Title: AGS RSVP Review
1- AGS RSVP Review
- 4-5 November 2004
- AGS RSVP Upgrades - Overview
- Philip Pile
- Collider-Accelerator Department
- 4 Nov 2004
2Outline
AGS RSVP Upgrades - Overview
- RSVP Construction and Operations
- AGS RSVP Project organization
- RSVP Experiments
- Physics Goals and Beam Requirements
- K0PI0 Issues
- MECO Issues
- General Considerations
3Aerial view
4AGS/RHIC Accelerator Complex
1200 oclock
PHOBOS
200 oclock
1000 oclock
RHIC
400 oclock
800 oclock
600 oclock
- AGS
- Intensity 7 ? 1013 protons/pulse
- Injector to RHIC
- lt 1 hour about every 4 hours
Fast extraction
U-line
High Intensity Source
NSRL (NASA)
m g-2
LINAC
RSVP (NSF)
Pol. Proton Source
AGS
BOOSTER
Slow extraction
TANDEMS
5Past AGS Review
- DOE Review of RSVP Activities at BNL, 27-28 Jan
2004 - Principle charge to review impact of RSVP work on
RHIC operations - Quote from findings
- In summary, the Committee concluded that the
RSVP experiments will have minimal impact on the
Nuclear Physics program at BNL. Plausible
solutions exist for potential higher failure
rates or longer repair times. The overall
management structure of the project was found to
be in the initial stages of development.
6RSVP Operations Plan
- AGS Fixed target experiments are presently not
supported concurrent with RHIC operations since
HEP base support has terminated (FY03). AGS fixed
target experiments are still supported but are
scheduled to operate outside RHIC operations and
only if this can be done with minimal impact to
RHIC activities. Full operations costs are
recovered. Two AGS experiments ran in this mode
in FY2004 K0PI0 (RSVP Experiment) and a US
Atlas test - The NSF plans to provide base support (s for
personnel and materials) for AGS operations for
the RSVP experiments. With this support,
concurrent operation with RHIC is planned as well
as limited running outside RHIC operations. - Logistics of AGS fixed target operation with RHIC
will be covered in another presentation (RSVP
Operations and DD - Pile)
7AGS floor changes, RSVP era
- MECO will be situated in the A-line (7.5 GeV/c
beam). K0PI0 will be situated in the B-line (25.5
GeV/c beam) - The AGS NASA Radiobiology experiment (A3 beam)
will be relocated at RSVP expense. - The RHIC e-cooling RD project will be situated
in the North East Building Addition (C1/C5 beam
area) - The D-line will be decommissioned.
- Beam will be delivered to only one experiment at
a time (no beam splits).
8AGS Experimental Area
- The Plan
- D-Line Decommissioned
- Switchyard simplified
- A,B,C Lines run as ORs
Oct 04
FY2006 Experiments Firm Commitment
V1, p m Beam Line
V-Target
U Line
RHIC Transfer Line
A3 RSVP, MECO E940, m N eN (NSF ? 2005
construction start)
D-Target
NASA Radiobiology
A-Target
B-Target
C-Target
B -Target
B5 RSVP, K0PI0 E926, KL0 p0nn (NSF ? 2005
construction start)
D-Line Decommission FY2006-7
RHIC eCooling Test Facility (under construction)
9Construction with RHIC
RSVP construction during RHIC operations
- Present situation during RHIC injection
- Switchyard not accessible with beam in AGS
- K0PI0 primary cave (B-line) accessible
- MECO primary cave probably ok, fault study needed
- Almost decoupled from RHIC operations
- Plans
- AGS extraction beam plug
- Will allow access in switchyard and elsewhere in
AGS SEB area - New A-line (MECO) beam plug
- Will allow beam in any other beam line
- Will allow work on MECO primary beam from RF
Kicker on - New B-line (K0PI0) beam plug
- Will allow beam in any other beam line
- Will allow work on K0PI0 primary beam outside of
switchyard - This decouples RSVP construction from RHIC
operations
10RSVP Construction Impact on RHIC
- Except for AGS modifications, RSVP construction
will be independent of the RHIC operations state - NO IMPACT
- A combination of present C-AD personnel and new
hires will be used for RSVP construction. If
conflicts arise between RHIC and RSVP priorities
for shared personnel, RHIC wins and RSVP issues
have to be worked out to not impact RHIC - NO IMPACT
11Component activation during RSVP operations
A concern
- Same limits to lost beam power will be applied
during RSVP operations - Accelerators remain maintainable by hand
- K0PI0 proton throughput ( 20 Tp/s) is similar to
previously achieved - MECO proton throughput ( 40 Tp/s) is x2
previously achieved - RSVP integrated protons x2 pre-RSVP era
- Cool-off period of a few hours required to
access activated areas for emergency repairs -gt
possible impact on RHIC. Partially offset by
early detection of failed components. - Preventive replacement of strongly exposed
components - Replace one or two Booster magnets every year as
indicated by High Pot tests - Replace extraction elements once during RSVP
experiment
12RSVP Project Organization
JOINT OVERSIGHT GROUP NSF DOE NP
DOE HEP NSERC
RSVP PROJECT DIRECTOR and DEPUTY W. Willis, J.
Kotcher
MECO WBS 1.3 M. Hebert
KOPIO WBS 1.2 M. Marx
AGS WBS 1.4 P. Pile/A. Pendzick
1.4.4 MECO D. Phillips
1.4.1 AGS Booster K. Brown
1.4.2 Switchyard A. Pendzick
1.4.5 Project Office
1.4.3 K0PI0 C. Pearson
13AGS Infrastructure Costs (fully burdened)
includes Personnel, MS, DTS and Power Costs,
assumes Jan 04 plan, FY06-FY10 running with RHIC
14AGS/Booster WBS 1.4.1
- Four parts to this
- AGS/Booster legacy repairs and high intensity
upgrades (11.5M Direct) - Not part of the original RSVP cost estimate
- Result of internal analysis since the Jan 04 DOE
Review - Environmental requirement - Radiation Caps on AGS
and Booster is largest piece (3.6M Direct) - MECO Specific Modifications (0.9M Direct)
- Was in MECO Experiment WBS prior to July 2004
- K0PI0 Specific Modifications (3.9M Direct)
- Was in K0PI0 Experiment WBS prior to July 2004
- AGS beam development
- Originally in NSF pre-ops budget area (not part
of construction budget)
15Switchyard WBS 1.4.2
- New to the RSVP Project (3.7M Direct)
- Existing switchyard not in condition to support
high intensity operation for RSVP experiments - Simplification/Modernization planned
- Beam plugs to decouple construction work from
beam development - Replace obsolete equipment
- Minimize beam loss
- Achromatic beam tunes to target stations
- No beam servoing
- No ramped magnets
- No beam splitters
- No beam sharing
- No Lambertson magnets
- Less instrumentation needed
- Less maintenance
16K0PI0 WBS 1.4.3 (7.0M Direct)
- Prior to July 2004, managed by the K0PI0
experiment - Primary Beam up to and including target station
- Neutral Beam
- Experimental area
- Project support and integration
17MECO WBS 1.4.4 (7.6M Direct)
- Prior to July 2004, managed by the MECO
experiment - Primary Beam up to and including target station
- Superconducting Solenoid and refrigeration
infrastructure (support role) - Experimental area
- Project support and integration
18AGS Project Office WBS 1.4.5 (1.1M Direct)
- New to the RSVP Project as a result of July 2004
NSF-DOE MOU - Overall schedule and integration
- Fiscal
- Reporting
19 RSVP Participants
- Scientific Collaborations
- US Collaborators
- Arizona State University
- Boston University
- Brookhaven National Laboratory
- University of California, Irvine
- University of California, Berkeley
- University of Cincinnati
- University of Houston
- University of Massachusetts, Amherst
- Stony Brook University
- University of New Mexico
- New York University
- University of Pennsylvania
- Syracuse University
- Thomas Jefferson National Accel Facility
- University of Virginia
- Virginia Polytechnic Institute and State
University - College of William and Mary
Sponsoring agency National Science Foundation,
Division of Mathematical and Physical Sciences,
MREFC Program. Host Laboratory Brookhaven
National Laboratory, Operated by Brookhaven
Science Associates for the Department of Energy,
Office of Science, Division of Nuclear Physics
20RSVP Physics
_
- KOPIO- Measurement of KL ? ?0??
- Uniquely determines JCP, the fundamental
parameter of SM CP-violation, with 2
precision - Single event sensitivity lt1x10-12 (SM predicts
3 x 10-11) - 105 improvement over previous experiments
- MECO Search for m-N ? e-N
- Not allowed in SM, allowed in SUSY models at
10-15 level - Single event sensitivity lt2x10-17 (present
limit 6x10-13)
21K0PI0 Experiment
22K0PI0 Floor Layout
K0PI0 K0L ? p0nn
B-Target
K0PI0 Floor Layout
23MECO - Fatures
24MECO floor layout
MECO Experiment
RF Kicker
A-Target
8 GeV/c Beam
25Summary RSVP Beam Requirements
- KOPIO
- 100 ?1012 ppp 5.3 s cycle extraction _at_ 25.5
GeV/c 20 ?1012 p/s - Proton throughput (p/s) achieved
- AGS injection energy upgrade to 2 GeV and Booster
injection improvements to reach 100 ?1012 ppp
(RD) - Slow extraction with micro-bunching (lt300ps (s)
every 40 ns) - Extraction with high frequency cavity (25 MHz,
100 MHz) (RD) lt 250 ps every 10 ns demonstrated
(FY02 test) no change in losses - Extinction of 10-3 (RD), 8x10-6 demonstrated
using 4.5 MHz cavity FY04 - MECO
- 40 ?1012 ppp 1 s cycle extraction _at_ 7.5
GeV/c 40 ?1012 p/s - No transition losses and reduced AGS injection
losses (RD) - Slow extraction of 2 bunches with 10-9
extinction during 1.35 ms gap. - h2 Booster operation achieved 22?1012 protons
per Booster cycle - Two Booster cycles per AGS cycle
- Bunch merging to 2 bunches or develop h1 Booster
ops. (RD) - Gap cleaning with resonant transverse kicker plus
RF kicker in beam line (RD) - lt 1x10-7 extinction achieved at 7.4 GeV/c with
one low intensity AGS bucket filled, FY98 test
26K0PI0 Test Beam Result Microbunch width
Simulation
2002 test beam result
93 MHz cavity at 22 kV gave s 240 ps.
93 MHz cavity at 22 kV gave s 217 ps.
Simulation
Data
Microbunch time, in ns
Microbunch time, in ns
27K0PI0 Test Beam result Interbunch Extinction
2004 Test Beam Result
Simulation
4.5 MHz cavity at 130 kV gave e 8 (/- 6) x
10-6
4.5 MHz cavity at 130 kV gave e 1.7 (/- 0.9)
x 10-3.
Interbunch events
Simulation
Data
Interbunch events
Microbunch time, in ns
Microbunch time, in ns
28Extinction Test
29Summary AGS modifications
- K0PI0 (intensity, bunch width and extinction)
Partially funded through Canadian Foundation for
Innovation (CFI) - Additional section for new A10 AGS injection
kicker - Upgraded pulse forming network for Booster
extraction kicker - 25/100 MHz micro-bunching cavities
- MECO (extinction)
- Upgraded AGS AC dipole (CW operation)
- AGS Strip-line kickers (100 ns) and associated
electronics and power amplifiers - External beam line RF Modulated Magnet/Lambertson
dipoles/small cross section target
30More Details
- See
- K0PI0 (Sivertz) and MECO (Hebert) supplemental
information on the web at - http//server.c-ad.bnl.gov/esfd/RSVP/November2004/
rsvp-presentations.htm - And
- AGS/Booster/Switchyard Modifications and RSVP
Beam Implementation Brown, later this morning
31Comments
- With planned AGS/Booster upgrades, RSVP should
operate with full intensity with minimal risk to
RHIC operations - With planned Switchyard reconfiguration, RSVP
experiments will be decoupled from each other and
RHIC operations and should not experience
significant down time due to Switchyard component
failure - The C-AD staff stand ready to accommodate the
needs of both K0PI0 and MECO
32 33AGS Floor RSVP Experiments
Switchyard
34K0PI0, Master Milestone Schedule(assumes a
FY2006 MRE construction start)
35MECO Milestones
MECO Major Milestone Schedule (Assumes an FY2005
MRE Construction Start)
36AGS Switchyard - Present
37RSVP Era Switchyard
38K0PI0 Neut Beam
K0PI0 Neutral Beam Line
Collimators
B-Target
Dipole Sweeper Magnets
39MECO Future Home
A3 (future MECO) Beam Line beam left 2004
Remains of E865
NASA Radiobiology
Muon collider target test facility
Beam Left Side
40MECO Future Home
A3 (future MECO) Beam Line beam right 2004
Beam Right Side
41K0PI0 Future Home
B5 (future K0PI0) Beam Line 2004
E871 Condo
SNS Test Facility