Title: Marin


1
Twinning in Armenia
TWINNING LAUNCHING WORKSHOP
  • Mariné Mizandari
  • Multi-Country Programmes
  • Yerevan, 27th November 2007

2
PRESENTATION OUTLINE
? Armenian Administration and Twinning Facility
New Perspectives
? State of Play First Steps of Twinning
Operations in Armenia
? Key Actors in Twinning and Main Steps of
Twinning Cycle
? Main Features of Twinning Operations in
Armenian context
?Indicative Pipeline of Twinning Projects in
Armenia
3
Armenian Administration and Twinning Facility
  • Current situation
  • Armenia inherited a regime of Public
    administration.
  • Some of these administrations needs to be
    restructured and updated.
  • The Twinning projects will allow Armenian Public
    Institutions
  • To develop and/or strengthen their administrative
    capacity
  • To implement and enforce law
  • To control laws enforcement
  • These reforms will permit Armenia to move closer
    to the EU, to meet EU standards and thus make
    free circulation of persons, goods, services and
    capital possible

4
State of PlayFirst Steps of Twinning Operations
in Armenia
  • Programme Administration Office (PAO) established
    in the end 2006 within the Ministry of Finance
    and Economy.
  • Twinning envelope of 5 million has been made
    available from the National Action Programme 2007
    by the EC. The amount of 500.000 from the NAP
    2006 is foreseen for support to the PAO.
  • Focal Points have been designated within the
    Public Administrations.
  • Several meetings have been held between the EU
    representatives and Armenian Authorities (from
    April 2006 until now).
  • Support is being provided to the PAO through the
    EC Delegation and framework contract.
  • Campaign of information and sensitisation,
    necessary due to the novelty of Twinning
    instrument, has started.
  • Finally, very preliminary pipeline of Twinning
    Projects has been established, based on the first
    project proposals or just ideas submitted by
    Armenian Public Institutions.

5
Key Actors in Twinning
INSTITUTIONS INVOLVED PAO Armenian Public
Administration (Focal Points) NCP (of EU Member
States) EC Delegation to Armenia EC Headquarters
PERSONS INVOLVED Project Leaders Resident
Twinning Adviser (RTA) RTA Counterpart Short Term
Experts
6
Key Actors PAO
  • PAO (Programme Administration Office),
    established within the Ministry of Finance and
    Economy, - Unit dedicated to the co-ordination
    and management of twinning and TAIEX operations
    in Armenia.
  • Assists the Armenian Administration at all stages
    of the twinning preparation development of
    proposals preparation of twinning fiches and
    contract drafting
  • Central point of communication between the
    European Commission, the EU MS NCPs and the
    Armenian Administrations/Focal Points.

7
Key Actors Project Leaders, EU MS and Armenian
  • Should be a high-ranking officials who are in a
    position to operate at the appropriate level.
  • Will continue to work in their administrations
    but devoting a portion of his/her time to
    conceiving, supervising and coordinating the
    project
  • The Member State PL Should devote to the project
    a minimum 3 days a month, including a visit on
    the spot every 3 months.

8
Key Actors RTA and his Armenian Counterpart
RTA Resident Twinning Adviser
  • Civil servant from an EU MS who will work in an
    Armenian administration for at least twelve
    consecutive months
  • Provides technical advice and assist the
    Armenian Administration as outlined in the
    twinning work plan agreed between the EU MS and
    Armenia.
  • Responsible for the day-to-day coordination and
    implementation of the Twinning project in
    Armenia.
  • RTAs Armenian
    Counterpart
  • Ensures close cooperation in the day-to-day
    implementation of the twinning project
  • Sufficiently experienced on the subject of the
    twinning project

9
Main steps of Twinning Cycle
  • The Twinning project idea is firstly identified
    within the Armenian Public Institution. The focal
    point of this Armenian institution submits the
    concept note to the PAO.
  • If the PAO and the EC Delegation agree with the
    project concept, the Armenian institution will be
    assisted by an expert, selected by the EC
    Delegation, to draft a Project fiche.
  • The project fiche should be approved by the EC
    (DEL and AIDCO/A6), after the thorough checking
    of its content and format.
  • After the approval, the Project fiche will be
    circulated to 27 Member States.
  • The NCPs will submit the proposals of MS
    administrations for the Twinning Project to the
    EC Delegation to Armenia.

10
Main steps of Twinning Cycle
  • The Selection and Evaluation meetings will be
    held in Armenia. The Armenian administration will
    choose, together with EC representatives, the
    future partner only on a quality basis, since the
    budget is already defined in the Project Fiche.
  • The selected MS institutions will draft a
    Twinning contract in close co-operation with the
    Armenian administration, with support of the PAO
    and Delegation.
  • The contract will be signed only after detailed
    verification by all involved actors Armenian
    beneficiary Institution, PAO, the EC (DEL and
    AIDCO/A6).
  • After the signature of the contract, the project
    is implemented during at least 1 year and a new
    synergy is created following the day-to-day
    co-operation between the MS and Armenian
    institutions.

11
Main Features of Twinning Instrument in
Armenian Context
  • Oriented to mandatory results
  • Flexibility
  • Demand-driven
  • Based on principle first come, first served on
    a quality basis
  • (during the starting phase)

12
Indicative Pipeline of Twinning Projects in
Armenia
  • National Statistical Service
  • Ministry of Environment
  • Department of Aviation