Title: Corcoran General Plan Update


1
Corcoran General Plan Update
  • Planning Commission City Council Study Session
  • Review of Draft General Plan
  • Preferred Land Use Circulation Alternative
  • January 24, 2006

2
Work Program
  • Draft Plan Developed by GPAC Completed
  • Review Work to Date
  • Community Workshop
  • Newspaper Notices Website
  • Background Report
  • GPAC Meetings
  • Review Future Work to Complete
  • Circulate Initial Study/NOP (30 Days), February
    06
  • Start Draft EIR, February 06
  • Circulate Draft EIR (45 days), March 06
  • End of DEIR Period, Start Final EIR, May 06
  • Circulate Final EIR (10 Days), May 06
  • City Council Mtg. Review General Plan, June 06
  • City Council Adopt General Plan, June 06

3
Work to Date
  • Newspaper Notices Website
  • 2 Page size newspaper ads (color) were
    circulated in the Corcoran Journal. Website
    contains all materials completed
  • Visioning Workshop
  • Great turnout, very informative. Resulted in
    likes, dislikes, 6 group maps. Planning
    Principles were then developed
  • Background Report
  • Finished with the exception of Traffic and Noise
    studies. Traffic expected in early February
  • GPAC Meetings
  • 1st meeting, Noise, Safety, Open Space,
    Conservation and Recreation and Air Quality
  • 2nd meeting, Land Use, Circulation, Community
    Design and Public Services and Facilities
  • 3rd meeting, review of Draft General Plan Land
    Use Circulation alternatives

4
General Plan Update Components
  • Noise Element
  • Safety Element
  • Open Space/Conservation/Recreation Element
  • Air Quality Element
  • Circulation Element
  • Land Use Element
  • Community Design Element
  • Public Services and Facilities Element
  • Housing Element (previously adopted)
  • Land Use Circulation Plan
  • State Required Elements Others Optional

5
Content of General Plan
  • Noise Element
  • Specifies noise standards for land uses, 65dB
    exterior and 45 dB interior
  • Noise generating land uses shall incorporate
    mitigation
  • City shall review all development plans to ensure
    conformance with the policy framework in Noise
    Element
  • Safety Element
  • Includes policies to minimize danger from flood,
    fire, aircraft, traffic
  • Open Space/Conservation/Recreation
  • City shall provide parks at ratio of 5.0 acres of
    park/1,000 population
  • City will create and protect open space for
    preservation of natural resources and outdoor
    recreation

6
Content of General Plan
  • Air Quality
  • Need for pedestrian, bike and transit
    accessibility
  • Encourage contiguous development pattern
  • Implement strategies to minimize vehicle trips
  • Circulation Element
  • Street widths for Arterials, Collectors and Local
    streets
  • Permitted usage of traffic calming devices
  • Maintain a roadway LOS of C with a peak hour LOS
    of D
  • Land Use Element
  • Encourage moderate and above mod housing
    throughout City
  • Achieve optimal balance of res., com., ind., and
    open space uses
  • Encourage infill development and contiguous
    development
  • Coordinate school location and site design with
    school district

7
Content of General Plan
  • Community Design Element
  • Encourage planting of street trees and
    landscaping, walkable neighborhoods and
    innovative site planning and housing design
  • Ensure signs are compatible with streetscape, no
    outdoor billboards
  • Height and scale of new development should be
    compatible with surrounding buildings and roof
    equipment screened from view
  • Public Services and Facilities Element
  • Ensure that infrastructure keeps pace with
    development
  • Continue to update sewer, water and storm drain
    mps as needed
  • New growth shall provide adequate means of
    funding the expansion of services and facilities

8
Graphic Plans
  • Land Use Map
  • Location of single-family, multi-family housing
  • Location of commercial land uses
  • Location of industrial land uses
  • Location of future public facilities, especially
    schools (although not parcel specific) and
    parkland
  • Circulation Map
  • Location of Arterials, Collectors and Minor
    Collectors
  • Future connectivity

9
Proposed Land Use Circulation Map
10
Next Steps
  • Started Initial Study (Mid January 06)
  • PC CC Study Session for Draft General Plan
    (1-24-06)
  • Circulate Initial Study/NOP (2-13-06) (30 Days)
  • Start Draft EIR (2-13-06)
  • Circulate Draft EIR (3-30-06) (45 Days)
  • Start Final EIR (5-14-06)
  • PC Meeting, Recommend Adoption to CC (5-22-06)
  • Circulate Final EIR (5-29-06) (10 Days)
  • CC Meeting, Review General Plan, (6-14-06)
  • CC Adoption of Gen. Plan Certification of EIR
    (6-28-06)