UBL Naming and Design Rules Subcommittee Report - PowerPoint PPT Presentation

1 / 6
About This Presentation
Title:

UBL Naming and Design Rules Subcommittee Report

Description:

Embedded Documentation. Nillibility. Wildcards. Local vs ... Embedded Documentation. LMI. Plans for the next cycle. NDR sections assigned to individual members ... – PowerPoint PPT presentation

Number of Views:44
Avg rating:3.0/5.0
Slides: 7
Provided by: oasis3
Category:

less

Transcript and Presenter's Notes

Title: UBL Naming and Design Rules Subcommittee Report


1
UBL Namingand Design Rules Subcommittee Report
  • Mark Crawford
  • OASIS UBL NDR SC vice-chair
  • 22 November 2002
  • Closing plenary of F2F 6
  • Menlo Park, Ca, USA

2
Work done in NDR SC this time
  • NDR document review
  • Context methodology planning
  • Versioning
  • CCT module work
  • Identifiers
  • Embedded Documentation
  • Nillibility
  • Wildcards
  • Local vs Global
  • Relationship with ATG

3
Open Technical Agenda
  • Local vs. Global
  • Need example of simple
  • Versioning (Still Needs Vote)
  • Code List Specification
  • CCT Module Work
  • Containership
  • Referencing Strategies
  • Reference CCT, electronic address
  • Reference of CC to ABIEs
  • Reference vs inline to reflect relationships
    between data
  • Facets
  • Embedded Documentation

4
Plans for the next cycle
  • NDR sections assigned to individual members
  • Inputs to editor (Mark or Lisa) by 15 December
  • Public snapshot on or about December 30
  • Weekly internal-review drafts with change bars up
    through F2F 7
  • Smooth for release at end of F2F 7

5
Issues
  • Containership
  • Disconnect between NDR and LCSC
  • Inclusion of other Schemas
  • Schedule

6
Thanks!Questions?
  • mcrawford_at_lmi.org
  • http//www.oasis-open.org/committees/ubl/ndrsc/
Write a Comment
User Comments (0)
About PowerShow.com