Streets: Intact for 1500 Years - PowerPoint PPT Presentation

1 / 84
About This Presentation
Title:

Streets: Intact for 1500 Years

Description:

Streets: Intact for 1500 Years – PowerPoint PPT presentation

Number of Views:39
Avg rating:3.0/5.0
Slides: 85
Provided by: paulat
Category:
Tags: intact | streets | years

less

Transcript and Presenter's Notes

Title: Streets: Intact for 1500 Years


1
(No Transcript)
2
Streets Intact for 1500 Years
3
(No Transcript)
4
(No Transcript)
5
Conventional
6
Traditional
7
Trip Assignment Conventional
8
Trip Assignment Traditional
9
Network and Capacity
2
2
4
2
Same Total Lanes
6
6
2
  • More Capacity
  • VMT
  • Turns
  • Clearance Time
  • Signal Phase

2
4
10
Incremental Efficiency
800 600 400 200
Capacity of Additional Through Lane (VPH)
11
Speed-Flow Relationship
60
50
40
Maximum Volume 25-30 Miles Per Hour
30
Speed (MPH)
20
10
0
0
200
400
600
800
1000
1200
1400
1600
1800
2000
Hourly Vehicles Per Lane
12
25th Moonwalk Anniversary
13
Conventional Suburban Development
14
Traditional Town Center
15
Conventional Suburban Development
Traditional Town Center
16
(No Transcript)
17
Sparse Versus Dense Networks
Single routing large switching load
Small link capacity
Small switching load
Many routings
2-Way Portable Business Radio 150, 450, 800, 900
mhz
Cellular telephone
18
Support Map
Scope of Effort
Joint Private Public
Small Area Urban Designs, Site Designs
Form-Based Code
Design Guidelines (Standards)
Strategies Plan, Program
Public
Short Range
Long Range
Time Span
19
Element 5
  • Places to Stop

20
Quality 5
  • Permeability

21
Quality 2
  • Comfort

22
Quality 6
  • Respectful Buildings

23
Quality 1
  • Walkability

24
Element 4
  • Design Details

25
Quality 8
  • Good Desigan and Execution

26
Element 2
  • Starting and Finish Points

27
Element 7
  • People through
  • Density

¼ Mile
28
Element 6
  • Accessible

29
Quality 3
  • Definition

30
Element 12
  • Time

31
(No Transcript)
32
Evolution of Integrated Land Use and
Transportation Plans
33
Pieces and Parts
34
Pieces and Parts
35
Pieces and Parts
36
Pieces and Parts
37
From Underground Up
38
(No Transcript)
39
(No Transcript)
40
The Charette Key Three feedback loops in less
than a week
Source NCI National Charrette Institute
41
(No Transcript)
42
(No Transcript)
43
Rural-to-Urban Transect
T1
T2
T3
T4
T5
T6
Drawings by James Wassell
44
Cross-Section Elements
Drainage Parking Sidewalk Bikes Trees Lights
45
Frontage Elements
Address Street
Enclose Street
Building Siting
Random
On Premise
Parking
Park-Once
Individual
46
Network Elements
500-800
300-500
Street Spacing
Shared Controlled
Private, Uncontrolled
Street Access
Alley
47
Differences with Form-Based Codes
2. De-emphasizes land use in favor of
building form and typology
48
Angle at 500 Feet
THEME
Parking
Frontage
300 Ft
30 Ft
DRIVER CUE
Abstract, Point
Real, Linear
PARKING FORWARD
BUILDING FORWARD
DESIGN SPEED
50-60 mph
20-30 mph
Building Site
49
Supermarket - Bad
50
Supermarket - Good
Andrews Avenue, Fort Lauderdale
51
Photo by Payton Chung
Supermarket - Good
Atlantic Station, Atlanta
52
(No Transcript)
53
Self-Storage Facility - Bad
54
(No Transcript)
55
Home Depot - Bad
56
Photo by Payton Chung
Home Depot - Good
Halsted Street, Chicago
57
Fast Food Franchise - Good
Orange Avenue, Orlando
58
Park-Once Parking
2-Faced
Continuous Vibrant Walk
1-Faced
3-Faced
Low Threshold
Off-Street Parking
59
Put the Fat Chicken Out Front David
Butterfield
60
Face 2 Parking Lot
61
Face 1- Town Center
62
Face 2 - Boulevard
63
Face 3 - Parking Lot
64
Exclusive Parking
Office
TOTAL SPACES
Restaurant
5 1/2 6 per 1,000 sf
EMPTY
Entertainment
6
Noon
6
65
(No Transcript)
66
Shared Parking
Restaurant
Entertainment
TOTAL SPACES
2 1/2 3 per 1,000 sf
Office
6
Noon
6
67
Parking
  • Not enough?
  • No Public parking
  • Negative first impression
  • No enforcement of street parking
  • Predatory towing
  • No on-street on Cumberland

68
  • 121 Spaces
  • High Occupancy
  • Park-once District
  • Public, not Private
  • Drop Off
  • E-Commerce
  • Pedestrians
  • Safety

69
Support Map
Scope of Effort
Joint Private Public
Small Area Urban Designs, Site Designs
Form-Based Code
Design Guidelines (Standards)
Strategies Plan, Program
Public
Short Range
Long Range
Time Span
70
Ideal Traffic Planning
Widen
20-Year Forecast
Capacity
Years
71
Traffic Planning The Reality
Actual
Widen
Induced Traffic
Forecast
Capacity
Years
72
(No Transcript)
73
Road Size, Not Congestion is the Choice
Congestion
Widen
Congestion
Widen
Traffic
Congestion
Capacity
Years
74
Trying to cure traffic congestion with more
capacity is like trying to cure obesity by
loosening your belt
- Glen Heimstra, Futurist
75
Road Size, Not Congestion is the Choice
No Option
Congestion
Widen
Reduced Options
Congestion
Widen
Choice
Traffic
Congestion
Capacity
Years
76
Supply and Demand
New Market Price Points
Price
Old Policy
Demand
77
(No Transcript)
78
Rerouting Chain Reaction
Main Street
Bypass
79
(No Transcript)
80
(No Transcript)
81
LOS Versus Capacity
95-100
Rail Transit Mixed Destinations Mixed
Origins/Destinations Network Flex Peak
Shift Actual Capacity
20
200 150 100 80 60 40 20 0
15
30
15
20
5
5
E D C B A
E D C B A
7
7
16
16
22
22
50
50
Traffic Level of Service
Transportation Capacity
82
Downtown Norfolk Travel Profiles
TRIPS
Entertainment
Office Commute
Community College
Shop
Visitor
6 am 9am 12am 3pm 6pm 9pm
83
People will get sick and tired of traffic
congestion and...
Karl Rasmussen State Traffic Engineer, Minnesota
84
and move into the city.
Karl Rasmussen State Traffic Engineer, Minnesota
85
Support Map
Scope of Effort
Joint Private Public
Small Area Urban Designs, Site Designs
Form-Based Code
Design Guidelines (Standards)
Strategies Plan, Program
Public
Short Range
Long Range
Time Span
86
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com