Title: Maintaining the Streets of Santa Cruz


1
MaintainingtheStreets of Santa Cruz
2
(No Transcript)
3
Street Facts
  • 136 miles of streets maintained
  • 25 miles of arterials
  • 26 miles of collectors
  • 85 miles of residential
  • 29 million square feet of pavement

4
Pavement Condition Index
5
Street in Good Condition
Laurel Steet, PCI 75 Between California Chestnut
6
Street in Satisfactory Condition
California Street, PCI 62 Between Walnut and
Laurel
7
Street in Fair Condition
High Street, PCI 36 Between Moore Laurent
8
Street in Poor Condition
Washington Street, PCI 20 Between Center Laurel
9
Existing Pavement Conditions
10
Typical Repair Costs
11
Cost to Repair a City Block
40 foot wide street, 660 feet long.
12
Pay Now or Pay Later
Costs for AC Pavements Depending on Condition
13
Current Conditions
  • Average PCI 59
  • 42 Million needed (current backlog)to bring all
    streets to middle of good condition, PCI greater
    than 80.

14
Goal
  • To increase average street condition
  • level to Good condition over the
  • next 5 years.
  • (PCI 70)

15
Funding Options
  • BUDGET 2008 PCI
  • 2.5 Million/Yr 70
  • 2.0 Million/Yr 67
  • 750 K/Yr 55

16
5 Year Projections by Budgets
17
Comparison
Current Condition 2004
With 750K/Yr 2008
With 2.0 Million/Yr 2008
With 2.5 Million/Yr 2008
18
(No Transcript)
19
  • Prepared by the City of Santa Cruz Public Works
    Department
  • April 2004