Title: A Quick Update'''


1
A Quick Update...
  • Robert Bradford
  • University of Rochester
  • February 28, 2007

2
What have I been doing?
  • Nuclear rescattering at Jlab
  • New dataset
  • Just submitted proposal to CLAS collaboration for
    permission to do analysis. Steve will present
    proposal at collaboration meeting this weekend
    (at Jlab)
  • Will hear more about this in near future (next
    week or 2...)
  • FMP Assembly

3
FMP Status
  • We arrived at FNAL February 16 with our tooling
    and materials
  • Have spent last 10 days outfitting WB Hall for
    FMP assembly.
  • Unpacking
  • Work surface for scintillator prep
  • Have received planes and unpacked first one.

4
General WBHall Outfitting
  • Wideband is big empty space.
  • Weve unloaded truck, unpacked our tools.
  • Lab can provide general furnishings
  • storage cabinets,
  • shelving,
  • lab benches...
  • Weve had to do a lot of running around.
  • No wireless access....

5
Scintillator Prep Station
Cut back to allow easy access for tecnicians
  • First step is to prep scintillator
  • Marking layout/plane ID
  • PB collar/absorber material
  • FMP planes are not to spec and will need to be
    shimmed
  • Built large worksurface
  • Slightly larger than plane
  • Bumper allows quick check of dimensional
    tolerance...
  • Shimming guide
  • Will aid Pb installation

6
Scintillator
  • Received crate from Jeff last Thursday (22 Feb).
  • Much better construction no shipping damage
  • Contains all OD and ID scintillator units for FMP

7
Scintillator Inspection
  • Dimensions
  • U plane is fairly close to spec.
  • X plane is narrow by 2 inches
  • Will make shims later today
  • Visual inspection of connector polish
  • Generally good structurally
  • 1 crack in plane
  • Jeff says 2nd plane compromised
  • Have done a quick test with vacuum lifting
    fixture.

8
Status/timeline
  • Will not have Pb absorber until spring
    (purchasing glitch)
  • Timeline
  • Today Frame welding/scintillator prep. Shim
    out narrow dimensions on smaller plane.
  • Tomorrow Will assemble module.
  • Post collab. mtg Instrumentation/PMT/electronics
    integration. Source tests
  • Spring? Install Pb and run additional source
    tests.