Title: CURRENT STATUS OF STEP Module 5 Estimated Viewing Time: 30 Minutes
1CURRENT STATUS OF STEPModule 5Estimated
Viewing Time 30 Minutes
STEP MANAGEMENT OVERVIEW
2- Sponsored By
- The National Institute of Standards Technology
- Developed Under Contract by
- Product Data Integration
- Technologies, Inc.
- 100 W. Broadway, Suite 540
- Long Beach, CA 90802
-
3Topics for This Module
- STEP Current Development Status
- This section describes the availability of STEP
resources and Application Protocols for use by
industry. - STEP Current Implementation Status
- This section describes the state of industry
implementation of STEP and the availability of
supporting development and implementation tools.
4- STEP Current Development Status
5When is STEP available?
- Basic STEP capability has been available since
December 1994. - 12 Parts registered as ISO 10303 international
standards in December 1994. This is the Initial
Release. - This includes 2 APs (Part 201) address the
exchange of 2D drawing data and (Part 203) 3D
design data under configuration control and
included in the 12 parts. - Continuing STEP development schedule is
aggressive (as of 1/1/96) - 10 APs are in different stages of ballot cycle
to be standardized. - 7 additional APs have industrial validation and 3
of them are technically complete. - 11 new APs have been approved as active
development projects.
6STEP Development Industry-Specific Views (1 of 2)
- Discrete Manufacturing
- Product Design Configuration Management
- Core Data for Automobile Industry
- CAD System Shape Geometry for Mechanical Product
Design - Engineering Drawing Information
- Manufacturing Technologies Composites, NC
Process Planning, Casting, Forging - Electrical and Electronics
- PCA, PCB and Component Design
- Electronic Test Diagnostic and Remanufacture
- Electrotechnical Plant Design and Installation
7STEP Development Industry-Specific Views (2 of 2)
- Architecture and Construction
- Building Element Shape Design
- Ship Building
- Building Construction Core Model
- Building Services Heating, Ventilation and AC
- Building Structural Frame Steelwork
- Process Plants
- Plant Spatial Configuration
- Plant Functional Design
- Process Engineering
8AP Current Development Status (as of 1 Jan 1996)
IS
201 202 203 204 205 207 208 209 210 211
212 213 214 215 216 217 218 220 221 222
223 224 225 226 227 228 229 230 231
DIS
Standardize
CD
Specification
AIM
ARM
Requirements
AAM
9STEP CURRENT IMPLEMENTATION STATUS
10STEP Usage and Implementation
- Many companies are experimenting with various
implementations, several are at the pilot or
production usage stage. - Some commercial CAD vendor translators are
available, with many more are under development
UNIGRAPHICS, CATIA, ProEngineer. - Many commercial software toolkits are available
for development, STEP browsing, and
implementation. - Training and consulting services are commercially
available for STEP development and implementation.
11Current Implementation Status
- Example Application Protocol Prototype, Demo,
- and Pilot Development Projects in the U.S.
- AEROSTEP AP203 (Boeing, GE)
- AWS AP203 (IBM, Lockheed, NG)
- GM/EDS Prototype AP207 (GM/EDS)
- PAS-C AP209 (Lockheed, Vought, Boeing)
- PAP-E AP211 (Intermetrics, TRW, WH)
- PDXI AP 231 (Chevron, DuPont, and others)
- PlantSTEP AP 227 (The top
10 Plant Design Vendors) - PREAMP AP210,AP 220 (Hughes, MMA, Rockwell,
Boeing) - RASP AP210 (Ford, UTC, Hughes, MMA, TI)
- PEP AP201 and 203 (DoD Joint Center -
FCIM/IPDE) - RAMP AP224 (Grumman)
12STEP Centers
Examples of established centers to accelerate the
development and implementation of STEP
PDES, Inc. - US, UK aerospace/automobile PROSTE
P - Germany automobile Japan STEP Center -
Japan C-STEP - China PISTEP
- UK process PlantSTEP - US and Japan
process ind. PDXI - US and Europe process
ind. Natl PDES Testbed - US GOSET -
France STEP Data Ex. Ctr. - Australia
13STEP Production Software Tools -- (1 of 2)
- ORGANIZATION SOFTWARE TOOLS
- Cadlab ICE Toolset
- Canonical ExWare
- CIMIO EXPRESS-M schema mapping
- CSTB SPDI Station
- DCM DCMem
- DEC DECexpress
- EPM EDM
- Erlangen fedex
- Fraunhofer-IGD Xpresso
as of 1/1//96
14STEP Production Software Tools -- (2 of 2)
- ORGANIZATION SOFTWARE TOOLS
- GE EDEX - EDitor for EXpress
- GIDA EXEP Tool Kit
- GOPAS ExpressLab
- IDA Pstep-CaseLib
- ITI(OH) PDE/Lib
- NIST NIST STEP Toolset
- PDIT FirstSTEP Toolkit
- Siemens EXPREME
- STEP Tools ST- Toolkit
- Theorem AP203 browser, editor, viewer
- Versant EXPRESS/STEP
as of 1/1//96
15Leading CAD/CAM HW SW Mfgrs
Ranked by 1992 Market Share
Unknown
IBM
Hewlett Packard
Legend
Implementing STEP
Mentor Graphics
No current
commitments
Autodesk
Intergraph
Cadence Designer Sys,
Computervision
Source Electronic Business, April 93, p 75
16CAD/CAM Sector's Top 10 in 1994
Software Revenue Totaled 4.1B
Cadence Design Sys.
Intergraph
IBM
Computervision
Parametric
Autodesk
EDS Unigraphics
SDRC
Legend
Mentor Graphics
Implementing STEP
No current commitments
Synopsys
Unknown
Hausman, Eric, "CAD/CAM Sector's Top 10, "
Computer Reseller News, Dec 5, 1994
17CAD/CAM/CAE Software Market
Projected Revenue of Top 7 - 1995
Unknown
Legend
Implementing STEP
No current
commitments
Struct. Dynamics
Synopsys Inc.
Autodesk
Computervision
ParametricTech
IBM/Dassault Systems
Intergraph
Percentages based on 4.6B total market
projection.
Source
Computer
Reseller News
, April 10, 95, n625, p 47(1)
18Plant Design CAD Software Vendors
- Top Five Vendors (and the next three as well) are
all implementing STEP.
20
15
10
Million Revenue
5
0
Dassault
Dassault
(CATIA)
(CATIA)
Intergraph
Intergraph
Source DARATECH 1995 estimates
CADCentre
CADCentre
EA Systems
EA Systems
Computervision
19CURRENT STATUS OF STEPEnd of Module 5