Lab Master - PowerPoint PPT Presentation

1 / 29
About This Presentation
Title:

Lab Master

Description:

Lab Master – PowerPoint PPT presentation

Number of Views:82
Avg rating:3.0/5.0
Slides: 30
Provided by: IM177
Category:
Tags: lab | master | ung

less

Transcript and Presenter's Notes

Title: Lab Master


1
(No Transcript)
2
PRODUCT DEVELOPMENT
  • 1987 RCI Procedure for Built-Up Roofing
  • 1990 Micro ROOFER for DOS Ver. 1.0
  • 1993 RCI Procedure for Single-Ply Roofing
  • 1994 Micro ROOFER for DOS Ver. 2.0
  • 1995 Micro ROOFER for Windows Ver. 1.0
  • 2000 RCI Procedure for Asphalt Shingle Roofs
  • 2000 Micro ROOFER for Windows Ver. 2.0
  • 2004 Micro ROOFER for Windows Ver. 2.1

3
VISUAL INSPECTION
ROOF MOISTURE SURVEY
NETWORK INVENTORY
PROJECT ANALYSIS
NETWORK ANALYSIS
DATABASE REPORTS
BUDGET FORECAST
REPAIR PROJECTS
REPLACEMENT PROJECTS
4
BENEFITS
  • Objective and Consistent Evaluation of Roof
    Condition
  • Systematic and Documentable Engineering Basis for
    Determining Repair/Replacement Needs
  • Identification of Budget Requirements for
    Maintaining Roofs
  • Historical Documentation of Roof Condition

5
DATABASE INVENTORY
  • Buildings
  • Roof Sections

6
(No Transcript)
7
INVENTORY - ROOF SECTION
  • General
  • Perimeter
  • Structural Frame
  • Roof Deck
  • Vapor Retarder / Underlayment
  • Insulation
  • Roof Covering Material
  • Flashings
  • Remarks

8
(No Transcript)
9
(No Transcript)
10
CONDITION ASSESSMENT
  • Visual Inspection of Roof Covering and Flashing
    Components
  • Membrane Condition Index (MCI) (for membrane
    roofs)
  • Shingle Condition index (SCI) (for asphalt
    shingle roofs)
  • Flashing Condition Index (FCI)
  • Roof Moisture Surveys (for insulated membrane
    roofs)
  • Insulation Condition Index (ICI)

11
VISUAL INSPECTION
100

excel.
DISTRESS QUANTITY
85

v. good
70
good
55
MCI
fair
DISTRESS TYPE
40
poor
25
v. poor
DISTRESS SEVERITY
10
failed
0
12
BUR DISTRESSES
  • Membrane
  • Blisters
  • Ridges
  • Splits
  • Holes
  • Surface Deterioration
  • Slippage
  • Patching
  • Debris and Vegetation
  • Improper Equip. Supports
  • Ponding
  • Flashing
  • Base Flashing
  • Metal Cap Flashing
  • Embedded Edge Metal
  • Flashed Penetrations
  • Pitch Pans
  • Drains and Scuppers

13
DISTRESS SEVERITY LEVELS
  • Low
  • minor defect not requiring repair
  • undesirable detail requiring correction when
    re-roofed
  • Medium
  • problem requiring permanent repair
  • High
  • problem requiring immediate temporary fix until
    permanent repair can be accomplished

14
(No Transcript)
15
(No Transcript)
16
ROOF MOISTURE SURVEYS
Arial Infrared Thermography
17
WET AREAS / CORE SAMPLES
18
(No Transcript)
19
PROJECT LEVEL MANAGEMENT
  • Repair/Replacement Analysis
  • Repair/Replacement Analysis Summary
  • Corrective Action Requirement

20
Membrane Roofing - RCI vs. Age
21
(No Transcript)
22
(No Transcript)
23
NETWORK LEVEL MANAGEMENT
  • Building List
  • Roof Section List
  • RCI
  • RCI Frequency
  • Long Range Budget Plan
  • Inspection Schedule
  • Distress Analysis

24
(No Transcript)
25
(No Transcript)
26
(No Transcript)
27
(No Transcript)
28
IMPLEMENTATION
  • Initial ROOFER Implementation
  • Inventory
  • Inspections/Condition Assessment
  • .08 - .12 / SF
  • Re-Inspection
  • 3 - 5 Year Intervals
  • Inventory Update
  • Inspections / Condition Assessments
  • .03 - .05/ SF

29
IMPLEMENTATION SUPPORT
  • ROOFER TECHNICAL ASSISTANCE CENTER
  • University of Illinois at Urbana-Champaign
  • www.tac.uiuc.edu
  • techctr_at_uiuc.edu
  • 1-800-895-9345
Write a Comment
User Comments (0)
About PowerShow.com