Title: SEACOOS NowcastForecast System Status
1SEACOOS Nowcast/Forecast System Status
- MPCC
- JAX, FLA
- 27 May, 2003
2SEACOOS Model Domains
- Scale of Atmos Forcing
- Mixed Tidal Regimes
- Various Manifestations of WBC
3Common SNFS Modeling Issues
- Bathymetry
- Open-water BCs
- Elevation
- Tides - FES, OSUs TPXO, Tierney et. Al.
- remote signal (weatherother)
- Mass Flux
- Surface Fluxes , Various Met Model Choice
- AWIP versions of NCEPs ETA10
- Nonhydrostatic research versions
- Interior Initialization Mass Field
- Climatology
- HYCOM,MERCATOR, COFS, POM (Oey)
4Common Issues
- Routine Acquisition of Met Model Output
- Either Direct from NCEP ftp or via LDM
- Manipulation of GRiB data to Model
- Storage (mass archival of ocean model outputs,
but particularly NCEP products) - O(1 Terabyte/year) for NCEP products alone
5SEACOOS SNFS Initial (year 1) Goals
determined _at_ NCSC Meeting, Jan 2003
- Computation of 24Hr Nowcasts XX Hr Forecasts
- Forward dynamics only (no Data Assimilation)
- Barotropic mode only, driven by tidal OBCs and
surface momentum flux from NCEP ETA12 - No model coupling (I.e., no inter-domain
communication) - Standard output formats for web serving and
graphics applications - netCDF files, common parameters (UVbar, UVsurf,
Surf. Elev., etc) - Publication to web via local DODS servers
- oceanlab.rsmas.miami.edu
- www.seacoos.ncsc.org, USF TBA
6Operational System Timeline
7Model Parameter/Physics Table
8Model Domain Stats
9System Forcings
10System Timings (local time)
11System Visualization
- 2-D model fields
- Regional wind field
- Water level
- Depth-averaged currents
- Drifter trajectories
- Observed vs. Computed time series
- Water level
- ADCP
12NCEP Wind fields
13Vertically averaged currents
14Drifter Trajectories
USF
UNC
15Water level Time Series (1)
USF
16Water level Time Series (2)
U Miami
17Water level Time Series (3)
UNC
18(No Transcript)
19To Do.
- Examine topography, coastline
- Synchronize system timings
- Standardize netCDF contents
- Common interpolated grid?
- Manuscript
20(No Transcript)
21Status of North Carolina Supercomputer Center in
RTP, NC
- Board of directors voted to cease operations 30
June 2003 - Loss of archival site
- . computational nodes
- Serious impact on
- UNC (SABLAM/NOPP, particularly)
- DODS server (nemo.seacoos.ncsc.org)
- Likely solution migration of processes/codes to
UNC
22(No Transcript)
23(No Transcript)
24Mapping GRiB to Model Nodes
NCL scripts
TriPack
GRiB netCDF
Arbitrary nodes
25NCSC Meeting, Jan 2003