Title: Proposition 1B Funding Opportunities
1Proposition 1B Funding Opportunities
- San Diego/Border Region Workshop
- April 2, 2008
- Chuck Spagnola
- San Diego County Air Pollution Control District
2Program Authority
- Proposition 1B in 2006
- 1 billion to reduce freight emissions
- Reductions not required by law or regulation
- Governors Executive Order S-02-07
- Implementing legislation
- Senate Bill 88 and Assembly Bill 201
- ARB to adopt Program Guidelines
- First 250 million in FY2007-08 budget
3Trade Corridors
Bay Area
Central Valley SJV Air Basin Sac Region
LA/Inland Empire South Coast Air Basin
Port Hueneme
San Diego/Border San Diego Imperial Counties
4Draft Trade CorridorFunding Targets
Bay Area
San Diego/ Border
Los Angeles/ Inland Empire
Central Valley
Includes administrative funding
5Equipment Project Options (FY2007-08 Funds)
Retrofit Repower Replacement
Port/Rail Yard Trucks
Retrofit Repower Replacement 3-way truck transa
ction
Other Trucks
Switcher Line-haul
Locomotives
Shore Power
Grid Non Grid Infrastructure
Tugs/ Tows Other Vessels
Harbor Craft
Cargo Equipment
Energy Storage System
Electric Infrastructure
Truck Stop Electrification
6Project Options Other Trucks
- Air Pollution Control District
- San Diego County at Large and Border
- Outreach Started
- First workshop March 21, 2008
- Second Workshop April 2, 2008
- Program level data for 200 trucks
7Selecting Equipment ProjectsLocal Agency Process
- Solicit applications from equipment owners
- Competitively rank projects
- Submit request for funds to ARB
- Award funds to top project and continue down list
until funds are exhausted (remainder of list may
be backup projects)
- Conduct pre-inspections and sign contracts
8Specificationsfor Each Equipment Project Option
- Eligibility of existing equipment
- Equipment upgrade specifications and deadlines
for completion
- Funding caps and project life
- Operating conditions and tracking devices
- Inspection and scrappage requirements
- Recordkeeping and reporting
9Match Funding
- Bond funding caps 1/5 to 1/2 of total cost
- Match ratio ranges from 51 to 11
- Match funds remaining from private or public
sources to cover project costs
- Projects using less State dollars have
competitive advantage
- (State bond plus discretionary Moyer funds)
10Accountability
- Verification of eligibility
- Equipment inspections
- Enforceable legal agreements
- Ongoing project evaluations
- Periodic audits (including financial)
- Regular reporting requirements
11Key Stakeholder Issues
- Equipment project specifications
- 100 California operation
- Project funding caps and life
- Fund reversion
- Proposed On-Road In-Use Truck Rule
12Program Schedule
13FY 2007-08 Deadlines
- From grant agreement with ARB
- 18 months to sign contracts with equipment
owners
- Project completion/final payment in
- 1 year for cargo cranes
- 18 months for trucks
- 2 years for locomotives, non-grid shore power
- 3 years for truck stop electrification
- 4 years for harbor craft, grid-based shore power
14San Diego APCDProposition 1B Contacts
- Chuck Spagnola
- 858-586-2643
- Chuck.Spagnola_at_sdcounty.ca.gov
- Mike Watt
- 858-586-2711
- Michael.Watt_at_sdcounty.ca.gov
- Domingo Vigil (Se Habla Español)
- 858-586-2644
- Domingo.Vigil_at_sdcounty.ca.gov
- http//www.arb.ca.gov/bonds/gmbond/gmbond.htm