Title: Cleco Transmission Planning Summit


1
  • Cleco Transmission Planning Summit
  • Attachment K
  • November 15, 2007
  • Terry Whitmore

2
FERC Order 890 Attachment K OVERVIEW
  • STRAWMAN
  • Presented FERC Little Rock technical conference.
  • White Paper
  • DRAFT ATTACHMENT K
  • Presented FERC Atlanta technical conference.
  • Solicited additional feedback prior to summit.

3
Cleco Power Annual Transmission Planning Process
4
FERC Order 890 Attachment K Definitions
  • Base Case Model
  • Critical Energy Infrastructure Information (CEII)
  • Confidential Information
  • Planning Criteria
  • Construction Plan

5
FERC Order 890 Attachment K Definition Comments
  • Comment - Confidential Information
  • Definition too broad
  • Cleco Response
  • Cleco disagrees. Consistent with FERCs model of
    Protective Order confidentiality provisions of
    OATT.
  • Comment - Construction Plan
  • What is construction plan limited to 5 years
  • Cleco Response
  • Five year time frame came from Clecos budgeting
    dept. Cleco agrees that a plan should exist to
    include proposed projects up to 10 years.

6
FERC Order 890 Attachment K Definition Comments
  • Comment -Base Case Model
  • Specify time period
  • Indicate changes discrepancies in SPP SERC
    models
  • Stakeholders should have input into SPP SERC
  • Cleco Response
  • MMWG set model time frame
  • Cleco submits data for Clecos CA
  • Data same for Cleco in both SPP SERC
  • Stakeholders need to participate through SPP
    SERC process not Cleco.

7
FERC Order 890 Attachment K Planning Process
  • Model Development including input by
    stakeholders.
  • 10 year plan (Construction Plan 1-5, Proposed
    Plan 6 - 10).
  • Coordinated regional planning with adjacent
    transmission owners.

8
FERC Order 890 Attachment K Planning Process
Comments
  • Comment - Input into planning criteria.
  • Cleco response. Planning criteria is industry
    accepted.
  • Comment - Coordinated regional planning with
    adjacent transmission owners.
  • Cleco response. Agree. Only adjacent systems
    are monitored. Change Attach K to transmission
    owners.

9
FERC Order 890 Attachment K Coordination
  • Stakeholders may request formation of committee.
  • Open welcome input from stakeholders.
  • Post calendar of events on OASIS as well as email
    exploder to keep stakeholders up to date on
    planning process as well as allow comments and
    input.
  • Affected systems

10
FERC Order 890 Attachment K Coordination Comments
  • Comment - Summit is to inform stakeholders rather
    than solicit input no follow up.
  • Cleco Response - Section 5.1 clearly states
    stakeholders may comment and provide input. Flow
    chart shows posting pre post summit.
  • Comment Company affiliates cant hold more
    than one seat on stakeholder committee
  • Cleco Response Cleco agrees and language will
    be changed.

11
FERC Order 890 Attachment K Coordination Comments
  • Comment Stakeholder may request any issue
    related to transmission planning be considered by
    committee.
  • Cleco Response Cleco agrees and language will
    be changed.

12
FERC Order 890 Attachment K Openness
  • Willing to share all information, but must
    protect confidential information including CEII.
  • Require requester to sign confidentiality
    agreement.

13
FERC Order 890 Attachment K Openness Comments
  • Comment Signing a confidentiality agreement is
    too excessive.
  • Cleco Response consistent with OATT and we are
    referring ONLY to confidential information. Non
    confidential information does not apply.

14
FERC Order 890 Attachment K Transparency
  • Cleco will allow stakeholder to request base case
    power flow models, planning criteria, as well as
    assumptions for verification and validation of
    studies provided appropriate confidentiality
    agreements are in place.
  • Post construction plan on OASIS.

15
FERC Order 890 Attachment K Transparency
Comments
  • Comment - Stakeholder should be allowed to
    download information directly rather than make a
    request.
  • Cleco response White paper does not specify
    downloading, only process to obtain information.
    Cleco is evaluating technical options including
    eRoom or FTP server

16
FERC Order 890 Attachment K Information Exchange
  • Firm PTP reservations will be modeled during
    active timeframe of TSR, unless it qualifies for
    rollover rights (5 years or more).
  • Network customers (native load non-native load)
    submit a 10 year load forecast DNRs.

17
FERC Order 890 Attachment K Comparability
  • All stakeholders are treated comparably whether
    network, Point to Point, or pre 888.
  • Models and supporting data are available for
    replication duplication of results.

18
FERC Order 890 Attachment K Dispute Resolution
  • Any party may dispute planning process by
    providing written notice of such dispute.
  • Representatives of each party shall negotiate to
    resolve dispute within 10 business days
  • Executive management of each party (30 days)
  • Hire an external mutually agreed upon mediator
  • File section 206 complaint with commission

19
FERC Order 890 Attachment K Dispute Resolution
Comments
  • Comment Should not apply to pre 888 agreements.
  • Cleco response Agree, it is an OATT attachment.
  • Comment Who is independent regional planning
    authority?
  • Cleco response SPP

20
FERC Order 890 Attachment K Regional
Participation
  • Cleco participates in SPP SERC (Entergy) model
    development processes.
  • Coordinate with affected systems
  • Joint planning meetings w/ Entergy (SERC) SPP.
  • Voting member of SPP TWG.

21
FERC Order 890 Attachment K Economic Planning
Studies
  • Separate queue on OASIS for TSR generator
    interconnection.
  • Study annually three (3) highest priorities as
    established by stakeholders (previously 1)

22
FERC Order 890 Attachment K Economic Planning
Studies Comments
  • Comment May be impracticable to submit data at
    time of economic study request.
  • Cleco response Disagree. Execute study, scope
    details must be included.
  • Comment Confidentially of data.
  • Cleco response Agree. Language will be added
    for confidential information.

23
FERC Order 890 Attachment K Economic Planning
Studies Comments
  • Comment Cost of studies above 3 will be
    assigned to requesting parties.
  • Cleco response Agree. Language will be
    modified.
  • Comment Requesting parties be billed as study
    cost are incurred rather than prepayment.
  • Cleco response Draft language to be consistent
    with OATT for study cost payments.

24
FERC Order 890 Attachment K Cost Allocation
  • Reliability Upgrades LPSC rate base for
    planning criteria violations.
  • Economic Upgrades
  • Cost allocated to beneficiary.

25
FERC Order 890 Attachment K Cost Allocation
Comments
  • Comment Stakeholders should have input into
    Planning criteria.
  • Cleco response Clecos planning criteria is in
    accordance with NERC reliability standards SPP
    criteria.
  • Comment Clarity is needed is defining an
    economic study.
  • Cleco response Disagree. Clearly stated that
    if Clecos planning criteria is not violated
    which is reliability, then it is an economic
    upgrade.

26
FERC Order 890 Attachment K Recovery of
Planning Cost
  • Cleco will recover cost for three economic
    studies annually through existing rate structure.
  • Requestor will pay for any additional studies.

27
FERC Order 890 Attachment K Recovery of
Planning Cost Comments
  • Comment Parties should not be exposed to TPs
    cost exceeding estimate.
  • Clecos response Disagree. OATT requires TCs
    to pay for studies.