LIST OF INVESTMENT PROJECTS

1 / 22
About This Presentation
Title:

LIST OF INVESTMENT PROJECTS

Description:

Project capacity: provision of capital's population with food products with the ... Rearing of silver carp and grass carp in open ponds. Project Cost: US$ 5 mln ... – PowerPoint PPT presentation

Number of Views:48
Avg rating:3.0/5.0
Slides: 23
Provided by: Ahmetz

less

Transcript and Presenter's Notes

Title: LIST OF INVESTMENT PROJECTS


1
LIST OF INVESTMENT PROJECTS IN THE SPHERE OF AIC
TO ATTRACT FOREIGN INVESTORS

ASTANA 2009
2
Wholesale agricultural market (with regional
terminals)
Project objective construction of modern
advanced wholesale market with regional terminals
Location wholesale market in Astana, regional
terminals in the towns of Arys, Aktau,
Ust-Kamenogorsk
Project capacity provision of capitals
population with food products with the output of
fruit and vegetables 90 thousand ton meat
foods, fish- up to 40 thousand tons a year
Project Cost 33 760,911mln. KZT (US226,6 mln.),
the Republican Fund allocates 10 763,54 mln.
KZT, in 2008 - 298 mln..KZT, 2 in 2009 . 1
000 mln. KZT, in 2010 4 538 mln. KZT, in 2011
4 927,54 mln. KZT.
Recoupment term 10 years
.
Launch December 2011
Progress the choice and adjustment of lots for
construction of the wholesale agricultural market
and regional terminals and their procurement have
been made. The Feasibility Study (FS)of the
construction of wholesale agricultural market was
drawn up and confirmed in Astana (hereinafter
WAM). Design Estimates of WAM have been made in
Astana. The elaboration of FS of regional
terminals in Arys, Ust-Kamenogorsk and Aktau is
in the process. The term of completion is late
February 2009. Collection of specifications is
being done to link-up networks.
Initiator JSC NC Prodcorporation
1
3
Grain processing factory in North-Kazakhstan
oblast
Project objective construction of grain
processing factory in North-Kazakhstan oblast
Location village of Novoishimskoe, G.Musrepov
rayon of North-Kazakhstan oblast
Capacity production of gluten 34, 2 thousand
tons, starch-175 thousand tons, feeding
scalpings- 66 thousand tons.
Project cost 25 832,0 mln. KZT (US173,4 mln.),
the Republican fund allocates 2 335,25 mln.KZT,
in 2010 441,5 mln. KZT, in 2011 1 893,75
mln.KZT.
Recoupment term 7,9 years.
Launch IV quarter of 2012
Progress At present search of potential
partner-investors is being made. A number of
meetings with foreign companies like MAN
Ferrostal (Germany), Cargill (the USA) was
conducted. However, the issue of the project
investment is left open.
Initiator JSC NC Prodcorporation
2
4
Bio ethanol production complex of two industrial
objects in the territory of the Republic of
Kazakhstan and Czech Republic
Project objective construction and launch of a
single bio ethanol production complex of two
industrial objects in the territory of the
Republic of Kazakhstan and Czech Republic.
Location Czech Republic, Karlovary oblast,
Vrzhesova, the Repubic of Kazakhstan, Chemolgan
station, Ilyiiskii rayon, Almaty oblast.
Capacity bio ethanol production- 63 148 700
litres a year in Czech Republic, 72 621 005
litres a year in the Republic of
Kazakhstan Production of dry fodder for cattle-
54 thousand tons a year in Czech Republic, in the
Republic of Kazakhstan 54 thousand tons a year
Project Cost 112 600 000 Euros, required
investments bio ethanol factory in Czech
Republic 62 mln. Euros, bio ethanol factory in
Kazakhstan -49 mln. Euros.
Recoupment term 6 years
Launch May 2010 .
Progress business-plan of the project is
elaborated
Initiator LLP Chebio- Hebio, the Republic of
Kazakhstan, CHEBIO, a.s. /JSC Hebio/, Czech
Republic
3
5
Construction of livestock complex jointly with
meat processing and fodder production factory
Project objective creation of vertically
integrated production structure and high-quality
agricultural products processing with closed
cycle in North-Kazakhstan oblast Increase of
export potential of the country due to
agricultural raw products processing.
Location North Kazakhstan oblast, the village of
Tainsha
Capacity Pig-breeding complex for 100 thousand
heads a year Fodder production factory -210
thousand tons a year Meat-packing plant 15
thousand tons of meat a year, 9 thousand tons of
sausages Poultry factory 420 thousand laying
hens a year.
Launch from 2007 to 2013 (gradually)
Project Cost 17 billion KZT (US 143 mln)
Progress - adopted pig-breeding complex of 1
line - held preparatory works on construction of
pig-breeding complex of 2 line - Livestock
complex (1 line) is built and launched.
Initiator LLP Basko
4
6
Rape processing production into rapeseed oil and
raw milk in North-Kazakhstan oblast
Project objective creation of rape processing
production into rapeseed oil and raw milk
Location North-Kazakhstan oblast
Capacity increase of initial seed processing
factory output from 65 thousand tons a year to
180 thousand tons a year Increase of milk
processing factory output from 65 thousand tons a
year to 140 thousand tons a year, establishment
of 5 livestock complexes for 6 thousand heads of
livestock, construction of fodder production
factory with the output of 200 tons in 24 hours.
Project Cost US 120 mln, financing from the
Republican fund is not envisaged
Launch IV quarter of 2011
Recoupment term for rape processing - 7 years,
for milk processing 15 years
Progress by the project Construction of
industrial livestock complexes the location of
the complex is determined, preliminary FS is
elaborated, Design Estimates (DE)are being
prepared. By the project initial seeds
processing factory modernization in the village
of Novoishimsk the site for additional equipment
installation is defined, the work on
infrastructure improvement is done., the outputs
are increased to store rape, the applications
were proceeded to the oblast akimat for training
staff, preliminary FS is prepared.
Initiator LLP Maslo-del
5
7
Development of virgin and fallow lands on the
area of 30 000 hectares
Project objective further development of the
group of companies Bogwi directed at
agricultural production and processing to gain
maximum possible competitive advantages through
agro industrial infrastructure modernization to
intensify trade cooperation in the world markets
Location Akmola and North-Kazakhstan oblasts.
Capacity increase of grain production output up
to 850 thousand tons annually due to enlargement
of arable areas of the group of companies Bogwi
from 2009 to 2011 from 400 thousand hectares to
700 thousand hectares and yields increase.
Project Cost US 50. The funds will be directed
to the following purchase of fuels and
lubricants for mechanical irrigation of lands -
US 16,5 mln, purchase of stock seeds of high
quality wheat varieties - US 14,7 mln ,
purchase of items for chemical protection of
plants US 13,5 mln. Other expenses US
5,3 mln
Recoupment term 6 years
Launch 2008- 2017
Initiator Group of companies Bogwi
6
8
Construction of fair exhibition complex in Astana
  • Project objective increase efficiency of
    agribusiness through wide access of AIC entities
    to fair exhibition activities by
  • - Raising agricultural competitiveness
  • - Enhancement of agricultural goods and services
    and conclusion of agreements by the participants
    of agricultural sector
  • - Expansion of interregional and international
    relations
  • formation of civilized attitude to the market by
    providing the opportunity to study market trends
    for AIC entities and evaluate the position of the
    business in the market
  • provision of equal opportunities for competition
    for all AIC entities participants of fair
    exhibition activities.

Location Astana
Capacity 14 000 sq. metres of display spaces
Project Cost 3 440 mln KZT
Launch Completion of FS, DE (2007-2009) Completi
on of construction (2010-2011)
Progress FS of the project is elaborated and
undergoing state examination The work is o the
development of DE The work is on legalization
of the lot.
Initiator JSC KazAgroMarketing
7
9
Creation of vertically integrated structure on
agricultural production, storage, distribution
and export
Project objective Construction of milk factories
in Ust-Kamenogorsk and Kostanai, enlargement of
actual milk factory in Almaty Creation of
processing plant for baby food production
(reconstruction of the baby food plant Bobek)
Construction of regional and distribution
centers (industrial plants with fridge equipment,
fruit and vegetable storehouses) Creation of the
chain of wholesale markets with their own
production.
Location Almaty oblast (Panfillov,
Enbekshikazak, Uigur rayons), West Kazakhstan
oblast Chain of distribution oblast centres
around Kazakhstan
Capacity orchards - 2 thousand hectares with
enlargement up to 10-12 thousand hectares, 4 milk
farms with 2 thousand heads of animals each.
Project Cost 99,4 billion KZT ( US 818mln.).
Launch 2008- 2017.
Progress project block orchards (the lot is
chosen) developed 25 hectares (planted young
orchard) Project block milk farms equipment
suppliers chosen conducted topography, geology
and geodesy of the lot for farm construction, DE
is prepared. Project block milk factory, former
Ust-Kamenogorsk milk factory was acquired
jointly with the company Tetra Pak Central
Asia, technological project for product output
is worked out leasing contract with the firm
Tetra Laval Credit is signed for supply of
technological equipment.
Initiator Holding of companies Rayimbek Group
8
10
Making of intensive orchards in the area of 2000
hectares in Almaty oblast
Project objective creation of fruit plantations
of high quality to sell fresh products in the
domestic market of the RK and export of Russian
Federation, and for processing adopting the
technology of intensive gardening having
established required production infrastructure.
Location Almaty oblast Uigur and Panfillov
rayons
Planned capacity within 3-5 years to create
2000 hectares of orchards. Density for planting
is 3500 trees per hectare (880 large and stone
fruit trees per hectare).
Project cost US 2,2 mln Required amount US
1, 8 mln
Recoupment term 10 years
Term for project implementation making of
orchards within 5 years, industrial exploitation
for 15 years
Short description of the project project plans
to make intensive orchards in Almaty oblast
applying anti-virus highly productive planting
stock.
Initiator LLP Alma-Prodex
9
11
Construction of commercial sturgeon automated
piscicultural complex with the productivity of
100 tons of commercial fish and 3 tons of caviar
a year and production of young sturgeons
Project objective Construction of closed water
supply installations for commodity production of
caviar and sturgeon-breed fish preserving the
manufacturers and obtaining the young fish from
such endangered species like beluga, sturgeon,
stellate sturgeon, sterlet.
Location Atyrau oblast, village of Ganushkino
Capacity Creation of new production with further
enlargement and increase of output up to 300 tons
of commercial fish and 5 tons of caviar.
Project Cost US 5 mln Required amount US 3,5
mln
Recoupment term 4 years
Term for project implementation 7-12 months
(period of construction and factory launch)
Short description of the project adoption of new
technologies for growing sturgeon fish.
Production of commercial fish, caviar and
reproduction of young sturgeon breed in the Red
Book. Provision of internal and external markets
with delicacy product. Rearing of silver carp and
grass carp in open ponds
Initiator LLP RBFCaspyi
10
12
Flour and fodder production
Project objective Flour and fodder production
Project location Akmola oblast, the town of
Kokshetau .
Capacity Elevators capacity is 50 thousand
tons, Production capacity flour manufacture up
to 300 tons in 24 hours, fodder 100-200 tons in
24 hours.
Project Cost US 18, 1mln Required amount US
18, 1 mln
Recoupment term 6 years
Term for project implementation 11 months
Short description of the project installation
and adoption of grain elevator equipment, flour
and feed mills
Initiator JSC Kazakhstan financial corporation
11
13
Construction of greenhouse complex on the area of
10 hectares applying alternative source of energy
Project objective production of green products

Location Akmola oblast, the town of Kokshetau
Capacity 10hectares
Project Cost US 17 ,0 mln. Required amount US
17,0 mln.
Recoupment term 6 years
Term for project implementation 10 months
Short description of the project installation
and exploitation of bio gas installations and
greenhouse complex to provide the capital with
fresh and cheap agricultural products
Initiator JSC ?azakhstan financial corporation
12
14
Livestock product processing claster from cattle
feeding to ready-made products of Halal standard
Project objective provision of full and
completed cycle of livestock production of
Halal standard (from cattle feeding to meat and
sausages ready made for sale)
Location meat-packing plant -Aktobe, cattle
feeding depot the lot with the area of 2
hectares 50 km far from Aktobe
Capacity meat-packing plant 8 tons in 24
hours, cattle-feeding depot - 2000 heads
Cost 2,7 bln KZT ( US 18,1mln)
Mechanism for attraction direct investment in
terms of 20 transfer out of capital stock,
concessionary crediting up to 10
Recoupment term 5 years
Term for implementation 1 year
Progress the 1st stage of the project is
implemented. Meat packing plant was launched in
June 2008. Its products have the quality
certificate Halal . Financing is necessary for
the 2nd stage organization of he cattle feeding
depot Halal
Initiator LLP ?andem W
13
15
Construction of grain storage and processing and
all-mash production complex
Project objective construction of specialized
complex for storage and processing of grain and
all-mash production
Location the countryside of Astana
Capacity mill - 300 tons in 24 hours, elevator
- 50 thousand tons, production of all-mash 100
tons in 24 hours
Cost 2,7 bln KZT (US 18,1mln)
Recoupment term 7 years
Term for implementation 1 year
Mechanism of attraction direct investment in
terms of transfer of 49 out of capital stock,
concessionary crediting up to 10
Initiator JSC Kazakhstan financial corporation
14
16
Eurasia - growth, processing and marketing of
poultry meat
Project objective creation of vertically
integrated holding for growth, processing and
marketing of poultry meat including feed grain
production, deep processing and manufacture of
poultry meat products, system of storage and
transportation of ready made products
Location Almaty and East Kazakhstan oblasts
Capacity 60 thousand tons of poultry meat a
year
Project Cost US 134,7 mln
Required amount US 119,4 mln
Mechanism of attraction - direct financing as
well as concessionary crediting
Recoupment term 10 years
Launch December 2011
Progress 1. completed the construction of new
processing plant (launch in April 2009) on the
basis of Ust-Kamenogorsk poultry plant 2.
determined the lots to grow feed grain 3. defined
the equipment suppliers
Initiator JSC Ust-Kamenogorsk poultry plant
15
17
Irrigation of Zhaushykumsk massif lands of
Shardary rayon of South Kazakhstan oblast
adopting water-saving technologies (1line)
Project objective development of massifs lands
adopting new technologies of irrigation. The
water is delivered by pumping stations from
Shardary reservoir. In the 2nd line it is planned
to provide with full completed production cycle,
processing and transportation of fruit and
vegetable products
Location Shardary rayon, Zhaushykum rayon
Capacity development of 13.0 thousand hectares
of dry lands, annual croppage of fruit and
vegetable crops will be 523.0 thousand tons for
the amount of 11 bln. KZT, and there will be
jobs for 7200 people.
Preliminary project cost US 122,7mln.
Recoupment term 2 years (from implementation
is 4 years)
Mechanism of investors attraction direct
investment, state guarantees, short term of
recoupment
Term for implementation 2years
Initiator akimat of South-Kazakhstan oblast
16
18
Construction of semi combed yarn production plant
  • Project objective
  • - Facilitate wool production in the Republic of
    Kazakhstan
  • create the base for processing semithin and
    semicoarse wool into ready made products
  • create the conditions for further deep wool
    processing

Location Tekes village, Rayimbek rayon Almaty
oblast
Capacity 1100 tons a year of semicombed yarn
from semithin and semicoarse wool for carpet and
cloth manufacture.
  • Cost US 11 mln.
  • The funds will be directed in the following way
  • purchase of equipment US 9 mln
  • reconstruction of buildings US 1mln
  • circulating assets US 1 mln

Recoupment term 6 years since launch
Progress business-plan is elaborated,
preliminary engineering project is made up (the
chain of equipment is counted and defined,
equipment suppliers are defined)
Initiator Group of companies JSC Stroikontrakt
Corporation, LLP Kuat Ltd
17
19
Investments to grain production
Project objective organization of joint activity
for production and sale of grain and processing
products
Location Akmola, Kostanai and North-Kazakhstan
oblasts
Cost US 1,5 bln of foreign investments.
Potential project parties domestic grain
companies and strategic investors
Cooperation participation of foreign investors
in the capital of domestic grain companies.
  • Party contributions
  • domestic grain companies 2 mln hectares of
    arable areas, technical resources
  • Foreign investors finance.

Initiator Grain Union of Kazakhstan
18
20
Construction of greenhouse complex
Project objective provision with fruit and
vegetable products
Location Karasai region, Almaty oblast
Capacity growth of tomatoes and cucumbers in
greenhouse on the protected ground of 12 hectares
Cost US 25,2 mln
Required amount US 25,2 mln
Mechanism of attraction - direct investment in
the terms of 40-49 transfer out of capital
stock. At present attraction of Japanese
investors is being worked out
Recoupment term 7 years
Term for project implementation 2 years 3
months (March of 2011)
Initiator LLP Almaty Greenhouse Plant
19
21
Construction of vegetable oil production factory
Project objective development of oil-yield crop
production, meeting the demands of vegetable oil
in domestic market
Location 110000, Republic of Kazakhstan,
Kostanai, 36 Karbysheva street
Capacity production of 36-tons of vegetable oil
in 24 hours with further increase up to 100 tons
Cost 2 717 183 000 KZT
Required amount 1 310 226 000 KZT
Mechanism of attraction investment share up to
50 of Project Cost
Recoupment term 7,5 years
Launch March-April 2010
Progress built and launched elevator with
capacity of 20 000 tons of seeds, built and
launched oilseed processing plant with the
capacity of 100 tons of seeds and production of
36 tons of oil and 64 tons of oilcake in 24 hours
Initiator LLP Sodruzhestvo
20
22
Creation of vertically-integrated complex
(cluster)of enterprises on poultry food
production with use of non-polluting closed
technology
Project objective Creation of highly profitable
automated poultry food production.
Location Republic of Kazakhstan, Maiskoe v.,
Taranovsk rayon, Kostanai region
Capacity PPF "Kostanayskiy" - 115 thousand of
parent animals Broiler poultry factory - 5
thousand ton per a year egg factory - 480
thousand heads Grain processing complex mixed
fodder factory - 20 tons per an hour, grain
storage - 100 thousand tons, grinding complex -
150 tons per a day Poultry processing factory
slaughter workshop 3 thousands per an hour,
meat processing workshop deep egg processing
factory with productivity of 1 million eggs per a
shift biogas production complex.
Required amount 11 137 000 000 KZT
Recoupment term 2,7 years
Launch 2009 2010 years
Progress Business plan was worked out
construction documents were prepared the land
for construction of all the complex was
allocated the Contracts with equipment suppliers
were concluded.
Initiator LLP PPF "Kostanayskiy"
21
Write a Comment
User Comments (0)