Proton Plan prereview - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

Proton Plan prereview

Description:

Good shape. Need to quantify benefit. 30 Hz harmonic: Need to ... MI-8 in good shape. Need more definite plan for ring collimation and overall radiation issue ... – PowerPoint PPT presentation

Number of Views:28
Avg rating:3.0/5.0
Slides: 9
Provided by: home7
Category:
Tags: plan | prereview | proton

less

Transcript and Presenter's Notes

Title: Proton Plan prereview


1
Proton Plan pre-review
  • Took place July 21-22
  • Final report (will be) available at Proton Plan
    website
  • http//www-accel-proj.fnal.gov/internal/Proton_Pla
    n/Reviews/AD_Rev_7_21_05.html
  • Went OK, considering how many changes we went
    through the week before, but
  • Tentatively decided to delay directors review
    until October
  • Would mean shutdown jobs would be a fait accompli.

2
General Comments about Presentation
  • Need more on justification for projects and how
    things get into the plan
  • More documentation!
  • Technical
  • Cost basis
  • Reviewmanship
  • Should have practiced
  • Keep our arguments to ourselves
  • Standardize talk format

3
Linac Feedback
  • Quad power supply upgrades
  • Good idea
  • Need more detail
  • LLRF upgrade
  • Probably a good idea
  • Need more detail
  • Both projects need an estimate of benefit of
    improved stability to Booster

4
Booster Feedback
  • General
  • Need to at least discuss longitudinal dynamics
    issues, even if theyre covered by something else
    (Run II, RRT).
  • Combine with Gamma-t section
  • ORBUMP/400 MeV project
  • Good shape
  • Need commissioning plan
  • Beam dump relocation
  • Good shape
  • Need to quantify benefit
  • 30 Hz harmonic
  • Need to work on our physics case
  • Abandon if hopeless

5
Booster Feedback (contd)
  • Corrector upgrade
  • Worthwhile, even at the price.
  • Consider increasing quad power from .1 to .25
    units of tune
  • BIG deal
  • Need to look at both magnet design and
    justification
  • Work to quantify benefit
  • Orbit motion
  • Local sextupoles
  • Need to include software development
  • Booster RF
  • Clearly, reliability is a major concern.
  • We have no solid plan.
  • Enthusiasm for solid state upgrade, even though
    we didnt ask for it.
  • Need to quantify reliability issues.

6
Main Injector Feedback
  • Multibatch operation
  • Need a more explicit plan
  • Collimation and radiation
  • MI-8 in good shape
  • Need more definite plan for ring collimation and
    overall radiation issue
  • Large aperture quads
  • Can we get them all in if we get the full 14 week
    shutdown?
  • RF
  • Weve come a long way, but still need to clarify
    whether we will need any dual PA RF cavities.

7
Budget and Schedule Feedback
  • Lots and lots of comments, mostly from Peter G.
  • This is why we have a project support team.

8
Projections
  • Based on current slip stacking performance,
    projections for NuMI get pretty grim.
  • Need a better plan for increasing batch intensity
    and pushing NuMI slip stacking.
Write a Comment
User Comments (0)
About PowerShow.com