Title: Summary of MAG High Capacity Transit Study
1Summary of MAG High Capacity Transit Study
- June 2003
- Commuter Rail Summary
2Comparison of Rail Technology and Peer Systems
Comparison
3High Capacity Transit Alternatives
4Commuter Rail
Detailed Review
5MAG Region Rail Status
6BNSF Existing Conditions
- No Existing Signal System
- MAX Speed 49 MPH
- 100 Foot Right-of-Way
- 4-5 Trains Daily
7BNSF Commuter Rail Potential
- Existing Freight Operations Limit Passenger
Operation - Right-of-Way is Suitable for Second Track
- Upgrades/Changes Desired for Implementing
Commuter Rail - New Signals
- Second Track
- Lengthen Sidings
- Reduce Main Track Switching Activity
8UP Existing Conditions
- Main Track is Signalized
- MAX Speeds 15 to 60 MPH
- 100 Foot Right-of-Way
- 6 Daily Trains
9UP Commuter Rail Potential
- Requires Coordination of Schedules with Freight
Traffic - Future Upgrades
- Replace Signal Systems
- Upgrade Rails
- Replace Ties
- Industrial Branches Require
- Signals
- Protected Grade Crossings
10Operational Issues
- Ownership
- Agency Purchases Rail Line
- Agency Leases Rights
- Freight/Passenger Capacity Conflicts
- Scheduling
- Dispatching
- Track Capacity Enhancements
- Grade Crossings
- Noise Impacts
- Track Noise and Whistle Noise
11Operational Issues (cont.)
- Capital Needs
- Track Enhancements
- Stations
- Rolling Stock
- Station Impacts
- Traffic Issues
- Governance Structures
- Local Transit Agency
- Joint Powers Authority
- Regional Planning Agency
12Commuter Rail
- Phase 1 Service
- 3 Peak Period Trains, inbound a.m., outbound p.m.
- Phase 3 Service
- 15 minute peak service inbound
- 30 minute peak service outbound
- Off-peak service (30 to 60 minute frequency)
- Reverse commute
- Intermediate phasing will vary by corridor,
ridership, funding
13Commuter Rail Phasing
14Dallas Area Rapid Transit (DART) Subsidy per
Passenger
Source Dallas Area Rapid Transit (DART) FY 2005
Business Plan FY 02 FY 04 Actual FY 05B
Budget FY 06P Projected
15Commuter rail study update
- Review of peer commuter rail systems
- Rail conditions operations
- Statewide and region
- Freight
- Ridership projections
- Capital operating costs
- Implementation steps
16Possible Next Steps
- Coordinate with ADOT on statewide strategy.
- Commuter rail
- Freight issues
- Convene regional stakeholders.
- Develop draft scope of work to update commuter
rail study. - Issue RFP and select consultant.
- July 2007 begin work.
17Dallas Trinity Railway Express
Source Dallas Area Rapid Transit (DART) FY 2005
Business Plan FY 02 FY 04 Actual FY 05B
Budget FY 06P Projected
18Dallas Trinity Railway Express Key Performance
Indicators
Source Dallas Area Rapid Transit (DART) FY 2005
Business Plan FY 02 FY 04 Actual FY 05B
Budget FY 06P Projected
19Dallas Trinity Railway Express FY 2005 Cost Model