Scheduler Overview - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Scheduler Overview

Description:

Information from published Scheduler board (import) ... Status update (ready/running/interrupted/complete) www.pace2020.com | See the possibilities... – PowerPoint PPT presentation

Number of Views:33
Avg rating:3.0/5.0
Slides: 13
Provided by: roberto7
Category:

less

Transcript and Presenter's Notes

Title: Scheduler Overview


1
Scheduler Overview
  • Fusion 08
  • John Berenguer

2
10,000 Foot View
  • Integrated systems
  • ePace Browser-based
  • Scheduler Windows based
  • Server application on Windows Server as service.
  • Workstation client on Windows PC.
  • Database on ePace appliance.

3
10,000 Foot View
  • Moving parts
  • Estimate converted to Job
  • Creates Job Planning records.
  • EDI moves ePace Job Plan info to Scheduler inbox
    (export)
  • Schedulable jobs
  • Designer plans schedule and adopts the board
  • EDI updates ePace Job Planning record
  • Information from published Scheduler board
    (import)
  • Data Collection updates published Scheduler board
  • Real-time via TCP/IP packet

4
ePace Procedures
  • Activity code Setup
  • Planning integration
  • Set to schedulable.
  • Rollup
  • If needed to group functions on same piece of
    equipment.
  • As if complete
  • D/C interface automatically removes entry from
    board.

5
ePace Procedures
  • Creating job planning recs
  • Estimate Convert
  • Automatic if system is configured to do so

6
ePace Procedures
  • Scheduler/EDI
  • Launch from menu - Production/JobPlanning/Run
    Scheduler EDI
  • Data Collection
  • Status update (ready/running/interrupted/complete)

7
Scheduler Procedures
  • Tray vs. Board
  • Tray is the inbox where you choose what goes on
    board.
  • Board is where you see your availability/load.
  • Design vs. Monitor
  • Design is your sandbox hypothetical
  • Monitor is the published active board - official
  • Resource vs. Activity Code
  • Resource is something you are scheduling in
    Scheduler.
  • Activity code is a process in ePace.

8
Scheduler Procedures
  • Display options
  • Workstation specific
  • Background color/bar color/tags
  • Down bars
  • Also called proforma your plant holiday/shift
    schedule
  • Scale
  • User-defined, workstation specific
  • Short run shop use small scale, long run shops
    large scale

9
Scheduler Procedures
  • Moving jobs
  • drag/drop/fix left/reassign
  • Resource view
  • See all jobs for a selected resource

10
Scheduler Procedures
  • Job view
  • Displays job summary info.
  • Displays job part info.
  • Production list
  • Displays each scheduled activity in grid format.
  • Summary at bottom of board
  • Displays key information for selected process.

11
Reports
  • Reports
  • Capacity

12
Questions and Answers
Write a Comment
User Comments (0)
About PowerShow.com