoW, light rail, and
    commuter rail
  • Park Ride lot expansion

Improving Efficiency
Strategic Expansion
Bus focused option under discussion
48
Individual Alternatives Strategies Demand Mgmt
48
IN ADDITION TO Core Strategies
GTEC growth and transportation efficiency
centers
49
CORRECTED Individual Alternatives Strategies
Bicycle Pedestrian
  • IN ADDITION TO Core Strategies
  • MIC manufacturing industrial center
  • CTR Commute trip reduction

49
50
Individual Alternatives Strategies Roadway
Efficiency
50
IN ADDITION TO Core Strategies
51
CORRECTED Individual Alternatives Strategies
Roadway Expansion
IN ADDITION TO Core Strategies
Potential Freight Strategy Under
discussion roll back baseline to avoid VMT
increase? Other details still under
discussion
v Included
51
52
Individual Alternatives Strategies Transit
(High Capacity)
EXPANSION
IN ADDITION TO Core Strategies Still Under
Discussion bus service focus instead?
52
53
Individual Alternatives Strategies Transit (Bus
Service)
EFFICIENCY
EXPANSION
53
IN ADDITION TO Core Strategies
54
Individual Alternatives Strategies Ferry
EFFICIENCY
EXPANSION
54
IN ADDITION TO Core Strategies
55
Other Strategies
  • General Efficiency Integrated regional
    multimodal traveler information online
  • Alternative 5 Technological approaches to
    vehicle emissions (passenger, freight, transit)

55
56
Questions?
  • Questions?
Write a Comment
User Comments (0)
About PowerShow.com