Washington, 2425Jan2008 - PowerPoint PPT Presentation

1 / 24
About This Presentation
Title:

Washington, 2425Jan2008

Description:

Washington, 2425Jan2008 – PowerPoint PPT presentation

Number of Views:82
Avg rating:3.0/5.0
Slides: 25
Provided by: CNES5
Category:

less

Transcript and Presenter's Notes

Title: Washington, 2425Jan2008


1
(No Transcript)
2
CNES missions
CNES
  • Make proposals for shaping French Space policy

MISSIONS
  • Represent France in the European Space Agency
    (ESA) and in international institutions

STRATEGY
CENTRES
CST
ORGANISATION
  • Develop centres of excellence for Space system
    technologies
  • Undertake specific missions delegated by the state

PROGRAMMES
OPERATIONS
  • Implement Frances Space strategy

MISSION
2008
2
3
Organisation of the Space sector in France
CNES
MISSIONS
STRATEGY
CENTRES
CST
ORGANISATION
PROGRAMMES
OPERATIONS
MISSION
2008
CNES was created in 1961 as a public
establishment of an industrial and commercial
nature (Epic)
3
4
Strategy and objectives (1/3)
  • The Launchers

CNES
  • The range of launchers

MISSIONS
ARIANE 5
VEGA
SOYUZ
STRATEGY
CENTRES
CST
ORGANISATION
PROGRAMMES
  • Restructuring the sector

OPERATIONS
MISSION
  • Preparing for the future

2008
  • Ensuring controlled development of the Kourou
    Space Base,
  • in French Guiana
  • Carrying out the role delegated to CNES by
  • France as launch nation

7
5
Strategy and objectives (2/3)
CNES
  • General public
  • TV Telecommunications
  • Broadband Internet access
  • Navigation and positioning
  • Health Education

MISSIONS
STRATEGY
CENTRES
CST
ORGANISATION
  • Sustainable development
  • Monitoring changes to our natural
  • environment
  • Rational exploitation of resources
  • Risk mitigation and management

PROGRAMMES
OPERATIONS
MISSION
2008
8
6
Strategy and objectives (3/3)
CNES
  • Space sciences Technologies Preparing for the
    future
  • Participating in scientific programmes
  • Mastering key technologies and innovative
  • concepts

MISSIONS
STRATEGY
CENTRES
CST
ORGANISATION
  • Defence and Security
  • Carrying through missions entrusted to CNES by
    the Ministry of Defence

PROGRAMMES
OPERATIONS
MISSION
2008
9
7
Organisation of CNES
CNES
MISSIONS
STRATEGY
CENTRES
CST
ORGANISATION
PROGRAMMES
OPERATIONS
MISSION
2008
6
8
The Toulouse Space Centre
CNES
MISSIONS
STRATEGY
CENTRES
CST
ORGANISATION
PROGRAMMES
OPERATIONS
MISSION
2008
10
9
Toulouse Space Center Chart
Deputy DirectorPhilippe GOUDY
Director Marc PIRCHER
Claude FRATTER Phase0
Catherine LAMBERT Technic Stimulation Prospects
Anne CADIOU RT
Senior Advisor Alain de LEFFE Michel
AVIGNON Michel BOURDEIL
Claudie PELLAT Public Relations Office
Fernand ALBY Senior Advisor Space Debris
Christian SIRMAIN Project Control
Jean Paul AGUTTES Assistant Director
Radiofrequency
Christophe VALORGE Assistant Director Scientific
Payloads and Imagery
Philippe MARCHAL Assistant Director System
Engineering
Brigitte BEHAL Assistant DirectorGround Segment
and Products
Patrick SAUNIER Assistant DirectorInsurance
Quality
Loic BOLOH Assistant Director Spacecraft
Technologies and Design
Yvon Le GUEN Assistant Director Range Activities
Bernard CABRIERES Assistant Director Flight
Operations
Guy NABET Assistant Director Human Resources
Geneviève CAMPAN Assistant Director Mission
Operation Data production
Christian CAZAUX Assistant Director Integration
Balloons
Lionel SUCHET Assistant Director Orbital
Projects
10
Deputy director
Communication
Lionel SUCHET Assistant Director Orbital
Projects
Patrick SAUNIER Assistant DirectorInsurance
Quality
Radiofrequency
Brigitte BEHAL Assistant DirectorGround Segment
and Products
System Engineering
Christophe VALORGE Assistant Director Scientific
Payloads and Imagery
Spacecraft Technologies and Design
Range Activities
Human Resources
Flight Operations
Balloons
Mission Operation Data production
11
The programmes (1/3)
40 projects in cooperation with 15 countries
CNES
MISSIONS
STRATEGY
CENTRES
CST
ORGANISATION
Symbol X
Corot
Completed
Ongoing
To come ...
PROGRAMMES
OPERATIONS
MISSION
2008
Jason 2
IASI (Weather)
Sifti
Jason 1
13
12
The programmes (2/3)
CNES
CIVILIAN
MISSIONS
STRATEGY
CENTRES
CST
ORGANISATION
Pléiades
Dual-use programme
Spot 1, 2, 3, 4, 5
PROGRAMMES
Completed
Ongoing
To come
OPERATIONS
MISSION
2008
DEFENCE
Helios 2B
Helios 1A, 1B, 2A
14
13
The programmes (3/3)
CNES
MISSIONS
STRATEGY
CENTRES
CST
ORGANISATION
Search and Rescue GALILEO
EGNOS PACF
COSPAS SARSAT
CORE SKILLS
PROGRAMMES
OPERATIONS
MISSION
2008
ALPHABUS Europes platform for
large geostationary satellites
Athena Fidus
14
14
Orbit acquisition and station-keeping operations
CNES
80
satellites placed in orbit at this time
MISSIONS
STRATEGY
?6 satellites placed in orbit from a single
Ariane 5 launch
CENTRES
CST
ORGANISATION
CORE SKILLS
2
PROGRAMMES
telecommunication satellites
OPERATIONS
10
Earth observation satellites
MISSION
4
science satellites
2008
?1 ATV control centre
15
15
Mission model
16
Mission operations some examples
CNES
Jason1 2 Doris Precise localisation Oceanography
S3
MISSIONS
STRATEGY
CENTRES
CST
ORGANISATION
A-Train Parasol- Calipso IASI / METOP
PROGRAMMES
OPERATIONS MISSIONS
2008
17
17
Mission operations some example
CNES
Galileo LEOP, signals, Expertise,
performances, etc
MISSIONS
EGNOS PACF Performance and Operations
STRATEGY
CENTRES
CST
ORGANISATION
PROGRAMMES
French Mission Control Center Evolution gt MEOSAR
OPERATIONS
MISSION
2008
18
18
Mission operations some examples
CNES
MISSIONS
STRATEGY
CENTRES
CST
ORGANISATION
CORE SKILLS
PROGRAMMES
OPERATIONS
MISSION
2008
19
19
2008
CNES
MISSIONS
STRATEGY
CENTRES
CST
ORGANISATION
PROGRAMMES
OPERATIONS
MISSION
2008
15
20
ATV System
ATV
Localization
ISS
GPS
TDRSS
TDRSS
ISS Data
Artemis
Telemetry Telecommands
ISS Mission Control Center - Moscow
Operational Coordination ATV and ISS data
21
ATV Operational Scenarios
Docking
Collision Avoiding manuvre

attached phase
Pacific Océan
22
Rendez-vous
KOS 200 m range sphere
Keep-out Sphere
Approach Ellipsoïd
AE 1x1x2 km Ellipsoïd
Approach corridor 10 degrees cone
Approach corridor
AE Zone where crew may stop the Rendez-vous
KOZ zone accessible through the approach
corridor only
S3
Vbar
-3500 m -100 m
-250 m
RF Link to ISS R 30 km
Docking Port
Z 5000 m
Rbar
-43000 m
23
ATV film

atv sequence_sept 2005.mov
24

Thanks for your attention
Write a Comment
User Comments (0)
About PowerShow.com