Title: LCLS Girder Support Concept Design
1LCLS Girder SupportConcept Design
- Sushil Sharma and Brian Rusthoven
2General Design
- 18 Support Tube
- 1½ Support Plates
- Sand Filled
- 3 Wool Fiber Insulation
- 1½ Anchor Bolts
3Alignment Features
- Cam Mover Support Pocket
- 1 Beam Direction Movement
- 1 Transverse BDM
- Removable Z Axes Guides
4Preliminary Installation Alignment Plans
- Align Grouting Plates at Lattice Locations
- Available Adjustment ½ (12.7 mm)
5Preliminary Installation Alignment Plans
- Anchor Grouting Plates at Lattice Locations
6Preliminary Installation Alignment Plans
- Add Grout under Grouting Plates at Lattice
Locations
7Preliminary Installation Alignment Plans
- Rough 5mm position Support Stands on Grout
Plates - Final position later from MMR numbers
8Preliminary Installation Alignment Plans
- Fill Support Stands
- Add Silica sand to stand pipe
- Cap Stand with Cap Plate
- Add 3 Fiber wool Insulation to stand
9Preliminary Installation Alignment
PlansMagnet Measurement Room
- Loosely attach CAM Movers to CAM Support Plates
using the alignment grooves that utilizing the
tight machined tolerances of the CAM Housing
10Preliminary Installation Alignment
PlansMagnet Measurement Room
- Position Girder on CAM Movers to Specifications
Required - Secure CAM Movers to CAM Support Plate
- Record dimension between CAM Support Plates for
use in final stand positioning
11Preliminary Installation Alignment Plans
- Precision position Support Stands on Grout Plates
using dimensions obtained from MMR measurements
and CAM Mover Support plate grooves.
12Preliminary Installation Alignment PlansFinal
Installation
- Using dimensions obtained from MMR measurements
position CAM Mover Support plate sub-assembly on
support stands and precision position using plate
mover mechanism.
13Preliminary Installation Alignment PlansFinal
Installation
- Install Undulator Assembly on CAM Movers using
Girder Cart.
14Preliminary Installation Alignment PlansFinal
Installation
- Remove CAM Support Plate moving mechanism and
install Earth Quake Restraints
15Preliminary Installation Alignment
PlansElevation Adjustment Guides
- Elevation adjustment guides are to be installed
prior to lifting the support for height
adjustment.
16Preliminary Installation Alignment
PlansElevation Adjustment Guides
- After the Elevation adjustment guides are
installed the Air Jack system can be used to
remove most of the weight from the stand.