Title: Streets: Intact for 1500 Years
1(No Transcript)
2Streets Intact for 1500 Years
3(No Transcript)
4(No Transcript)
5Conventional
6Traditional
7Trip Assignment Conventional
8Trip Assignment Traditional
9Network and Capacity
2
2
4
2
Same Total Lanes
6
6
2
- More Capacity
- VMT
- Turns
- Clearance Time
- Signal Phase
2
4
10Incremental Efficiency
800 600 400 200
Capacity of Additional Through Lane (VPH)
11Speed-Flow Relationship
60
50
40
Maximum Volume 25-30 Miles Per Hour
30
Speed (MPH)
20
10
0
0
200
400
600
800
1000
1200
1400
1600
1800
2000
Hourly Vehicles Per Lane
1225th Moonwalk Anniversary
13Conventional Suburban Development
14Traditional Town Center
15Conventional Suburban Development
Traditional Town Center
16(No Transcript)
17Sparse Versus Dense Networks
Single routing large switching load
Small link capacity
Small switching load
Many routings
2-Way Portable Business Radio 150, 450, 800, 900
mhz
Cellular telephone
18Support Map
Scope of Effort
Joint Private Public
Small Area Urban Designs, Site Designs
Form-Based Code
Design Guidelines (Standards)
Strategies Plan, Program
Public
Short Range
Long Range
Time Span
19Element 5
20Quality 5
21Quality 2
22Quality 6
23Quality 1
24Element 4
25Quality 8
- Good Desigan and Execution
26Element 2
- Starting and Finish Points
27Element 7
¼ Mile
28Element 6
29Quality 3
30Element 12
31(No Transcript)
32Evolution of Integrated Land Use and
Transportation Plans
33Pieces and Parts
34Pieces and Parts
35Pieces and Parts
36Pieces and Parts
37From Underground Up
38(No Transcript)
39(No Transcript)
40The Charette Key Three feedback loops in less
than a week
Source NCI National Charrette Institute
41(No Transcript)
42(No Transcript)
43Rural-to-Urban Transect
T1
T2
T3
T4
T5
T6
Drawings by James Wassell
44Cross-Section Elements
Drainage Parking Sidewalk Bikes Trees Lights
45Frontage Elements
Address Street
Enclose Street
Building Siting
Random
On Premise
Parking
Park-Once
Individual
46Network Elements
500-800
300-500
Street Spacing
Shared Controlled
Private, Uncontrolled
Street Access
Alley
47Differences with Form-Based Codes
2. De-emphasizes land use in favor of
building form and typology
48Angle at 500 Feet
THEME
Parking
Frontage
300 Ft
30 Ft
DRIVER CUE
Abstract, Point
Real, Linear
PARKING FORWARD
BUILDING FORWARD
DESIGN SPEED
50-60 mph
20-30 mph
Building Site
49Supermarket - Bad
50Supermarket - Good
Andrews Avenue, Fort Lauderdale
51Photo by Payton Chung
Supermarket - Good
Atlantic Station, Atlanta
52(No Transcript)
53Self-Storage Facility - Bad
54(No Transcript)
55Home Depot - Bad
56Photo by Payton Chung
Home Depot - Good
Halsted Street, Chicago
57Fast Food Franchise - Good
Orange Avenue, Orlando
58Park-Once Parking
2-Faced
Continuous Vibrant Walk
1-Faced
3-Faced
Low Threshold
Off-Street Parking
59Put the Fat Chicken Out Front David
Butterfield
60Face 2 Parking Lot
61Face 1- Town Center
62Face 2 - Boulevard
63Face 3 - Parking Lot
64Exclusive Parking
Office
TOTAL SPACES
Restaurant
5 1/2 6 per 1,000 sf
EMPTY
Entertainment
6
Noon
6
65(No Transcript)
66Shared Parking
Restaurant
Entertainment
TOTAL SPACES
2 1/2 3 per 1,000 sf
Office
6
Noon
6
67Parking
- Not enough?
- No Public parking
- Negative first impression
- No enforcement of street parking
- Predatory towing
- No on-street on Cumberland
68- 121 Spaces
- High Occupancy
- Park-once District
- Public, not Private
- Drop Off
- E-Commerce
- Pedestrians
- Safety
69Support Map
Scope of Effort
Joint Private Public
Small Area Urban Designs, Site Designs
Form-Based Code
Design Guidelines (Standards)
Strategies Plan, Program
Public
Short Range
Long Range
Time Span
70Ideal Traffic Planning
Widen
20-Year Forecast
Capacity
Years
71Traffic Planning The Reality
Actual
Widen
Induced Traffic
Forecast
Capacity
Years
72(No Transcript)
73Road Size, Not Congestion is the Choice
Congestion
Widen
Congestion
Widen
Traffic
Congestion
Capacity
Years
74Trying to cure traffic congestion with more
capacity is like trying to cure obesity by
loosening your belt
- Glen Heimstra, Futurist
75Road Size, Not Congestion is the Choice
No Option
Congestion
Widen
Reduced Options
Congestion
Widen
Choice
Traffic
Congestion
Capacity
Years
76Supply and Demand
New Market Price Points
Price
Old Policy
Demand
77(No Transcript)
78Rerouting Chain Reaction
Main Street
Bypass
79(No Transcript)
80(No Transcript)
81LOS Versus Capacity
95-100
Rail Transit Mixed Destinations Mixed
Origins/Destinations Network Flex Peak
Shift Actual Capacity
20
200 150 100 80 60 40 20 0
15
30
15
20
5
5
E D C B A
E D C B A
7
7
16
16
22
22
50
50
Traffic Level of Service
Transportation Capacity
82Downtown Norfolk Travel Profiles
TRIPS
Entertainment
Office Commute
Community College
Shop
Visitor
6 am 9am 12am 3pm 6pm 9pm
83People will get sick and tired of traffic
congestion and...
Karl Rasmussen State Traffic Engineer, Minnesota
84and move into the city.
Karl Rasmussen State Traffic Engineer, Minnesota
85Support Map
Scope of Effort
Joint Private Public
Small Area Urban Designs, Site Designs
Form-Based Code
Design Guidelines (Standards)
Strategies Plan, Program
Public
Short Range
Long Range
Time Span
86(No Transcript)