Title: Wild Horse Solar Demonstration Project


1
Wild Horse Solar Demonstration Project
2
Agenda
3
Project Overview
  • 500 kW (STC) solar facility to be located at the
    Wild Horse
  • Wind Farm
  • Optional bid for additional 500 kW
  • Preference for Ownership

4
500 kW Located at Two Sites
Quarry Site 450 kW
Operations Center 50 kW
5
Solar Interconnection Near Operations Center
Road
480 Vac
Solar Field
480 V
200Vac 480 Vac Xfrmr
34.5 kV Line
DC-AC Inverter
600V DC Line
6
Solar Interconnection Near Quarry
34.5kV
Solar Field
34.5kV 480 V Xfrmr
480 V
34.5 kV Line
200 Vac 480 Vac Xfrmr
AC-DC Inverter
600 V DC Line
7
Scope
  • Looking for Fixed Price / Fixed Schedule Contract
  • Engineering, Procurement, Construction and
    Start-Up
  • Interconnection
  • PSE will permit the facility for most
    technologies
  • Warranted Work
  • 5 year workmanship and performance warranties
  • 20 year manufacturer warrantees
  • Full Monitoring and Benchmarking
  • Education Display

8
Frequently Asked Questions
9
Evaluation Criteria
  • Cost (Levelized /MWh)
  • Bidder Qualifications
  • Proposal Completeness
  • Credit
  • Environmental Impact
  • Proven Technology Robust Design
  • Local Supply and WA Solar Industry Development
  • Schedule

10
FAQ Continued
  • Q Should bids include Washington State Sales Tax
    in their lump-sum offer?
  • A Bids should be inclusive of all state and
    federal taxes necessary to complete the work.
    However please note that there is an exemption to
    Washington State Sales Tax for solar equipment.
  • Details of the sales tax exemption may be found
    at http//apps.leg.wa.gov/WAC/default.aspx?cite4
    58-20-263

11
FAQ Continued
  • Q At what depth are foundations required to be
    buried to avoid frost heave?
  • A Kittitas County requires foundations to be
    buried at a minimum of two feet.
  • Q Can you elaborate on what PSE means by
    "environmental attributes" in section 1.8.2?
  • A Environmental attributes refers to any and all
    environmental attributes such as Renewable Energy
    Credits ("RECs" or "Green Tags") or emission
    credits that may result from the solar project.

12
FAQ Continued
  • Q Does the recent extension on the Investment
    Tax Credit through 2008 effect the project
    timing?
  • A PSE continues its desire for a project that
    meets substantial and final completion in 2007.
    If there are significant reasons why a Contractor
    feels a 2008 project is advantageous, a bid for a
    2008 project may be submitted.
  • Q If a PPA is offered, will rent be charged by
    PSE for use of the land?
  • A If a PPA is offered, it shall assume that PSE
    will offer a nominally priced lease for the
    20-year life of the project (e.g. 1 for a 20
    year lease).