1 billion to reduce freight emissions. Reductions not required by law or regulation ... 4 years for harbor craft, grid-based shore power. San Diego APCD ... – PowerPoint PPT presentation

Number of Views:49
Avg rating:3.0/5.0
Slides: 15
Provided by: otay
Category:

less

Transcript and Presenter's Notes

Title: Proposition 1B Funding Opportunities


1
Proposition 1B Funding Opportunities
  • San Diego/Border Region Workshop
  • April 2, 2008
  • Chuck Spagnola
  • San Diego County Air Pollution Control District

2
Program Authority
  • Proposition 1B in 2006
  • 1 billion to reduce freight emissions
  • Reductions not required by law or regulation
  • Governors Executive Order S-02-07
  • Implementing legislation
  • Senate Bill 88 and Assembly Bill 201
  • ARB to adopt Program Guidelines
  • First 250 million in FY2007-08 budget

3
Trade Corridors
Bay Area
Central Valley SJV Air Basin Sac Region
LA/Inland Empire South Coast Air Basin
Port Hueneme
San Diego/Border San Diego Imperial Counties
4
Draft Trade CorridorFunding Targets
Bay Area
San Diego/ Border
Los Angeles/ Inland Empire
Central Valley
Includes administrative funding
5
Equipment Project Options (FY2007-08 Funds)
Retrofit Repower Replacement
Port/Rail Yard Trucks
Retrofit Repower Replacement 3-way truck transa
ction
Other Trucks
Switcher Line-haul
Locomotives
Shore Power
Grid Non Grid Infrastructure
Tugs/ Tows Other Vessels
Harbor Craft
Cargo Equipment
Energy Storage System
Electric Infrastructure
Truck Stop Electrification
6
Project Options Other Trucks
  • Air Pollution Control District
  • San Diego County at Large and Border
  • Outreach Started
  • First workshop March 21, 2008
  • Second Workshop April 2, 2008
  • Program level data for 200 trucks

7
Selecting Equipment ProjectsLocal Agency Process
  • Solicit applications from equipment owners
  • Competitively rank projects
  • Submit request for funds to ARB
  • Award funds to top project and continue down list
    until funds are exhausted (remainder of list may
    be backup projects)
  • Conduct pre-inspections and sign contracts

8
Specificationsfor Each Equipment Project Option
  • Eligibility of existing equipment
  • Equipment upgrade specifications and deadlines
    for completion
  • Funding caps and project life
  • Operating conditions and tracking devices
  • Inspection and scrappage requirements
  • Recordkeeping and reporting

9
Match Funding
  • Bond funding caps 1/5 to 1/2 of total cost
  • Match ratio ranges from 51 to 11
  • Match funds remaining from private or public
    sources to cover project costs
  • Projects using less State dollars have
    competitive advantage
  • (State bond plus discretionary Moyer funds)

10
Accountability
  • Verification of eligibility
  • Equipment inspections
  • Enforceable legal agreements
  • Ongoing project evaluations
  • Periodic audits (including financial)
  • Regular reporting requirements

11
Key Stakeholder Issues
  • Equipment project specifications
  • 100 California operation
  • Project funding caps and life
  • Fund reversion
  • Proposed On-Road In-Use Truck Rule

12
Program Schedule
13
FY 2007-08 Deadlines
  • From grant agreement with ARB
  • 18 months to sign contracts with equipment
    owners
  • Project completion/final payment in
  • 1 year for cargo cranes
  • 18 months for trucks
  • 2 years for locomotives, non-grid shore power
  • 3 years for truck stop electrification
  • 4 years for harbor craft, grid-based shore power

14
San Diego APCDProposition 1B Contacts
  • Chuck Spagnola
  • 858-586-2643
  • Chuck.Spagnola_at_sdcounty.ca.gov
  • Mike Watt
  • 858-586-2711
  • Michael.Watt_at_sdcounty.ca.gov
  • Domingo Vigil (Se Habla Español)
  • 858-586-2644
  • Domingo.Vigil_at_sdcounty.ca.gov
  • http//www.arb.ca.gov/bonds/gmbond/gmbond.htm