SF LAFCO Energy Consultant(s) RFQ
  • Overview of Critical Issues
  • and
  • Flynn Associates Expertise
  • April 19, 2002

2
Critical Muni Electricity Issues
  • Transmission Access and Congestion Cost
    Mitigation
  • California Independent System Operator and
    Federal Energy Regulatory Commission Market
    Design Proceedings
  • Utility Interconnection Agreement Alternatives
  • Energy Supply Alternatives
  • Energy Price Risk Management

3
Flynn Associates can help SF LAFCO address
critical electricity issues
  • Extensive experience providing strategic advice
    to senior management and policy makers
  • Barry Flynn has been a consultant for over 15
    years (6 years for CCSF). Previous experience
    includes 10 years as director of a municipal
    electric utility, 8 years as transmission
    planner, 3 years as president of a renewable
    resources development firm
  • Doug Boccignone has been a consultant for over 8
    years. Previous experience includes 3 years in
    municipal resources planning, and four years in
    energy origination
  • Experience in developing public power joint
    action agencies

4
Specific Flynn Associates Experience
  • Represent Bay Area Public Power entities on
    critical locational marginal pricing issues
  • Represent CCSF in Bay Area transmission
    alternatives evaluation
  • Permitting under way for new 230 kV line to San
    Francisco by 2005
  • 2800 MW Bay Area transmission upgrade study
  • Represent CCSF as a member of ISO Planning
    Standards Committee
  • Developed Bay Area generation outage standard
    that resulted in additional transmission into Bay
    Area
  • Participated in ISO Stakeholder process and
    assisted CCSF legal counsel to reduce Bay Area
    transmission access costs

5
Specific Flynn Associates Experience
  • Represented CCSF in CPUC December 8, 1998 outage
    investigation
  • Resulted in improved outage restoration
    procedures
  • Special Protection Scheme to limit the amount of
    San Francisco load dropped and speed restoration
    following catastrophic events
  • Advised CCSF regarding Potrero 7 power plant
    interconnection, reliability and other
    transmission and supply issues
  • Represented CCSF in annual PGE grid planning
    efforts
  • Advised CCSF on existing Hetch Hetchy/PGE
    transmission agreement
Write a Comment