Title: Week 2 Contracts, Bonds, and Insurance Specifications


1
Week 2Contracts, Bonds, and InsuranceSpecificati
ons
  • CNT342 Construction Costs and Bid
  • Fall 2001
  • Purdue School of Engineering

2
80,000SF Office Estimate
  • Range of conceptual estimate 5.9 mil 9.8
    mil
  • 7 estimates _at_ 6.54 mil (mid-rise) and 4 _at_ 6.55
    mil (Low-rise) out of the 21 submitted
  • The submitted estimates were all based on same
    cost data
  • Estimates vary due to location, owners
    preference
  • Rough figures of plumbing (4 of project cost),
    HVAC (9), electrical (8) costs

3
Parametric Estimating
  • Commonly used in building construction
  • ENR occasionally publishes examples in some of
    its Quarterly Cost Roundup issues
  • R.S.Means publishes Means Square Foot Costs
    annually which includes unit costs for a number
    of building types as well as for individual
    constructions tasks

4
Parametric Estimating II
  • Relates all costs of a project to just a few
    physical measures, or parameters, that reflect
    the size or scope of the project
  • Warehouse - the parameter would be gross
    enclosed floor area
  • With good historical records on comparable
    structures, parameter costing can give reasonable
    levels of accuracy for preliminary estimates

5
45,000 SF Elementary School
  • 140 x 321, 12 high, 4 foundation wall, 4
    SOG, Concrete Block w/ face brick, Metal deck w/
    open web steel joist
  • General Condition and Profit at 15
  • 1/2 year escalation at 2.5 / year
  • Fixed Equipment Sound System 7,000, Smoke
    Detector 9 _at_ 128
  • Site Development Landscaping 12,000, Site
    Works 5,000, Site Utility 40,000, Flag Pole
    1,400, Car Park 60 _at_ 500
  • Site Ac/Dem 50,000, Movable Equipment 600
  • Professional Fee s7, Contingencies 10,
    Administrative 2 of total construction cost

6
Types of Agreements
  • Lump-sum agreement
  • Unit-price agreement
  • Cost plus fee agreement
  • Percentage fee
  • Fixed fee
  • Fixed fee with GMP
  • Sliding scale fee
  • Fixed fee with a bonus and penalty

7
Agreement Provisions
  • Scope of the work
  • Time of completion
  • Contract sum
  • Progress payments
  • Retained percentage
  • Schedule of values
  • Work in place and stored materials
  • Acceptance and final payment

8
Construction Bonds
  • Bid Bond
  • Performance Bond
  • Payment Bond
  • 0.3 2 of the penal amount of bond

9
Construction Insurance
  • Workers Compensation Insurance
  • Builders Risk Insurance

10
Specifications
  • Invitation to bid
  • Instructions to bidders
  • Bid forms
  • Form of owner-contractor agreement
  • Form of bid bond
  • Form of performance bonds
  • Alternates
  • General conditions of the contract
  • Supplementary general conditions
  • Technical Trade Sections