Follow-up on Frames Team Activities - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Follow-up on Frames Team Activities

Description:

Frame checking against alternative lists at ... to share frame information ... recommendations for the 'Frame Sufficiency' performance measure ... – PowerPoint PPT presentation

Number of Views:34
Avg rating:3.0/5.0
Slides: 13
Provided by: howardbrad
Category:

less

Transcript and Presenter's Notes

Title: Follow-up on Frames Team Activities


1
Follow-up on Frames Team Activities
  • Presentation to the ASA-Energy Committee
  • Howard Bradsher-Fredrick, SMG
  • April 28, 2005

2
Outline of Presentation
  • Background
  • Previous Frames Team Effort
  • Frames Sufficiency Criteria
  • Results of Frame Evaluation for Sufficiency
  • Frames Team New Activities
  • Recommendations of Latest Team
  • Questions for Committee

3
Background
  • EIA Strategic Plan
  • Provides the impetus for increased efficiencies
    in frames activities
  • Requires frames performance measures concerning
    sufficiency of frames
  • of EIA survey frames with sufficient industry
    coverage to produce reliable supply, demand and
    price statistics.

4
Previous Frames Team Effort
  • Frame checking against alternative lists at
    respondent level
  • Data comparisons at an aggregate level
  • Examining supply/disposition balances
  • For price data, comparing volumes that the price
    data represent with total volumes
  • Dual system methodology

5
Frame Sufficiency Criteria
  • Existence of a systematic maintenance approach
  • Frame volatility over time
  • Use of comparable frame listings from other
    sources
  • Existence of a balancing item and the magnitude
    and stability of the balancing item over time
  • Relative concentration of volumes in a few
    respondents
  • Changes in the industry, legislation, regs, etc.
  • Independent assessment by the survey manager of
    the frames quality

6
Information Collected
  • Initial basic frame information
  • Stability (or volatility of the frame)
  • Corresponding useful listings of frame units
  • Balancing item stability
  • Relative concentration of volume in a few
    respondents (skewed distribution)

7
Results of Sufficiency Evaluation
  • Reviewed 34 frames
  • 5 were deemed out-of-scope
  • The team found 29 frames within the teams
    purview, with 25 deemed sufficient and 4 deemed
    insufficient or dont know.

8
Insufficient Frames
  • EIA-815 (Monthly Terminal Blenders Report)
  • EIA-910 (Monthly Natural Gas Marketers Survey)
  • EIA-886 (Annual Survey of Alternative Fueled
    Vehicle Suppliers and Users)
  • EIA-3 (Quarterly Coal Consumption and Quarterly
    Report, Manufacturing Plants)

9
Limitations of Frames Sufficiency Approach
  • EIA may want to determine sufficiency by survey
    rather than by master frame
  • Pros
  • Better measure of frame sufficiency (perhaps more
    useful for EIA)
  • Cons
  • 67 surveys versus 29 master frames
  • Strategic Plan calls for frame sufficiency.

10
Frames Team New Activities
  • The teams charter states the teams objectives
  • To work toward a long-term goal of enhanced
    commonality in IT
  • To identify opportunities to share frame
    information
  • To monitor the quality of EIA frames, recommend
    needed enhancements to frames, recommend surveys
    to be discontinued or that result tables be
    provided with appropriate caveats
  • To recommend further studies needed to evaluate
    frames sufficiency
  • To prepare updated recommendations for the Frame
    Sufficiency performance measure

11
Recommendation on Teams Activities
  • High Priority
  • Complete/maintain an inventory of EIA frames
  • Conduct quarterly meetings (or special meetings
    as the need arises) among affected or interested
    offices
  • Study/update frame documentation standards
  • Medium Priority
  • Develop best practices for system maintenance,
    support flexibility of system design
  • Look into replacing existing standard on Frames
    Maintenance Development with a revised version

12
Questions for Committee
  • Are there any suggestions as to how to proceed in
    determining sufficiency of frames in the future?
  • Are there any comments or advice regarding the
    current frames teams recommendations?
Write a Comment
User Comments (0)
About PowerShow.com