Title: An Integrated Approach to Corrosion Damage Management
1An Integrated Approach to Corrosion Damage
Management
- Tobey Cordell
- SK Technologies
- 11 March 2003
2Corrosion Effects on Structural Integrity
- AF Contract Number F09650-00-D-0018
- AF Program Manager
- Dr. Deborah Peeler
- AFRL/ML Liaison to ASC/AA
- AF IPT Members
- Richard Kinzie, AF CPCO
- Maj. Scott Fawaz, USAFA Structures
- Charles Buynak, AFRL NDE
- Thanks to Dr. Bill Abbott, Battelle Dr. Rob
Kelly, RD Assoc. - Laura Simon, SKT and Dr. Jill Ullett, SKT
3AATT Surveys 2001Major Needs Identified by ASIP
Managers
- Establish the Economic Service Life / Cost of
Ownership Models - Determine the onset of Widespread Fatigue Damage
(WFD) - Prevent, Assess and Control Corrosion
- Reduce the Inspection Burden and Improve
Inspection Capability - Standardize Bonded Repair
4AATT SurveysMajor Needs Identified by ASIP
Managers
- Establish the Economic Service Life / Cost of
Ownership Models - Determine the onset of Widespread Fatigue Damage
(WFD) - Prevent, Assess and Control Corrosion
- Reduce the Inspection Burden and Improve
Inspection Capability - Standardize Bonded Repair
Damage Management Toolkit Analysis and
Decision Software Addl Prevention and Repair
Options
5For Lack of a Comprehensive Damage Management
Tool..
- Corrosion is identified but not quantified
- Structural Impact of Current Corrosion Damage is
not a metric that can be used to make disposition
decisions- maintenance or condemnation - Time is wasted and Structural Life REDUCED by
doing some corrosion repairs
6For Lack of a Comprehensive Damage Management
Tool..
- Structural Impact of Corrosion Damage cannot be
Projected to a Future Date / next PDM to allow
cost effective A/C management - Inability to anticipate and manage maintenance
schedule / costs - Some Aircraft prematurely removed from service
due to projected cost and schedule impact of
managing structurally insignificant corrosion
damage
7AEPO Structures Strategy
Enhanced Depot Field Decision Making
Prevention
NDI and Health Monitoring
AFRL ASC/EN ASC/AA
Repair and Replacement
Multiple degradation mechanisms
Integrated Approach AFRL, ASC/EN, and ASC/AA
working together with warfighter customers and
depot maintainers
Aging A/C Analysis
8Integrated ApproachFour Focus Areas
- Prevention PREVENT
- NDI and Health Monitoring DETECT
- Aging Aircraft Analysis ASSESS
- Repair and Replacement MANAGE
9Prevention
- Exposure racks
- ESI basing strategies
- Enhanced CPCs and processes
- Web-based enhanced materials selection
- Maintain safety
- Increase availability
- and mission capability
- Decrease O S cost
NDI and Health Monitoring
INTEGRATED APPROACH
Repair and Replacement
Fatigue Corrosion Material Degradation Wear
Aging A/C Analysis
10New Specimen Racks Basing Environment
- Typical field installation
- Runway environment
- Base personnel install and remove
- 4 Test Cards per Sample Package
- Quarterly sample removals
- 1 Year Kinetic Data
- Ag (Chloride Sensor)
- Cu
- 7075 Al
- 6061 Al
- 1010 Steel
Prevention and Control Office
11Corrosion Exposure In Aircraft
- C-141 Flight Tests
-
- C-130 Flight Tests Coast Guard
- Clearwater, FL (3)
- Elizabeth City, NJ
- Sacramento, CA
- Kodiak, AK
- Hawaii
12Enhanced Materials Selection
- New alloys identified via supplier discussions
- Granta about to demo new web-based selection tool
13Proven Newer Materials already flying
Body skin Alclad 2524-T3
Upper wing surface 7055-T7751 skin 7055-T77511
stringers 7150-T77511 spar chords
Lower wing surface 2324-T39 skin 2224-T3511
stringers
Floors 7150-T77511 seat tracks
Body stiffeners 7150-T77511 keel
beam 7150-T77511 body stringers, upper lower
lobe
BOEING 777
14CESI - Virtual Collaboration
15(No Transcript)
16NDI and Health Monitoring
- Enhanced NDI methods (As Is)
- Corrosion sensors
- Tracking methods
- Data management map by platform
- Maintain safety
- Increase availability
- and mission capability
- Decrease O S cost
Prevention
INTEGRATED APPROACH
Repair and Replacement
Fatigue Corrosion Material Degradation Wear
Aging A/C Analysis
17Enhanced NDI Methods
- Depot level NDI methods being used to evaluate
corrosion exposure specimens - Results to be correlated with inspection records
from depot inspection of legacy fleet
18MAUS IV Scan of LWRU2OB1
19SKT Dayton is continuing to build and use a
structural component inventory
20Multi-Component Inventory
http//missioncontrolonline.com/Wacis/main.cfm See
Reports aircraftpartslist.xls
21Structural Health Monitoring
- Late 2002 start of flying corrosion sensors on
C-141s - Extensive lab and field analysis of various
structural health sensors slated for 2003 - F-15 flight testing underway
22Aging A/C Analysis
- Maintain safety
- Increase availability
- and mission capability
- Decrease O S cost
Prevention
NDI and Health Monitoring
INTEGRATED APPROACH
Repair and Replacement
Fatigue Corrosion Material Degradation Wear
- Corrosion prediction software (To Be)
- Damage state knowledge / morphology
- Structural integrity analysis software (ASIP)
- Cost of corrosion tools
23Corrosion Growth Prediction
Structural Integrity Module
Framework
Environmental Severity Index
Structural State at time (t) area out, pit
depth, morphology, etc.
Corrosion Growth Module
Repair Selected
NDI- Inspection of Condition
Corrosion Growth Rate
Cost Assessment
24Predict To Be Condition
?t
25(No Transcript)
26Corrosion Growth Model Summary
- Lap Joint
- Supporting Database population, validation
testing continue - Additional Materials Characterization data being
leveraged internationally, industrially, and
among services - Wing
- Significant synergism among other 6.5, NDI devt
tasks - Will transition with Data mapping capability,
mining - Supports optimized maintenance decisions
- See DEMO in the SK Technologies booth!
27Repair and Replacement
- Maintain safety
- Increase availability
- and mission capability
- Decrease OS cost
Prevention
NDI and Health Monitoring
INTEGRATED APPROACH
- MATerials SUBstitution
- Composite patches
- RRA
Fatigue Corrosion Material Degradation Wear
Aging A/C Analysis
28Repair Summary
- Materials Substitution
- Key data development for limited promising alloys
- Initial considerations for C-130, C-5
- Defense Logistics Agency involved
- Retrogression and Re-Aging
- Promising process on and off aircraft
- Kinetics Understood, easily managed, monitored
- Process demonstrated on full-scale components
- Additional repair options unfunded
- composite patches, mechanical suppression, etc.
29Corrosion Damage ManagementStatus
- Management of Aging Aircraft is a long term
problem - Current young fleets and new designs will see
extended operation - Environmental (time-dependent) degradation under
cyclic and /or sustained stress - High potential to degrade flight safety
- Significant impact on life cycle costs and
availability
30Corrosion Damage ManagementStatus
- Components which can become critical to both
airworthiness and life cycle cost due to
environmental degradation must be managed in the
same robust manner as structurally significant
fatigue critical components - The ability to anticipate damage for the next PDM
would be a significant step toward managing the
cost of repairs and readiness of our aging fleet