Title: Qwest Metro Optical Ethernet QMOE Clarification to RFP 090313


1
Qwest Metro Optical Ethernet(QMOE)Clarification
to RFP 09-03-13
  • Tucson Unified School District
  • May 20, 2009

2
Agenda
  • Introductions TUSD Qwest
  • Clarifications to RFP 09-03-13 QMOE Project
  • Site Detail Customer Responsibility Entrance
    Facility
  • Handout of Specifications
  • District Level Design Drawing
  • QMOE Network Component Drawing
  • Phase I Visio Drawing
  • Year I Project Timeline Estimates
  • Year I Project Notes
  • Phase I, II, III Visio Drawing
  • Cisco Equipment List ( CPE)
  • Questions and Answers

3
Introductions-Qwest Team
  • Lynda Santoro Sales Manager II
  • Jim Sanchez Global Account Manager
  • Ed Ruskys Sales Engineer
  • Chris Brown Project Manager

4
Clarifications to RFP 09-03-13
  • Purpose Is to receive clarification on Qwests
    proposal (Existing Contract) in order for TUSD to
    implement the project
  • Question What is included in the Qwest QMOE
    Proposal that was awarded?

5
Clarifications to RFP 09-03-13
  • Answer
  • QMOE service to all locations at the awarded
    bandwidth specifications which are 100 Mbps
    Elementary, 300 Mbps Middle Schools, 500 Mbps
    High Schools, Morrow Center at the Gbps bandwidth
    level including Protect Route and QOS.
  • Monthly Recurring Charges Components QMOE,
    Cisco Equipment, Taxes and Special Billing. When
    complete, MRC will be 213,313.
  • Year 1 Monthly Year 2 Monthly Year Monthly
  • 100,233 163,403 213,313
  • Non Recurring Charges Components Special
    Construction Charge (298,000), QMOE Install and
    Cisco Equipment Install (187,400). Year 2 3
    the same components. Total 485,400
  • Year 1 Year 2 Year 3
  • 200,400 225,500 59,500

6
Clarifications Continued
  • Question Who is responsible for the pathway
    from Qwests pop to the router at the sites?
    Proposal indicates Qwest is responsible
  • Answer Qwest is responsible for providing fiber
    up to the property line. The charge of 485K is
    a one time charge which has been split over 3
    years and has been included in your E-Rate
    submission. (See previous slide for components)
  • Question What schools require the pathway and
    what schools already have it installed?
  • Answer These sites have existing fiber paths
    and will not require further entrance facilities.
    Morrow Center, Sahuaro H.S., Palo Verde H.S.,
    Pistor Middle School, Rincon H.S. All other
    locations will require a site visit to determine
    where on the property line Qwest will meet your
    facilities.

7
District Level Design
7
8
QMOE Network Components
9
QMOE Network Components TUSD Design
9
10
Site Detail
11
Typical Room Layout
12
Customer Responsibility-Entrance Facility
Highlights
  • Customer will meet Qwest at the property line
  • Customer will provide a 4 conduit with a pull
    string
  • Conduit /Inner-duct must pass National Electric
    Code and all city codes
  • Customer must provide a suitable environment for
    the equipment.
  • Customer must provide a dust free environment
    air conditioned room.
  • Customer must provide adequate lightning.
  • Customer must provide AC power.
  • Customer must provide adequate space on a
    backboard for all equipment.
  • Project Manager-Chris Brown will work with TUSD
    on entrance facility specifications. ( Please see
    Customer Premise Responsibilities Handout for a
    complete list of responsibilities)

13
Year 1 Project Timeline
13
14
Year 1 Project Notes
  • Red sites denote priority sites with a high
    demand for bandwidth and also represents the
    fastest install install for Hub Site locations.
  • Beginning in Jul-09 we will complete 4 sites
    every 90 days until complete.
  • Site surveys can be completed and priced within
    2 weeks or sooner to determine entrance facility
    costs.
  • Monthly Billing to occur as QMOE sites are turned
    up.
  • Install charges occur as QMOE sites are turned
    up.
  • Existing DS1s and charges will be removed when
    the TUSD request is made.
  • QOS may be deferred until QMOE is completely
    installed.
  • Per existing contract, TUSD has agreed to pay
    Qwest 200,400 to begin the Year 1 QMOE project.
  • As an option, Qwest is willing to defer the
    200,400 until the first 8 sites have been
    installed. (Last of the priority sites)

15
TUSD Phase I
16
All Phases
17
Customer Premise Equipment (CPE)
Qwest Proprietary and Confidential
17
18
Customer Premise Equipment (CPE)