Hydraulic Optimization of the Northern Water Supply System - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

Hydraulic Optimization of the Northern Water Supply System

Description:

Alternative 1 - Pressure Trace for Suction/Discharge (No Controls) J-10. J-102. J-11 ... Alternative 1 - HGL Envelope (With Controls) HSPS. BPS 1. Smoky Hill ... – PowerPoint PPT presentation

Number of Views:175
Avg rating:3.0/5.0
Slides: 23
Provided by: CDM52
Category:

less

Transcript and Presenter's Notes

Title: Hydraulic Optimization of the Northern Water Supply System


1
Hydraulic Optimization of the Northern Water
Supply System
Presentation by Tom Charles, P.E., DEE Jim
Kriss, P.E. Jennifer Wendrowski,
E.I.T. September 2004
2
ECCV H206 Water Supply Facility
WTP High Service PS
  • Renewable Water Supply Source
  • Alluvial Wells and Delivery Network
  • Reverse Osmosis Treatment Plant
  • 32 Mile Transmission Pipeline
  • 2 Pump Stations
  • Phase 2 Improvements (Future)

Booster PS
Smoky Hill Storage
3
Alternative No. 1 Base Model
409 psi
10 MGD
  • System Consists of
  • RO WTP
  • HSPS
  • BPS-1 Tank
  • Storage Tanks
  • 32 miles of 24-inch pipe
  • Problem high discharge pressure from HSPS

24 f
324 psi
4
Alternative No.2 Inline Booster Model
143 psi
24 f
10 MGD
205 psi
  • System Consists of
  • RO WTP
  • HSPS
  • In-line BPS-2 Tank
  • BPS-1 Tank
  • Storage Tanks
  • 7 miles of 24-inch pipe
  • 25 miles of 30-inch pipe

13 MGD
30 f
274 psi
5
Alternative No.3 Booster Injection Model
360 psi
24 f
10 MGD
  • System Consists of
  • RO WTP
  • HSPS
  • Injection BPS-2 Tank
  • BPS-1 Tank
  • Storage Tanks
  • 7 miles of 24-inch pipe
  • 25 miles of 30-inch pipe

213 psi
13 MGD
30 f
266 psi
6
Alternative 1 - Pressure Trace for
Suction/Discharge (No Controls)
7
Alternative 1 - HGL Envelope (No Controls)
Smoky Hill
BPS 1
HSPS
8
Alternative 1 - Pressure Trace for
Suction/Discharge (With Controls)
9
Alternative 1 - HGL Envelope (With Controls)
Smoky Hill
BPS 1
HSPS
10
Alternative 2 - Pressure Trace for
Suction/Discharge (No Controls)
J-10
J-11
J-4
11
Alternative 2 - HGL Envelope (No Controls)
Smoky Hill
BPS 1
BPS 2
HSPS
12
Alternative 2 - Pressure Trace for
Suction/Discharge (With Controls)
13
Alternative 2 - HGL Envelope (With Controls)
Smoky Hill
BPS 1
BPS 2
HSPS
14
Pump Selection - VSD versus CSD
  • Meet System Operating Requirements
  • Match RO Membrane Skid Production
  • Minimize Tank Fluctuations
  • Minimize Pump Cycle Time
  • Minimize Capital and Operating Costs
  • Minimize Pump Room Footprint

15
2 Duty VFD Pumps, 1 Standby
BPS Pump Head/System Curve 30 inch North
Pipeline Floway 18 MKH (5 stg, 1770 rpm, 11.875
trim), 2 VFDs
16
5 Duty CSP Pumps, 1 Standby
BPS Pump Head/System Curve 30 inch North
Pipeline Floway 14 JKH (6 stg, 1770 rpm) 5 pumps
17
Operating Cost Comparison
  • VSP/ CSP Capital Costs Similar
  • Justify VFD Capital Cost?
  • Annual Billing Estimates
  • Present Worth Analysis
  • Pump Power Use for Flow Targets
  • Monthly Demand Distribution
  • System Operation
  • Intermittent Winter Operation
  • Max Capacity during Summer Peak

18
Pump Power Requirements
19
Operating Cost Comparison
  • VSP/ CSP Capital Costs Similar
  • Justify VFD Capital Cost?
  • Annual Billing Estimates
  • Present Worth Analysis
  • Pump Power Use for Flow Targets
  • Monthly Demand Distribution
  • System Operation
  • Intermittent Winter Operation
  • Max Capacity during Summer Peak

20
Variable Speed Billing Estimate
21
Constant Speed Billing Estimate
22
Questions Answers