AirTrain Q - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

AirTrain Q

Description:

Increased competition from other airports within the region ... Rolling Stock (AirTrain Q) Prognosis: Estimate that 40% of passengers will use the AirTrain Q ... – PowerPoint PPT presentation

Number of Views:86
Avg rating:3.0/5.0
Slides: 13
Provided by: kris190
Category:
Tags: airtrain

less

Transcript and Presenter's Notes

Title: AirTrain Q


1
AirTrain Q Vilnius Airport railway connection
  • Kristian Nygård
  • International Tourist Consultants
  • www.touristconsultants.com
  • May 2007

2
Background
  • Growth in traffic and passenger flying from
    Vilnius Airport
  • Increased competition from other airports within
    the region
  • Problems with transportation to and from the
    airport at present
  • At present, only slow local bus route exist,
    which does not stop at Central Rail Station
  • Nearest railway station is Kirtimai -
    approximately 1 km from airport terminal
  • Existing railway line running next to the airport
  • Lower cost of establishment

3
Idea
  • To expand the railway infrastructure to, from and
    around Vilnius Airport

4
Within Vilnius
  • Shuttle train on short haul route (AirTrain Q)
    every 30 minutes Naujoji Vilnia-Vilnius Railway
    Station-Vilnius Airport

5
Regional traffic
  • Selected medium- and long haul trains to continue
    from Vilnius Railway Station to the Airport ie.
  • Kaunas
  • Siauliai
  • Ignalina
  • Minsk
  • Kaliningrad

6
Necessary actions and investments (long term)
  • Railway tracks
  • Double traction from airport to Vilnius Railway
    Station
  • Electrification

7
Buildings
8
Airport Station
  • Station building
  • Ticket sales
  • Kiosk
  • 3 tracks
  • 2 platforms

9
Rolling Stock (AirTrain Q)
  • Prognosis
  • Estimate that 40 of passengers will use the
    AirTrain Q
  • Annual passengers 1,5 million
  • Daily number of trains 32
  • 55 passengers per train 15 others (employees
    etc.)
  • Average number of passengers per train 70
  • Desired capacity 120-130 seats per train

10
Result/possible effects
  • A modern airport with an up-to-date
    infrastructure
  • An integrated region
  • Growth in airline traffic
  • Growth in railway traffic
  • Easier access to airport

11
Necessary actions (short term)
  • Financing
  • Feasibility Study

12
Future / possibilities for expansion
  • Minsk Air Link / Minskas Oro Linkas
  • Direct non-stop connection Minsk-Vilnius
    Central Station-Vilnius Airport
Write a Comment
User Comments (0)
About PowerShow.com