Significant Changes for the 2006 Constrained LongRange Plan - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

Significant Changes for the 2006 Constrained LongRange Plan

Description:

Anacostia Area Streetcar Project. Build the first phase of the streetcar line from Firth Sterling Ave. and S. ... Anacostia Streetcar. Study (Phases II-IV) ... – PowerPoint PPT presentation

Number of Views:40
Avg rating:3.0/5.0
Slides: 10
Provided by: andrewa6
Learn more at: https://www.mwcog.org
Category:

less

Transcript and Presenter's Notes

Title: Significant Changes for the 2006 Constrained LongRange Plan


1
Significant Changes for the 2006 Constrained
Long-Range Plan
March 3, 2006
2
Summary List of Changes
  • District of Columbia
  • South Capitol Street Corridor with Frederick
    Douglas Memorial Bridge Improvements
  • 11th Street Bridges and Corridor Improvements
  • Anacostia Streetcar Project
  • Virginia
  • 4. Upgrade VA 28 at I-66 Interchange

3
South Capitol Street Corridor with Frederick
Douglas Memorial Bridge ImprovementsBetween
Independence Ave. and Martin Luther King, Jr.
Blvd.
  • Convert South Capitol Street from an urban
    highway to a grand six-lane boulevard. Construct
    a newly aligned, six-lane Frederick Douglas
    Bridge.
  • Length 3.5 miles
  • Cost 625 million
  • Complete 2015
  • http//www.southcapitoleis.com/http//www.southca
    pitolstreetbridgestudy.com/

4
11th Street Bridges and Interchange
ReconstructionBetween the Anacostia Freeway and
the Southeast Freeway
  • Replace and reconfigure the 11th Street Bridges.
    One bridge would be limited to freeway traffic,
    carrying four lanes in each direction. The second
    bridge would carry local traffic on two lanes in
    each direction. New ramps east of the river would
    connect both directions of the Anacostia Freeway
    with each span.
  • Length 1 mile
  • Cost 377 million
  • Complete 2011
  • http//www.11thstreetbridgeseis.com/default.asp

5
Anacostia Area Streetcar Project
  • Build the first phase of the streetcar line from
    Firth Sterling Ave. and S. Capitol St. to Howard
    Rd. and MLK, Jr. Ave. The remaining three phases
    of the project will be included in the CLRP for
    study.
  • Cost ?
  • Complete 2011

6
4. Upgrade VA 28 at I-66 Interchange
  • Eliminate turn movements and implement signal
    timing changes on VA 28 near the I-66 interchange
    at three locations
  • VA28 and Braddock/Walney Road
  • VA 28 and ramps to westbound I-66 (northern)
  • VA 28 and ramps from eastbound I-66 (southern)
  • Cost 750,000
  • Complete 2008
  • http//www.28freeway.com

7
New Studies
  • District of Columbia
  • S1. Anacostia Streetcar Study (Phases II-IV)
  • Virginia
  • S2. Study HOV/HOT Lanes on I-95 and I-395

8
New Studies
  • District of Columbia

S1. Anacostia Streetcar Study (Phases II-IV)
  • Phase II Firth Sterling and South Capitol Street
    to Malcolm X Avenue
  • Phase III Howard Road and MLK, Jr., Avenue to
    Good Hope Road and Minnesota Avenue
  • Phase IV MLK, Jr. Avenue over the 11th Street
    Bridge on M Street, SE to South Capitol Street.
  • Length Approximately 4 miles
  • Complete ?
  • Cost ?

9
New Studies
  • Virginia

S2. Study Proposal to Build and Operate HOV/HOT
Lanes on I-95/I-395From the Virginia state line
to the I-95 Massaponax exit in Spotsylvania
County
  • Develop environmental documents for a proposal to
    build HOT lanes from the private sector.
  • Length 47 miles
  • Completion 2007
  • Cost 380,000
Write a Comment
User Comments (0)
About PowerShow.com