1
E-1-3
  • NPOESS Program and Spacecraft

2
Nunn-McCurdy Impacts to A-DCS on NPOESS
  • NPOESS is dual-funded by NOAA and DOD
  • Nunn-McCurdy law (applies to DOD) required
    re-certification of NPOESS program to Congress
  • This took place June 6th, 2006
  • Recertified program differs in some respects from
    prior program
  • - NPOESS returning to the original concept of
    two orbit planes
  • - Two (sequential) satellites for each plane
  • - NPOESS no longer populating the 2130
    ascending (930 descending) orbit
  • - 2130 orbit did not include A-DCS, so no
    A-DCS impact due to fewer orbit planes
  • - New launch dates (see below)

3
Nunn-McCurdy Impacts to A-DCS on NPOESS (cont.)
  • Initial order for two satellites,
  • - option for additional two to be exercised in
    2010
  • Planned launch dates C1 2013
  • C2 2016
  • C3 2018
  • C4 2020
  • Spacecraft need dates for A-DCS instrument
    approximately 15 months prior to launch
  • Actual spacecraft need dates for A-DCS will be
    developed during NGST replan
  • Program runs through 2026

4
NPOESS Contacts June 2006
  • IPO Payload Hal Bloom hal.bloom_at_noaa.gov
  • Jim Morris James.W.Morris_at_noaa.gov
  • IPO A-DCS Mike Cummings
  • Michael.Cummings_at_noaa.gov
  • NGST A-DCS Massih Hamidi massih.hamidi_at_ngc.com
  • NGST SI Tim Gresham tim.gresham_at_ngc.com
  • ______
  • Massih Hamidi replaced Greg Barber in this
    capacity
  • SISystems Integration (responsible for
    ground interface control documents)
  • Tim Gresham replaced Alexa Davis in this
    capacity

5
Ground Interfaces
  • A-DCS data and telemetry interface via NESDIS,
    not directly from NGST/NPOESS
  • mission data, raw and converted housekeeping
    telemetry
  • For other, direct, interfaces between CNES or CLS
    and NPOESS, NGST would like to utilize a
    web-based system
  • command requests, mission notices, ephemeris

6
Ground Interfaces (cont.)
  • Raw and engineering unit housekeeping telemetry
    to NESDIS  "wrapped" in HDF5.  NESDIS
    responsible for forwarding that data in a
    mutually agreeable format, time frame, etc. 
  • Same as 1 for the A-DCS "mission data
  • NGST will provide an emergency telephone contact
    number to the control center
  • Normal interactions to be through External Web
    Server, to which you will have access
  • Command requests need to be entered into that Web
    Server, from a single authorized source

7
Ground Interfaces (cont.)
  • 6) Peripheral information, comes from the
    External Web Server
  • - examples ephemeris, predicted ephemeris for
    orbit-adjustment maneuver, command history
    during pass, notice of events which could (or
    did) affect the ability of A-DCS to provide
    useful data, etc.
  • 7) Events which also resulted in turning off
    A-DCS (such as red out-of-limit condition, or a
    general Spacecraft Safe Mode) would ALSO be
    communicated to you "directly" , meaning phone,
    FAX, email, or whatever means is found mutually
    satisfactory.
  • 8) Some degree of telemetry analysis available
    via requests to the Web Server.
  • 9) NGST plans to send you ALL mission notices,
    not just the ones that apply to you, and you
    would need to decide if they apply to you or not. 

8
Ground Interface Schedule
  • 17 May - NGST Deliver Accommodation Presentation
    to A-DCS (complete)
  • 24 May - NGST Deliver preliminary ground ICD to
    A-DCS (complete)
  • 9 June - A-DCS provide comments on Accommodation
    Presentation to NGST
  • 16 June - NGST incorporate appropriate
    presentation comments into ICDs, Deliver updated
    ICD to A-DCS
  • 27 June - A-DCS provide comments on ICDs to NGST
  • Week of 10 July - ICD Stakeholder Review -
    discuss any unresolved issues
  • 27 July - NGST Complete ICD comment adjudication
    and update ICDs for NGST Engineering Review Board
    process
  • 18 August - Begin NGST ERB Process
  • 29 September - Complete NGST ERB Process
Write a Comment